Search NASA⌕ Search

SEARCH · Search NASA

Results for “UNDERGROUND STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Preliminary design of a helium cryogenic system for SAND detector at LBNF-DUNE near site

The Long-Baseline Neutrino Facility (LBNF) is providing a helium cryogenic system to support the superconducting solenoid magnet of the System for on-Axis Neutrino Detection (SAND) for the Deep Underground Neutrino Experiment (DUNE) Near Site at Fermilab in Batavia, IL. The design started in 2020 and construction is set to begin in the mid 2020‘s.The helium cryogenic system primarily consists of a helium refrigerator system, distribution valve boxes, vacuum-jacketed helium and nitrogen transfer lines, warm gaseous helium transfer system, instruments and control system, and gaseous helium storage tanks. It is designed to provide supercritical helium at around 3 bara and 5 K with expansion from 3 to 1.2 bara in the SAND cryostat and 70K forced cold gas helium to cool the thermal shields of the SAND cryostat. The SAND superconductive magnet is indirectly cooled through a liquid helium thermosiphon cycle. A pair of 3 kA leads is cooled by the gas helium vaporized from the liquid helium reservoir in the cryostat turret. The helium system will share the liquid nitrogen tank and liquid nitrogen phase separator with the Near Site Liquid Argon system. The helium recycle compressor system, GHe tanks and LN2 tank will be located on the Surface. The cryogenic facilities including refrigerator cold box, valve boxes and LN2 phase separator will be located on the shaft cryo-mezzanine in the underground cavern. The shaft connecting surface and cavern is more than 60 meter deep. The helium vacuum-jacketed transfer line between the cold box and the SAND magnet is more than 50 meter long. This paper presents the preliminary design of the helium cryogenic system including the design scheme, process flow diagram, heat load estimates, layout plan and so on.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Simulation of Multiphase Flow and Poromechanical Effects Around Injection Wells in CO 2 Storage Sites

In geological CO 2 storage operations, wellbore deformations and leakage pathways formations can occur around injection and abandoned wells subjected to high rates and long-term CO 2 injection. To guide engineering design and prevent CO 2 leakage risks, a full understanding of the underlying physics and robust numerical models is necessary to evaluate the response of underground formations in the near wellbore region and in the reservoir. In this study, a multi-scale and multi-physics open-source simulator (GEOS) is used to simulate multiphase flow and poromechanical deformations over time in three dimensions. The governing equations for mechanical deformations of the rock body and multiphase compositional fluid flow within the rock matrix are solved with a fully coupled finite element and finite volume approach. The Drucker–Prager model with friction hardening is applied to simulate elastoplastic deformation and a multiphase fluid model with power-law correlations for relative permeability is used to model the migration of CO 2 plume, which are coupled with numerical implicit scheme. Simulation results are verified against multiple analytical solutions for multiphase flow and wellbore problems, thus demonstrating the accuracy of this advanced simulator. In two engineering applications, here we highlight the impact of elastoplastic deformation and coupled modeling for assessing induced displacements and stress perturbations, which are more pronounced in the near wellbore regions. This work focuses on short-term processes in the vicinity of injection wells where stress evolutions, rock deformations and multiphase compositional flow and transport are simulated jointly to ensure wellbore stability and prevent damage. This fully coupled geomechanical model can simulate multiphase flow and any associated poromechanical effects within the CO 2 storage site and in the surrounding formations. Such a large-scale, long-term, multi-physics simulation model is useful in many ways: it can guide operational decisions for CO 2 injection, assess the containment potential and risks of a site, and analyze the wellbore stability and integrity during and after CO 2 injection.

58 GEOSCIENCES↗

DUNE Data Management: Network Visualization Monitoring Software

Fermilab’s fagship Deep Underground Neutrino Experiment (DUNE) seeks to better understand the nature of neutrinos within the context of Leptogenesis, neutrino oscillations, multi-messenger Astronomy, and other scientifc phenomena. The experiment will send a beam of neutrinos from the Fermilab site in Illinois to the Sanford Underground Neutrino Facility (SURF) in South Dakota, generating petabytes of scientifc data. Given the high volume of data expected when measurements begin at the end of the decade, DUNE computing and the data management group must carefully monitor data transfers across the 15 remote storage sites and, more generally, the 36 global DUNE computing sites. This report will describe both the frontend and backend data monitoring software designed to analyze and visualize these data transfers. Specifc emphasis will be placed on the software’s setup, usage, and methods for future implementations. The full software code can be found under the DUNE/data-mgmt-testing GitHub repository.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Stimuli-responsive petroleum cement composite with giant expansion and enhanced mechanical properties

Shrinkage, as an inherent property of cement during the curing process, has been a concern in the oil & gas industry for centuries. Therefore, expansive cement has been studied for many decades, primarily through incorporation of expansive additives. Nevertheless, traditional expansive additives are not able to achieve the required expansive ratio or maintain a good mechanical property for the cement composite at extreme underground condition. Accordingly, a new generation of expansive additive, which not only has the required expansion, but also work at the downhole high temperature and high pressure environment, and maintain or even enhance the mechanical property, is highly desired. In this work, a high enthalpy storage shape memory polymer (SMP) as a new class of expansive additive is investigated. It is found that the cement composite achieves 1.4% circumferential expansion by only 6% by weight of SMP additives. The compressive strength and flexural strength are also enhanced at the same time, which is hardly achievable by other expansive additives with the same concertation. Good pumpability is also proved by rheological study. The mechanism controlling the enhanced properties is reveled through morphological study and element mapping analysis at the SMP/cement interface.

36 MATERIALS SCIENCE↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S (Phase III) (Final Progress Report)

“Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (Project ECO 2 S)” is an early mover project within the U.S. Department of Energy (DOE) and National Energy Technology Laboratory’s Carbon Storage Assurance Facility Enterprise, or CarbonSAFE, initiative. Phase III of Project ECO2S advanced the foundational work of Phase II, which confirmed the potential for safely, permanently, and economically storing commercial volumes of carbon dioxide (CO 2 ) in the regionally significant saline reservoir system near Mississippi Power Company’s (MPC) Kemper County Energy Facility. The primary objective of Phase III was to complete detailed site characterization necessary to obtain an Underground Injection Control (UIC) Class VI Permit to Construct from the U.S. Environmental Protection Agency. This involved transitioning from regional geologic assessments to high-resolution site-specific analyses.

03 NATURAL GAS↗

Advanced Computational Modeling of High-Level Waste Vitrification at the Hanford Site

The U.S. Department of Energy (DOE) has selected vitrification for stabilizing legacy tank waste at the Hanford site, where radioactive waste from plutonium production was historically stored in underground tanks. This waste will be separated into low-activity waste (LAW) and high-level waste (HLW) fractions and processed at the Waste Treatment and Immobilization Plant (WTP). At WTP, glass melters are used for the vitrification of radioactive tank waste, transforming it into a stable borosilicate glass form for safe long-term storage. The melter vessel is constructed from highly durable and heat-resistant materials, where the vitrification process occurs. The main regions that are modeled are the melt pool, plenum, cold cap, riser/discharge chamber, and surrounding structure with insulation layers. Forced convection induced by air bubblers at the base of the melter ensure uniform temperature distribution and provide heat to the cold cap layer. The cold cap is a region of reacting batch feed that floats on top of the molten glass and is where the batch-to-glass reactions occur. Joule heating provided by electrodes mounted along the vertical walls of the melter and immersed directly in the glass, generates the necessary heat for the net endothermic conversion processes that occur in the cold cap. The high temperatures, radioactivity, and opaque nature of the glass prevent direct observation inside the melters. Therefore, computational models are essential for providing insight into factors that affect melter throughput. Thermocouples in the plenum provide operators with plenum temperature measurements. Operational adjustments include bubbling rate, voltage supplied to the electrodes, feed adjustments, and glass removal rate. Different computational fluid dynamics (CFD) models have been developed, each serving a specific purpose. There are CFD models of different scale melters, as well as models that capture the two-phase flow interfaces of rising bubbles in the molten glass or models with a simplified molten glass region so that the surrounding structure and plenum can be feasibly incorporated. Pilot-scale melter models have been developed to serve as validation of the methods employed in the simulation of the full-scale WTP melters. Models incorporating resolved bubbling are used to develop momentum source terms to implement into a single phase, multi-region, steady-state flow model that is being validated by measured process parameters such as glass production rate, voltage, input power, plenum temperatures, etc. The resolved bubbling model uses the multiphase volume of fluid approach to model the system with a high-resolution interface capturing scheme to maintain sharp interfaces between the molten glass and the air phase. The suite of CFD models is continually being improved to incorporate more realistic physics and achieve faster turnaround time. For example, an incremental controller is implemented to automatically adjust electrode voltage within the simulation to a molten glass set point temperature of 1150°C. Newer models feature improved meshes to ensure conformal meshes between regions and eliminate unnecessary mesh refinement in areas that are not of interest (such as boundary layers in offgas ports). Instead of explicitly modeling the structural, refractory, and insulation layers of the melter, a thermal resistance approach is used with published correlations used for boundary conditions. The development of robust and efficient CFD models will be instrumental in enabling the WTP to successfully fulfill its mission of safely stabilizing legacy nuclear waste.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

SANSMIC v.1.0

SAND2024-01036O The updated Sandia Solution Mining Code (SANSMIC) modeling software models the dissolution of underground salt cavern walls due to raw-water injection (leaching), assuming an oil blanket. A previous version of this software modeled the impacts of leaching at the Strategic Petroleum Reserve and has been used in research for several decades, but the source code was not available. The new version will enhance current research as additional subsurface storage of energy in solution-mined caverns increases. It will also allow research reproducibility by making the software available to the wider research community. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Hart, David↗

Porous Colloidal Nanoparticles as Injectable Multimodal Contrast Agents for Enhanced Geophysical Sensing

Injecting fluids into underground geologic structures is crucial for the development of long-term strategies for managing captured carbon and facilitating sustainable energy extraction operations. Here, we have previously reported that the injection of metal–organic frameworks (MOFs) into the subsurface can enhance seismic monitoring tools to track fluids and map complex structures, reduce risk, and verify containment in carbon storage reservoirs because of their absorption capacity of low-frequency seismic waves. Here, we demonstrate that water-based Cr/Zn/Zr MOF colloidal suspensions (nanofluids) are multimodal geophysical contrast agents that enhance near-wellbore logging tools. Based on experimental fluid-only measurements, MIL-101(Cr), ZIF-8, and UiO-66 nanofluids have distinct complex conductivity and/or low-field nuclear magnetic resonance (NMR) signatures that are relevant to field-deployed technologies, implying the potential to enhance near-wellbore monitoring of CO 2 injection and associated processes with downhole logging tools. Small- and wide-angle X-ray scattering characterization of ~0.5 wt % MIL-101(Cr) suspensions confirmed phase stability and provided insight into the fractal nature of colloidal nanoparticles. Finally, low-field (2 MHz) NMR measurements of MIL-101(Cr) nanofluid injection into a prototypical Berea sandstone demonstrate how paramagnetic high-surface area MOFs may dominate the relaxation times of hydrogen-bearing fluids in porous geologic matrices, enhancing the mapping of near-surface and near-wellbore transport pathways and advancing sustainable subsurface energy technologies.

NMR↗

Developing a Prototype Methodology to Rank CO2-EOR Wells and Assess Their Reuse Potential for Geologic Carbon Sequestration

This study presents a prototype methodology for evaluating the reuse potential of Class II CO₂-enhanced oil recovery (CO₂-EOR) wells as Class VI wells for geologic carbon sequestration. The approach focuses on assessing wellbore construction materials—casing, cement, tubing, and packers—based on U.S. Environmental Protection Agency (EPA) Class VI well conversion guidelines. Utilizing Python scripts and JSON representations, the methodology automates checks on digitized Texas Railroad Commission (TRRC) data to rank wells based on regulatory and integrity criteria. Key factors include casing integrity, cementing techniques, tubing compatibility, and packer selection. Due to limitations in digitized data, manual verification is required for certain sections. Future enhancements include incorporating non-digitized data via web scraping and machine learning. This research provides a practical framework for well owners and regulators, supporting informed decision-making for sustainable CO₂ storage.

carbon sequestration↗

An Architectural Survey of the U12G Tunnel Historic District, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), in conjunction with the National Nuclear Security Administration Nevada Field Office (NNSA/NFO), proposes to demolish six buildings and three storage areas located at the U12g Tunnel portal area in Area 12 of the Nevada National Security Site (NNSS). The buildings are 12-358 (Signal Vault); 12-201800 (Storage Quonset Hut); 12-202555 (Walker Shack); 12-868 (Pipe Assembly); 12-B100933 (Electrical Shop); 12-B100944 (Conference Room); and Storage Area 1; Storage Area 2; and Storage Area 3. The buildings and storage areas were selected for demolition as part of the DOE’s Real Property Efficiency Plan to reduce the footprint of unused and non-operational facilities on the NNSS. They are all vacant and have no proposed uses for current or upcoming NNSS missions. Demolition activities constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. Identification efforts began with resources proposed for demolition in federal Fiscal Year (FY) 23. Four buildings were proposed to be demolished in FY23 (12-358, 12-868, 12-201800, and 12-202555). These buildings and the U12g Tunnel Historic District (SHPO No. D444) were recorded in Identification, Evaluation, and Finding of Adverse Effect for the Proposed Demolition of Five Buildings in Area 12, Nevada National Security Site, Nye County, Nevada (Menocal et al. 2023). Identification efforts indicated three buildings (12-358, 12-201800, and 12-868) supported nuclear testing in the U12g Tunnel. The fourth building post-dated the use of U12g Tunnel for nuclear testing activities. The report recommended that three of the four buildings (12-358, 12-201800, 12-868) and the U12g Tunnel Historic District may be eligible for the National Register of Historic Places (NRHP). The report also found that the undertaking would have an adverse effect on the three buildings and on the historic district. The Nevada State Historic Preservation Office (SHPO) concurred with the report’s findings (Reed 2023). The U12g Tunnel was determined eligible as a historic district under the Secretary of the Interior’s (SOI) Significance Criterion A, at the local level, in the context of the Cold War as an underground testing environment for the development of nuclear weapons and to assess the effects of a nuclear explosion on materials and equipment with a period of significance from 1959 to 1971. It was also determined eligible under Significance Criterion C for embodying the distinctive characters of a horizontal tunnel complex used for nuclear testing and as a significant and distinguishable entity. The three buildings were determined to be contributing elements of the district. The undertaking was expanded with the addition of two buildings and three storage areas proposed to be demolished and located within U12g Tunnel Historic District in FY24. These five resources (12-B100933, 12-B100944, and Storage Areas 1, 2, and 3) were recorded in Supplemental Identification, Evaluation, and Finding of Effect for Additional Proposed Demolition at U12g Tunnel, Area 12, Nevada national Security Site, Nye County, Nevada (Brannan et al. 2024). Identification efforts indicated that the two buildings and Storage Area 1 supported nuclear testing in the U12g Tunnel. Storage Area 1 and Storage Area 2 post-dated the nuclear testing activities at U12g Tunnel and were not recommended as contributing elements to the district. The report also found that the undertaking would have an adverse effect on the newly identified buildings and one storage area and on the historic district. The SHPO concurred that the expanded undertaking would result in adverse effects to historic properties (Reed 2025). To resolve these adverse effects, NNSA/NFO, in consultation with the SHPO, is following standard mitigation as stipulated in the 2024 Programmatic Agreement DE-GM58-22NA25554 Among the U.S. Department of Energy and the Nevada State Historic Preservation Officer and the Advisory Council on Historic Preservation Concerning the Protection of Historic Properties on the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the NNSS PA). The standard mitigation measures are outlined in Appendix D of the NNSS PA. As such, this architectural survey has been prepared in accordance with Appendix D of the NNSS PA and follows the report format outlined in Appendix F. It includes a historic context that describes the district’s origin, history, and support functions, its significance in the context of nuclear testing on the NNSS, and identifies contributing and non-contributing elements within the district. The report is accompanied by Architectural Resource Assessment (ARA) forms for individual resources and a Historic District Resource Assessment (HDRA) for the U12g Tunnel Historic District. In total, this architectural report identified 32 primary resources within the district boundary. Six of the primary resources were previously identified as contributing elements. An additional 17 resources are recommended as contributing elements to the district for a total of 23 contributing elements. The other nine resources identified are recommended as non-contributing elements to the district.

12-201800↗

An HPC-Based Hydrothermal Finite Element Simulator for Modeling Underground Geothermal Behavior with Example Simulations on The Treasure Island and UC Berkeley Campus

This submission contains the source code of the Hydrothermal Finite Element Simulator used for the Treasure Island and UC Berkeley campus geothermal simulation. It contains a report that summarizes the development and validation of this Hydrothermal Finite Element Simulator, with a case study on Treasure Island site. It also contains a report that investigates the feasibility of upgrading the existing campus energy delivery system at UC Berkeley to a fifth-generation district heating and cooling system that includes geothermal heat/cold storage.

15 GEOTHERMAL ENERGY↗

CO 2 Transport Infrastructure Outlook in the United States

Carbon capture and storage (CCS) represents one of the most important methods to mitigate anthropogenic carbon emissions at a large scale, playing a key role in meeting climate change targets (Bui et al., 2018) and for net-zero CO 2 by 2050 scenarios in the United States (Browning et al., 2023). This technology involves capturing CO 2 emissions from industrial processes, transporting them via pipelines, trucks, rails, or ships, and ultimately storing them in underground geological sites, such as saline aquifers or depleted oil reservoirs. Thus, to encourage carbon reduction initiatives, the U.S. Congress enacted the Bipartisan Budget Act in 2018, reforming the 45Q tax credit to benefit operators storing CO 2 in geologic formations (Jones and Sherlock, 2021). Additionally, the 2022 Inflation Reduction Act further expanded these incentives, providing additional support for CCS initiatives (Hackett and Kuehn, 2023). Although numerous studies describe the importance of optimal CO 2 transportation to support the decision-making of CCS projects aligned with the objective of net-zero emissions by 2050 (Abramson and Christensen, 2021; Chen and Pawar, 2023; Greig and Pascale, 2021), further efforts are required to optimize the transport infrastructure for national-scale CCS deployment. Therefore, in this study, we examine three nationwide scenarios with the SimCCS 3.0 tool (Ma et al., 2022, 2023, 2024) along with a novel geospatial splitting approach developed by Velasco-Lozano et al. (Velasco- Lozano et al., 2024a, 2024b). We present optimized pipeline networks that meet the dynamic evolution of annual capture amounts, describing the required total pipeline lengths at each stage as a function of the pipeline diameters. Thus, the cases presented demonstrate the feasibility of CO 2 pipeline infrastructure for large-scale CCS projects.

54 ENVIRONMENTAL SCIENCES↗

Technology Strategy Assessment: Findings from Storage Innovations 2030 Bidirectional Hydrogen Storage

Hydrogen is the most common element in the universe, comprising nearly 75% of all normal matter, and it has been used by scientists for centuries, but it was not fully recognized as an element until 1766, when it was isolated by Henry Cavendish. Early work focused on the generation of hydrogen through the oxidation of metals in water, which released hydrogen gas. Hydrogen’s lighter-than-air and flammable properties were immediately used in engines, zeppelins, and as feedstock for a wide variety of chemical reactions. Several approaches were developed for the production of hydrogen with the most common being associated with the production and conversion of hydrocarbon-based fuels. Coal gasification, steam methane reforming, and other reformation processes provide the majority of current hydrogen production due to the relatively low cost of hydrogen produced through these processes. More than 95% of hydrogen production is used for industrial processes rather than energy storage. To facilitate affordable decarbonization of these industrial processes and to advance the use of hydrogen as a fuel in transportation, DOE launched the Hydrogen Shot as part of the Energy Earthshots Initiative. The goal of the Hydrogen Shot is to reduce the cost of clean hydrogen by 80% to $1/kg of clean hydrogen production within one decade (known as the “1 1 1” goal). This is distinct from the Long-Duration Storage Shot, which is the primary focus of this report; however, it is intrinsically linked to bidirectional hydrogen storage. Several important chemical synthesis processes are dependent upon hydrogen, and the production and use of hydrogen is generally driven by its connection to one of these markets. For example, ammonia is one of the most highly produced chemicals in the world and it depends chiefly on hydrogen. Ammonia is primarily used for agricultural fertilizer and is considered to be largely responsible for a doubling of agricultural production per unit of land over the last century. Another one of hydrogen’s primary uses is as a catalyst in petroleum refining during the desulfurization process. Beyond chemical production, hydrogen is used as a reductant in the production of steel and has been demonstrated as a substitute for metallurgical coal in the production of raw iron. It is even used in the hydrogenation reaction for food products to create more shelf-stable semi-solid fats. However, while hydrogen is produced on the order of 100 million metric tons/year globally to feed these industries, more than 95% of hydrogen is produced from hydrocarbons that emit CO2 during the process. Conversely, electrolysis is a process by which electricity is used to separate hydrogen and oxygen in water molecules, usually across a membrane. Hydrogen production via electrolysis lowers the carbon intensity of produced hydrogen when coupled with low-carbon electricity. Currently, global electrolysis capacity is on the order of 1 GW, which equates to about 500 metric tons/day of hydrogen production. To support large-scale industrial decarbonization, capacity will likely need to increase by two to three orders of magnitude. Electrolysis technology is broadly separated into groups that are defined by the electrolyte used, with further subdivision based on the operating characteristics. The majority of commercial electrolyzer systems are based around three main technology groups: liquid alkaline, proton exchange membrane, and solid oxide. Liquid Alkaline (LA) electrolysis is the oldest, most mature, least expensive, and most common commercial technology, with 400 plants in operation by 1902. Its hydrogen output is low relative to the size of the system due to a low current density. LA electrolysis utilizes a liquid potassium hydroxide solution as the electrolyte. Proton exchange membrane (PEM) electrolysis (also known as polymer electrolyte membrane electrolysis), described in 1960, relies on an acid-impregnated polymer membrane as the electrolyte and typically offers three to six times higher hydrogen production per unit cell area than LA electrolysis. Solid oxide electrolysis, or high-temperature electrolysis, utilizes a ceramic cell as the electrolyte and operates on steam rather than liquid water, enabling electrical efficiencies of more than 90%, which is up from 60% with PEM. Two pre-commercial electrolyzer technologies to note are alkaline exchange membrane (AEM) and proton-conducting solid oxide electrolysis cell (SOEC). AEM potentially has the advantages of both LA and PEM technologies in that it is able to use low-cost materials like LA but with the ability to operate at higher output pressures with a smaller footprint like PEM. Proton-conducting SOEC is similar to commercial SOEC, which uses an oxide-conducting ceramic; however, it uses a proton-conducting ceramic that has the potential to operate at lower temperatures and has lower capital costs. Each of these technologies is experiencing a rapid improvement in performance and a reduction in installed cost, and each appears to be well suited to specific applications. Besides differences in the type of electrolyzer used, the main difference in the architecture of bidirectional hydrogen systems is how the hydrogen is stored. Currently, the most cost-effective way to store large amounts of hydrogen gas is underground, such as in large salt caverns that have been hollowed out. These salt caverns are geographically concentrated in small portions of the United States and are not generally near large metropolitan areas; however, other subsurface architectures are being investigated to expand this reach. A more widely deployable option is aboveground pressurized tanks. These systems are about 10 times as expensive because of the materials and safety margins required to hold hydrogen at high pressures. A third option is using materials-based storage, such as liquid organic hydrogen carriers. By reversibly attaching the produced hydrogen to other molecules, it can be stored at near atmospheric pressure and room temperature. This has the potential to reduce the material cost of storage but may result in a reduction in the efficiency of the process because there are both hydrogen uptake and release processes. While materials-based storage has not been used extensively for large-scale hydrogen storage in the past, there is currently significant activity regarding developing materials and processes for use in large-scale hydrogen storage applications. Electrolysis-produced hydrogen offers an unusual opportunity for energy storage applications. Unlike more conventional energy storage approaches, such as batteries, which operate entirely within electrical markets, hydrogen is a valuable product beyond the electric market and can be directed to the most lucrative use. Hydrogen also can be directly converted back to electricity using either a fuel cell or turbine, or it can be sold to other markets, such as chemical synthesis, steel production, or even export. In this way, excess electricity can be upgraded to the most valuable product. Finally, its use can be actively managed between multiple off-takers; for example, local hydrogen storage can provide a specific amount of stored electricity and any excess can be exported to ammonia production. This flexibility is amplified by the fact that hydrogen storage has fully decoupled power and energy components, which allows for affordable scaling options. Together, this allows a substantial amount of creativity to enable the economic utilization of variable power resources while supporting decarbonization of the industry.

08 HYDROGEN↗

Evaluation of cosmogenic production of 39 Ar and 42 Ar for rare-event physics using underground argon

Underground argon (UAr) with lower cosmogenic activities of 39 Ar and 42 Ar has been planned as a detector in detecting scintillation light and charge collection using time projection chambers for dark matter searches and as a veto detector in suppressing backgrounds for neutrinoless double beta decay (0$vββ$ ) experiments. Long-lived radioactive isotopes, 39 Ar and 42 Ar, can also be produced on the surface when UAr is pumped out from a deep well. Understanding the production of long-lived isotopes in Ar is important for utilizing UAr for dark matter and 0$vββ$ experiments in terms of its production, transportation, and storage. Ar exposure to cosmic rays at sea-level is simulated using Geant4 for a given cosmic ray muon, neutron, and proton energy spectrum. Here we report the simulated cosmogenic production rates of 39 Ar, 42 Ar, and other long-lived isotopes at sea-level from fast neutrons, high energy muons, and high energy protons. Total production rates of 938.53/kg Ar day and 5.81 × 10 -3 /kg Ar day for 39 Ar and 42 Ar are found from our simulation. Utilizing these production rates, we set a time limit of 954 days constrained by the production of 39 Ar for UAr to be on the surface before it compromises the sensitivity for a dark matter experiment. Similarly, a time limit of 1702 days constrained by the production of 42 Ar is found for a 0$vββ$ experiment.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

NETL Well Integrity Workshop: Identifying Well Integrity Research Needs for Subsurface Energy Infrastructure

Wells are a critical component of subsurface energy infrastructure. Ensuring the integrity of wells as engineered pathways for the safe extraction, injection, and storage of fluids in the subsurface is key to maximizing the effectiveness and resilience of that infrastructure. Addressing well integrity issues in a technically robust manner that promotes environmental sustainability and social equity is also an important focus of the United States (U.S.) Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management. Industry best practices, regulatory standards, modern monitoring data acquisition and control systems, and decades of research and development have dramatically improved the performance and reliability of wells for hydrocarbon extraction and underground injection in the oil and gas industry. Yet, important innovation is required to improve and ensure well integrity performance in engineered geologic systems where operational environments (fluid composition, temperature, pressure, and/or stress conditions) and long functional life cycles of well systems present unique challenges. Additionally, work is needed to understand and manage the long-term integrity and risks associated with legacy wells—especially those located adjacent to and presenting hazards for new subsurface activity.

02 PETROLEUM↗

LDRD 2022 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a report of its completed Laboratory Directed Research and Development Program (LDRD) projects to the Department of Energy (DOE) Office of Scientific and Technical Information in accordance with DOE Order 413.2C Chg1 (MinChg) dated August 2, 2018. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2022, in fulfillment of that requirement. In FY 2022, the BNL LDRD Program funded 70 projects, 30 of which were new starts, at a total cost of $17.2M. The investments that BNL makes in its LDRD program support the Laboratory’s strategic goals. BNL has identified seven scientific initiatives that define the Laboratory’s scientific future and that will enable it to realize its overall vision. This requires simultaneous excellence in all aspects of BNL’s work – from science and operations, to external partnerships with the local, state, and national communities, and beyond. This is enabled by safe, efficient, and secure operations; by an unwavering commitment to a diverse, equitable, and inclusive environment, including workforce development, both with staff and reaching out to the community; and by a strong focus on renewed infrastructure. The seven scientific initiatives are: 1) Nuclear Physics: uncover the structure of visible matter by constructing and operating the Electron-Ion Collider at BNL to maintain international leadership in nuclear physics for decades; 2) Clean Energy and Climate: support a net-zero U.S. economy through fundamental research in basic energy and climate sciences to revolutionize grid-scale storage, renewable integration, and the study of atmospheric processes with a new facility to improve climate predictability; 3) Quantum Information Science and Technology: discover new quantum materials to enhance quantum computers and develop an entanglement sharing quantum network as a prototype for the first quantum internet; 4) Discovery Science Driven by the Human-AI Facility Integration: revolutionize the operation of experiments across the sciences at user facilities and in core programs; 5) High Energy Physics: understand the origin of space and time with the ATLAS high luminosity upgrade at CERN and the future Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment; 6) Isotope Production: accelerate and expand isotope production to ensure the security of the Nation’s supply; 7) Accelerator Science and Technology: harness the cross-cutting accelerator science expertise at BNL to develop new facilities, improve and expand its user facilities, and promote the use of accelerators in industry. The funded projects support BNL’s seven scientific initiatives and priority programs as well as new areas of research and competencies at the Laboratory that are consistent with the Laboratory’s vision and mission. In total, these LDRD investments supported 43 postdoctoral researchers in whole or in part and resulted in 138 publications and 7 awards. This Program Activities Report represents the future of BNL science; it is an impressive body of exploratory work that investigates many scientific and technical directions in support of the DOE and BNL missions.

99 GENERAL AND MISCELLANEOUS↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

Understanding Line Losses and Transformer Losses in Rural Isolated Distribution Systems

Rural, isolated power systems in the mainland U.S. and in states like Alaska and Hawaii are powered by assets like diesel generators. These rural, isolated power systems also cannot operate at the higher band of medium voltage (like 69kV). They are primarily in the 12 to 14 kV range to keep the cost of the distribution investments lower. Because of this mid-band medium voltage range, the line losses and distribution transformers losses consume significant diesel consumption (almost 10 percent of the peak load). This work considers one such power system powering an isolated system and presents key findings online losses, and transformer losses. Understanding and documenting the impacts is critical for these communities operating their power systems and take actions to reduce expensive diesel consumption. In this paper, we will present one such typical grid and model it in electromagnetic transients (EMT) domain. We used the tower structure, under ground cabling installation to develop high fidelity models of lines. We also used high fidelity models of distribution transformers to present the no-load losses and full load loses. We will also present technical solutions available commercially off-the-shelf to reduce these losses and reduce diesel consumption. This work will be a primer for communities to understand the technical challenges and to understand the possible solution available to solve such challenges for rural, isolated power system operators.

blackstart↗