Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Continuation of advanced crew procedures development techniques

An operational computer program, the Procedures and Performance Program (PPP) which operates in conjunction with the Phase I Shuttle Procedures Simulator to provide a procedures recording and crew/vehicle performance monitoring capability was developed. A technical synopsis of each task resulting in the development of the Procedures and Performance Program is provided. Conclusions and recommendations for action leading to the improvements in production of crew procedures development and crew training support are included. The PPP provides real-time CRT displays and post-run hardcopy output of procedures, difference procedures, performance data, parametric analysis data, and training script/training status data. During post-run, the program is designed to support evaluation through the reconstruction of displays to any point in time. A permanent record of the simulation exercise can be obtained via hardcopy output of the display data and via transfer to the Generalized Documentation Processor (GDP). Reference procedures data may be transferred from the GDP to the PPP. Interface is provided with the all digital trajectory program, the Space Vehicle Dynamics Simulator (SVDS) to support initial procedures timeline development.

Arbet, J. D.↗

Tug ground operations - An approach to early identification of operational impacts

An approach to early identification of operational requirements is discussed together with an assessment of the impact of these requirements on the development and acquisition phase of a program. The approach is applied to the Space Tug program. Some of the more salient results of the Tug Fleet and Ground Operations Schedules and Controls study performed under a NASA/Marshall Space Flight Center contract are provided. Ground-processing requirements and flows are presented, including a summary of facility requirements, timelines, activities and options/contingency-provision recommendations. Programmatic recommendations resulting from the study are presented in areas of payload integration, activation requirements, fleet utilization, fleet sizing, costs, and WTR delta requirement for the Tug.

Best, J. L.↗

EVAL system concept definition. Partial spacelab payload, appendices

Tables and charts are presented for experiment schematics, mission opportunities, mission timelines, crew time line and power profile. The methodology being developed to evaluate cost effective vibroacoustic test plans for a representative EVAL shuttle spacelab payload is analyzed. Statistical decision theory is used to quantitatively evaluate seven alternate test plans which include component, subassembly, or payload testing and combinations of component assembly testing.

Source record↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Space station systems analysis study. Part 2, volume 3: Appendixes, Book 2: Supporting data (7 through 18)

Topics discussed include: (1) design considerations for a MARS sample return laboratory module for space station investigations; (2) crew productivity as a function of work shift arrangement; (3) preliminary analysis of the local logistics problem on the space construction base; (4) mission hardware construction operational flows and timelines; (5) orbit transfer vehicle concept definition; (6) summary of results and findings of space processing working review; (7) crew and habitability subsystem (option L); (8) habitability subsystem considerations for shuttle tended option L; (9) orbiter utilization in manned sortie missions; (10) considerations in definition of space construction base standard module configuration (option L); (11) guidance, control, and navigation subsystems; and (12) system and design tradeoffs.

Source record↗

Structural and assembly concepts for large erectable space systems

This paper presents a summary of studies performed by the Space Division of Rockwell under contract to the Langley Research Center of the NASA. The studies specifically addressed requirements and concepts for erectable structures ranging in size from 100 to 300 meters using the Shuttle Orbiter as the operation/assembly base. This paper discusses various types of structural configurations and building block elements and the criteria which influence their designs. A brief review is given concerning the subject of flight control. An assembly concept is presented - showing how the Orbiter may be equipped and operated to build large area structures. Estimates are also given for cargo bay stowage and mission timelines.

Katz, E.↗

Simulated EVA operation of a remote connector assembly test report

The features of a connector concept with respect to timelines and ease of connection by EVA (extravehicular activity), in various mating orientations were evaluated. The connector tests were conducted by thee EVA astronaut test subjects. Each of four test conditions (baseline, off angle, overhead, and with visual obstruction) were run three times by each of the test subjects. Time data were taken on each test run. Visual and voice communications with the subjects were recorded. The tests demonstrated that EVA personnel can perform connection tasks in relatively short times (generally one minute) and the connector configuration was a reasonable design base for such tasks. The in-situ communications and post-test comments indicated that the connector was generally acceptable but requires improvement to its manual interface features.

Lefever, A.↗

Thermal integration of Spacelab experiments

The method of thermally integrating the experiments for Spacelab is discussed. The scientific payload consists of a combination of European and United States sponsored experiments located in the module as well as on a single Spacelab pallet. The thermal integration must result in accomodating the individual experiment requirements as well as ensuring that the total payload is within the Spacelab Environmental Control System (ECS) resource capability. An integrated thermal/ECS analysis of the module and pallet is performed in concert with the mission timeline to ensure that the agreed upon experiment requirements are accommodated and to ensure the total payload is within the Spacelab ECS resources.

Patterson, W. C.↗

First Spacelab flight - A status report of the joint ESA/NASA mission

A general overview of the first Spacelab flight is presented and a table is given listing the payload composition. An accommodation study is presented with emphasis on the configuration, mass status, timeline, and experiment interface specifications. Also considered are flight and ground operations, safety factors, and payload specialists training for the first flight.

Craft, H. G., Jr.↗

Shuttle orbiter TPS flight repair kit development

The design and application of a TPS repair kit is presented. The repair kit is designed for on orbit use by a crew member working in the manned maneuvering unit (MMU). The kit includes the necessary equipment and materials to accomplish the repair tasks which include the following: HRSI emittance coating repair, damaged tile repair, missing tile repair, and multiple tile repair. Two types of repair materials required to do the small area repair and the large area repair are described. The materials area cure in place, silicone base ablator for small damaged areas and precured ablator tile for repair of larger damaged areas is examined. The cure in place ablator is also used as an adhesive to bond the precured tiles in place. An applicator for the cure in place ablator, designed to contain a two-part silicon compound, mix the two components at correct ratio, and dispense the materials at rates compatible with mission timelines established for the EVA is described.

Source record↗

Space construction and utility distribution

Technology advancement to effect an orderly development program leading to construction of space platforms was defined, in a program that utilized a viable platform and service module concept with concise OSS/OAST mission and payload models. Consideration was given to concepts for alternate platform servicing of the payloads described in the model. Using the baseline configuration, issues pertinent to platform development as well as orbit emplacement and operation and on orbit construction methodology were analyzed. These analyses provided the following data: (1) payload definitions and installation options; (2) identified structural and subsystems options; (3) developed integrated platform system concepts; and (4) identified technology deficiencies and recommended technology development timelines.

Bloom, K. A.↗

Capillary acquisition devices for high-performance vehicles: Executive summary

Technology areas critical to the development of cryogenic capillary devices were studied. Passive cooling of capillary devices was investigated with an analytical and experimental study of wicking flow. Capillary device refilling with settled fluid was studied using an analytical and experimental program that resulted in successful correlation of a versatile computer program with test data. The program was used to predict Centaur D-1S LO2 and LH2 start basket refilling. Comparisons were made between the baseline Centaur D-1S propellant feed system and feed system alternatives including systems using capillary devices. The preferred concepts from the Centaur D-1S study were examined for APOTV and POTV vehicles for delivery and round trip transfer of payloads between LEO and GEO. Mission profiles were determined to provide propellant usage timelines and the payload partials were defined.

Blatt, M. H.↗

NASA TLA workload analysis support. Volume 1: Detailed task scenarios for general aviation and metering and spacing studies

The techniques required to produce and validate six detailed task timeline scenarios for crew workload studies are described. Specific emphasis is given to: general aviation single pilot instrument flight rules operations in a high density traffic area; fixed path metering and spacing operations; and comparative workload operation between the forward and aft-flight decks of the NASA terminal control vehicle. The validation efforts also provide a cursory examination of the resultant demand workload based on the operating procedures depicted in the detailed task scenarios.

Sundstrom, J. L.↗

Supporting research and technology for automotive Stirling engine development

The technology advancement topics described are a part of the supporting research and technology (SRT) program conducted to support the major Stirling engine development program. This support focuses on developing alternatives or backups to the engine development in critical areas. These areas are materials, seals control, combustors and system analysis. Specific objectives and planned milestone schedules for future activities as now envisioned are described. These planned SRT activities are related to the timeline of the engine development program that they must support.

Tomazic, W. A.↗

STS-1 operational flight profile. Volume 5: Descent, cycle 3

The trajectory data presented are to be used for orbiter systems and subsystems evalation, flight and mission control center software verification, flight techniques and timeline development, crew training, and evaluation of operational mission suitability. The entry profile is very similar to cycle 2, however, elevon and body flap temperature margins have increased and the elevon schedule was changed. The terminal area energy management (TAEM) profile was completely reshaped to conform with new angle of attack constraints and left hand turn around the heading alignment cylinder. Also, the entry/TAEM interface was adjusted to minimize guidance induced angle of attack transients across the interface. The approach and landing phase was reshaped for a 20 deg glideslope and reduced velocity at touchdown. The definition of the runway threshold was standardized for all landing sites. This results in a shift at Edwards Air Force Base in aim points and touchdown relative to the threshold of 1000 feet. The rollout remains essentially unchanged with the exception of the speedbrake, which is now deployed to 50 percent at touchdown.

Moore, R.↗

Retrieval techniques: LVLH and inertially stabilized payloads

Procedures and techniques are discussed for retrieving payloads that are inertially or local vertical/local horizontal (LVLH) stabilized. Selection of the retrieval profile to be used depends on several factors: (1) control authority of the payload, (2) payload sensitivity to primary reaction control system (PRCS) plumes, (3) whether the payload is inertially or LVLH stabilized, (4) location of the grapple fixture, and (5) orbiter propellant consumption. The general retrieval profiles recommended are a V-bar approach for payloads that are LVLH or gravity-gradient stabilized, and the V-bar approach with one or two phase flyaround for inertially stabilized payloads. Once the general type of profile has been selected, the detailed retrieval profile and timeline should consider the various guidelines, groundrules, and constraints associated with a particular payload or flight. Reaction control system (RCS) propellant requirements for the recommended profiles range from 200 to 1500 pounds, depending on such factors as braking techniques, flyaround maneuvers (if necessary), and stationkeeping operations. The time required to perform a retrieval (starting from 1000 feet) varies from 20 to 130 minutes, depending on the complexity of the profile. The goals of this project are to develop a profile which ensures mission success; to make the retrieval profiles simple; and to keep the pilot workload to a minimum by making use of the automatic features of the orbiter flight software whenever possible.

Yglesias, J. A.↗

Environmental control and life support system: Analysis of STS-1

The capability of the orbiter environmental control and life support system (ECLSS) to support vehicle cooling requirements in the event of cabin pressure reduction to 9 psia was evaluated, using the Orbiter versions of the shuttle environmental consumbles usage requirement evaluation (SECURE) program, and using heat load input data developed by the spacecraft electrical power simulator (SEPS) program. The SECURE model used in the analysis, the timeline and ECLSS configuration used in formulating the analysis, and the results of the analysis are presented. The conclusion which may be drawn drom these results. is summarized. There are no significant thermal problems with the proposed mission. There are, however, several procedures which could be optimized for better performance: setting the cabin HX air bypass and the interchanger water bypass to the zero flow position is of questionable efficacy; the cabin air pressure monitoring procedure should be re-evaluated; and the degree of equipment power down specified for this analysis and no problems were noted.

Steines, G.↗