Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2021 along with an October 2021 direct push technology (DPT) investigation to confirm plume stability for the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

NASA Exploration Toilet On-orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

NASA Alternate Fecal Canister On-orbit Performance and Applicability to Exploration Missions

NASA developed a collapsible canister for the collection and containment of fecal deposits on long range exploration missions as well as on space stations where mass and volume are of great impact on spacecraft and propulsion designs. Developed as an alternative to the exploration toilet hard-sided canister, the container is a smaller volume for stowage in the unfilled state which allows better use of constrained volume on smaller vehicles for longer missions while still providing the important features of odor and solid/liquid contents containment when in the filled state. A reduction in mass was also achieved for the alternate fecal canister itself, although weight of the lid and contents are common to both the hard-side canister, and the alternate fecal canister. Details of the design, flight build and certification, and technology demonstration on ISS will be discussed. The discussion will include interface requirements and design solutions for use with the Universal Waste Management System (UWMS) as well as future extensibility for other toilet systems.

toilet↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118, PFAS Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from February 2022 through June 2022 at the Base Support Building (previously known as the Maintenance and Operation Building), Solid Waste Management Unit (SWMU) 014, and at the Kennedy Athletic, Recreation, and Social (KARS) Park II, (SWMU 118) located within Kennedy Space Center (KSC), Florida. SWMUs 014 and 118 were investigated independently, however, the results of the investigations indicated a single PFAS groundwater plume covering both SWMUs, so the two sites are being reported together.

PFAS↗

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

Fire Station #1 Area, SWMU 116 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report Kennedy Space Center, Florida

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Fire Station #1 (FS1) Area (formerly known as Fire Station #4) located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 116 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This PFAS SA is being managed under SWMU 116 as the fire station was identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. During the SA, a total of six soil, 48 groundwater direct push technology (DPT), eight groundwater monitoring well, and one surface water sample were collected between October 2021 and March 2022. The samples were analyzed for 28 PFAS compounds using the Department of Defense Quality Systems Manual-compliant Method. SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the FS1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSLs) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Overall, results from the SA showed exceedances of the applicable screening criteria for soil, groundwater and surface water. Considering the current and historical dataset, perfluorooctanesulfonic acid (PFOS) is the prevalent PFAS compound, which is indicative of AFFF releases. Based on results of the SA, additional groundwater DPT and surface water sampling should be considered, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between groundwater and surface water in the FS1 Area.

PFAS↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

Fire Station #2, Former Sewage Treatment Plant #17, and Towway Area-SWMU 114 PFAS Site Assessment Progress Report Kennedy Space Center, Florida

This PFAS Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from November 2021 through August 2022 at Solid Waste Management Unit (SWMU) 114 located within Kennedy Space Center (KSC), Florida. SWMU 114 includes area around Fire Station #2, Former Sewage Treatment Plant #17, the southern portion of the Shuttle Landing Facility Runway, Remote Launch Vehicle Hangar, and the Towway area. Fire Station #2 was constructed in 2008 and is currently active, housing fire station personnel and equipment, including aqueous film forming foam (AFFF). Releases of AFFF has occurred at SWMU 114. Previous environmental assessments have been performed at SWMU 114, including soil, groundwater, and surface water sampling for volatile organic compounds, polycyclic aromatic hydrocarbons, total petroleum hydrocarbons, and metals. No active remediation has been performed at the SWMU 114. PFAS site assessment field activities were conducted at SWMU 114 from November 2021 through August 2022. During the 2021-2022 Site Assessment, 124 direct-push samples were collected from 27 locations, 17 surface water samples were collected from 15 locations, 41 groundwater samples were collected from 37 newly installed monitoring wells, five concrete samples were collected from four locations, and one asphalt sample was collected. Additionally, two soil borings were advanced to 60 feet for lithologic descriptions, ten staff gauges were installed, and one round of water level measurements were collected from monitoring wells and staff gauges for groundwater flow determination. All groundwater and surface water samples were analyzed for 25 PFAS analytes by USEPA Method 537M. Concrete, and asphalt samples were analyzed by synthetic precipitation leaching procedure (SPLP) PFAS analysis by USEPA Modified Method 537M. Groundwater results were compared to the most recent Regional Screening Levels (RSLs) published by USEPA for residential tap water (USEPA, 2022a) to determine the extent of PFAS contamination at SWMU 114 for six PFAS analytes (PFOA, PFNA, PFBS, PFHxS, PFOS, and GenX). Surface water results were compared to the FDEP surface water screening levels (SW SLs) (FDEP, 2020) for PFOA and PFOS. The PFAS investigation concluded that groundwater exceeding RSLs extends east and south to Banana Creek and west to approximately the center of the SLF runway. The extent of PFAS is approximated to the north, to an area between Sharkey Road and Astronaut Road, where samples below the RSLs do not fully bound SWMU 114. At least two distinct PFAS source areas are located near Fire Station #2 and along Towway, at S114-MW0007S, within SWMU 114. Groundwater head measurements indicate that flow at SWMU 114 is generally similar across the shallow and intermediate water tables. A northeast to southwest trending groundwater divide is located near the middle of Towway where groundwater southeast of the divide flows to the south and groundwater northwest of the divide flows to the west. The groundwater divide generally separates the two areas of higher PFAS concentrations. Surface water samples indicated concentrations of PFOS above the SW SLs in surface water bodies across the site. Further assessment and sampling are required to better understand the interaction between groundwater and surface water at SWMU 114. Concrete and asphalt samples collected confirm that a significant release of AFFF occurred near the stormwater pond northwest of Fire Station #2. Additional concrete samples surrounding Fire Station #2 and at the northwest and southeast edges of the SLF tarmac indicate elevated PFOS concentrations. These results indicate that discharges of AFFF in these locations have infiltrated into asphalt and concrete and may act as a continuing source of PFAS to groundwater and surface water after rain events. Additional direct-push samples are required to delineate PFAS at SWMU 114. Samples may need to extend beyond the Former SLF Rescue Building and Morpheous Test Site to delineate PFAS in groundwater. Monitoring wells should be sampled and gauged quarterly to determine if seasonal impacts are observable, especially in shallow wells near surface water features. Furthermore, surface water samples should be collected from additional ditches to further define the extent of surface water impacts at SWMU 114 and extending along the SLF runway. Staff gauges should be gauged quarterly with groundwater gauging to determine surface water flow and interaction with groundwater. The PFAS sampling results and path forward for SWMU 114 were presented to the KSC Remediation Team in October 2022. Once the PFAS SAPR is approved, it will be submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler↗

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

Sewage Treatment Plant #1 Area, SWMU 117 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Sewage Treatment Plant #1 (STP1) Area located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 117 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program, as the sewage treatment plant and associated areas were identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. PFAS SA activities were conducted between April 2020 and March 2022 to collect additional data to supplement the existing datasets to better understand the extent of PFAS impacts to the environment in the STP1 Area. The SA for the STP1 Area covers an approximately 130-acre investigation area with multiple structures and buildings. The focus of the SA is the STP1 Complex and associated structures, including the former Polishing Pond, former Sludge Disposal8 Area, and former Spray Field. The STP1 Complex is located in the KSC Industrial Area, at the southwest corner of 4th Street SE and C Avenue SE. The STP1 Complex is located approximately ¼-mile south and downgradient of the Fire Station #1 site (SWMU 116), which is also currently undergoing a PFAS SA because of potential releases of PFAS-containing aqueous film-forming foam (AFFF). During the SA, a total of seven soil, 131 groundwater direct push technology (DPT), 24 groundwater monitoring well, and 11 surface water samples were collected between April 2020 and March 2022. Monitoring well samples were analyzed for 18 PFAS compounds, with all other samples analyzed for 28 PFAS compounds. The SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the STP1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSL) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Results from the SA showed exceedances of the applicable screening criteria for groundwater and surface water. Considering the current and historical dataset, PFOS is the prevalent PFAS compound. Based on these results, additional groundwater DPT and surface water sampling should be considered for PFAS analysis, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between the groundwater and surface water at the site. Collection of additional samples for TOC analysis should also be considered from representative groundwater (saturated soils) and surface water locations to further evaluate potential correlations between PFAS and TOC to provide a more comprehensive dataset to assist in fate and transport analyses.

Sewage Treatment Plant↗

In Situ Chemical Reduction Interim Measures Work Plan Hot Spot 3 Mobile Launcher Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This document presents the design details of an In Situ Chemical Reduction (ISCR) Interim Measures Work Plan for Hot Spot 3 within Mobile Launcher Platform Rehabilitation Sites/Vehicle Assembly Building Area, Solid Waste Management Unit (SWMU) 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The interim measures (IM) treatment zone encompasses an area identified as the High Concentration Plume (HCP), which is defined as the area with chlorinated volatile organic compound (CVOC) groundwater concentrations greater than their respective Natural Attenuation Default Concentration (NADC). The objective of the IM is to remove CVOC mass within the treatment area to levels that facilitate a transition to natural attenuation monitoring. The IM design consists of the selected ISCR amendment, Provect-IR, which is a mixture of solid reagents in a single product that promotes enhanced reductive dechlorination and ISCR. ProvectIR includes natural antimethanogenic compounds; multiple hydrophilic, nutrient-rich organic carbon sources; zero valent iron; chemical oxygen scavengers; and vitamin and mineral sources. The proposed treatment area for this IM encompasses less than 1 acre and includes three vertical treatment intervals to reach the NADC plumes that vary per CVOC and depth: 4 to 10 feet below land surface (bls), 10 to 18 feet bls, and 42 to 52 feet bls. The amendment will be distributed through 16 injection points (IP01 through IP16) using dosing rates ranging from 0.4% to 0.6% of soil mass within the treatment interval and a 15% or 20% slurry strength. Dosage rates and slurry strength are based on groundwater geochemistry, soil characteristics, and contaminant concentrations. To aid in the evaluation of the ISCR IM performance, six performance monitoring wells will be installed following injections and sampled semiannually. CVOC parameters will be sampled until concentrations reduce to below their NADC. Underground Injection Control parameters will be sampled until concentrations decrease to background levels or to levels that meet respective groundwater standards. Sampling frequency will be evaluated annually and modified as needed. The path forward for the ISCR IM implementation includes preparing the IM Implementation Work Plan, ISCR injections, monitoring well installation, performance monitoring, and reporting.

Randall K. Sillan↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Hypergol Maintenance Facility North SWMU 090 Year 2 Air Sparge System Performance Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from August 2021 to August 2022.

Christopher Hook↗

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

Launch Complex 39A, SWMU 008 and Launch Complex 39B, SWMU 009 Performance Monitoring Report Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents the findings, observations, and results for Air Sparging (AS) operations and sitewide groundwater monitoring for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, and Launch Complex 39B (LC39B), SWMU 009, at Kennedy Space Center (KSC), Florida. Results from direct push technology (DPT) sampling at LC39B are also included in this report. The reporting period for AS operations covered under this PMR is from January 1, 2022, to December 31, 2022.

groundwater↗

Contractors Road Heavy Equipment Area (SWMU 055) 2022 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from June through December 2022. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with sitewide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; - Semiannual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. HydroGeoLogic, Inc. (HGL) prepared this report for the National Aeronautics and Space NASA) under contract number 80KSC019F0096/80KSC019D0012, Technical Directive-03. An Advance Data Package (ADP) presentation of the elements of this report received Team (KSCRT) agreement at the April 5, 2023, KSCRT meeting. The chlorinated volatile organic compound plume appears to be stable vertically and horizontally. Additional DPT groundwater sampling will be completed to support a remedial alternatives evaluation for potential means to expedite groundwater cleanup. There are per- and polyfluorinated alkyl substances in site groundwater, and assessment is planned in the future. Sub-slab soil gas monitoring results do not indicate any concerns with indoor vapor intrusion. Based on the 2022 annual groundwater sampling results, it is recommended that annual sampling continue to alternate with the wet and dry season, with the next sampling event planned for December 2023.

groundwater↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

NASA Exploration Toilet Hardware Status and Crew Feedback from ISS Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗