Fabrication of Microshutter Arrays for James Webb Space Telescope

Two-dimensional MEMS microshutter arrays are being developed at NASA Goddard Space Flight Center for use in the near-infrared region on the Next Generation Space Telescope (NGST). The microshutter arrays are designed for the selective transmission of light with high efficiency and high contrast. The NGST environment requires cryogenic operation at 45K. Microshutter arrays are fabricated out of silicon-oxide-insulated (SOI) silicon wafers. Arrays are close-packed silicon nitride membranes with a pixel size of 100x100 microns. Individual shutters are patterned with a torsion flexure permitting shutters to open 90 degrees with a minimized mechanical stress concentration. The mechanical shutter arrays are fabricated using MEMS technologies. The processing includes a multi-layer metal deposition and patterning of shutter electrodes and magnetic pads, reactive ion etching (RE) of the front side to form shutters out of the nitride membrane, an anisotropic back-etch for wafer thinning, followed by a deep RIE (DRIE) back-etch down to the nitride shutter membrane to form frames and relieve shutters from the silicon substrate. An additional metal deposition and patterning is used to form back electrodes. Shutters are actuated using a magnetic force and latched using an electrostatic force.

Li, Mary J.↗

Integrated Modeling Activities for the James Webb Space Telescope (JWST): Structural-Thermal-Optical Analysis

This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal- optical, often referred to as "STOP", analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. The paper begins an overview of multi-disciplinary engineering analysis, or integrated modeling, which is a critical element of the JWST mission. The STOP analysis process is then described. This process consists of the following steps: thermal analysis, structural analysis, and optical analysis. Temperatures predicted using geometric and thermal math models are mapped to the structural finite element model in order to predict thermally-induced deformations. Motions and deformations at optical surfaces are input to optical models and optical performance is predicted using either an optical ray trace or WFE estimation techniques based on prior ray traces or first order optics. Following the discussion of the analysis process, results based on models representing the design at the time of the System Requirements Review. In addition to baseline performance predictions, sensitivity studies are performed to assess modeling uncertainties. Of particular interest is the sensitivity of optical performance to uncertainties in temperature predictions and variations in metal properties. The paper concludes with a discussion of modeling uncertainty as it pertains to STOP analysis.

Johnston, John D.↗

Optical Modeling Activities for the James Webb Space Telescope (JWST) Project: Determining Image Motion and Wavefront Error Over an Extended Field of View with a Segmented Optical System - II

This is part two of a series on the optical modeling activities for JWST. Starting with the linear optical model discussed in part one, we develop centroid and wavefront error sensitivities for the special case of a segmented optical system such as JWST, where the primary mirror consists of 18 individual segments. Our approach extends standard sensitivity matrix methods used for systems consisting of monolithic optics, where the image motion is approximated by averaging ray coordinates at the image and residual wavefront error is determined with global tip/tilt removed. We develop an exact formulation using the linear optical model, and extend it to cover multiple field points for performance prediction at each instrument aboard JWST. This optical model is then driven by thermal and dynamic structural perturbations in an integrated modeling environment. Results are presented.

Howard, Joseph M.↗

Integrated Modeling Activities for the James Webb Space Telescope: Structural-Thermal-Optical Analysis

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal-optical, often referred to as STOP, analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. Temperatures predicted using geometric and thermal math models are mapped to a structural finite element model in order to predict thermally induced deformations. Motions and deformations at optical surfaces are then input to optical models, and optical performance is predicted using either an optical ray trace or a linear optical analysis tool. In addition to baseline performance predictions, a process for performing sensitivity studies to assess modeling uncertainties is described.

Johnston, John D.↗

The Role of Integrated Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. System-level verification of critical optical performance requirements will rely on integrated modeling to a considerable degree. In turn, requirements for accuracy of the models are significant. The size of the lightweight observatory structure, coupled with the need to test at cryogenic temperatures, effectively precludes validation of the models and verification of optical performance with a single test in 1-g. Rather, a complex series of steps are planned by which the components of the end-to-end models are validated at various levels of subassembly, and the ultimate verification of optical performance is by analysis using the assembled models. This paper describes the critical optical performance requirements driving the integrated modeling activity, shows how the error budget is used to allocate and track contributions to total performance, and presents examples of integrated modeling methods and results that support the preliminary observatory design. Finally, the concepts for model validation and the role of integrated modeling in the ultimate verification of observatory are described.

Mosier, Gary E.↗

James Webb Space Telescope - L2 Communications for Science Data Processing

JWST is the first NASA mission at the second Lagrange point (L2) to identify the need for data rates higher than 10 megabits per second (Mbps). JWST will produce approximately 235 Gigabits of science data every day that will be downlinked to the Deep Space Network (DSN). To get the data rates desired required moving away from X-band frequencies to Ka-band frequencies. To accomplish this transition, the DSN is upgrading its infrastructure. This new range of frequencies are becoming the new standard for high data rate science missions at L2. With the new frequency range, the issues of alternatives antenna deployment, off nominal scenarios, NASA implementation of the Ka-band 26 GHz, and navigation requirements will be discussed in this paper. JWST is also using Consultative Committee for Space Data Systems (CCSDS) standard process for reliable file transfer using CCSDS File Delivery Protocol (CFDP). For JWST the use of the CFDP protocol provides level zero processing at the DSN site. This paper will address NASA implementations of Ground Stations in support of Ka-band 26 GHz and lesson learned from implementing a file base (CFDP) protocol operational system.

Johns, Alan↗

James Webb Space Telescope: Frequently Asked Questions for Scientists and Engineers

JWST will be tested incrementally during its construction, starting with individual mirrors and instruments (including cameras and spectrometers) and building up to the full observatory. JWST's mirrors and the telescope structure are first each tested individually, including optical testing of the mirrors and alignment testing of the structure inside a cold thermal-vacuum chamber. The mirrors are then installed on the telescope structure in a clean room at Goddard Space Flight Center (GSFC). In parallel to the telescope assembly and alignment, the instruments are being built and tested, again first individually, and then as part of an integrated instrument assembly. The integrated instrument assembly will be tested in a thermal-vacuum chamber at GSFC using an optical simulator of the telescope. This testing makes sure the instruments are properly aligned relative to each other and also provides an independent check of the individual tests. After both the telescope and the integrated instrument module are successfully assembled, the integrated instrument module will be installed onto the telescope, and the combined system will be sent to Johnson Space Flight Center (JSC) where it will be optically tested in one of the JSC chambers. The process includes testing the 18 primary mirror segments acting as a single primary mirror, and testing the end-to-end system. The final system test will assure that the combined telescope and instruments are focused and aligned properly, and that the alignment, once in space, will be within the range of the actively controlled optics. In general, the individual optical tests of instruments and mirrors are the most accurate. The final system tests provide a cost-effective check that no major problem has occurred during assembly. In addition, independent optical checks of earlier tests will be made as the full system is assembled, providing confidence that there are no major problems.

Gardner, Jonathan P.↗

An Update on the Role of Systems Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2014. System-level verification of critical performance requirements will rely on integrated observatory models that predict the wavefront error accurately enough to verify that allocated top-level wavefront error of 150 nm root-mean-squared (rms) through to the wave-front sensor focal plane is met. The assembled models themselves are complex and require the insight of technical experts to assess their ability to meet their objectives. This paper describes the systems engineering and modeling approach used on the JWST through the detailed design phase.

Muheim, Danniella↗

Systems Engineering on the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2014. System-level verification of critical performance requirements will rely on integrated observatory models that predict the wavefront error accurately enough to verify that allocated top-level wavefront error of 150 nm root-mean-squared (rms) through to the wave-front sensor focal plane is met. This paper describes the systems engineering approach used on the JWST through the detailed design phase.

Menzel, Michael T.↗

James Webb Space Telescope Project Overview and Status for the SPIE

Often described as the successor to the Hubble Space Telescope, the JWST will serve astronomers world-wide in much the same way: Science & mission operations managed by the Space Telescope Science Institute The science investigations performed by the JWST will be determined by the General Observer community. Observing time allocated through annual peer-reviewed proposal cycles Four science themes have been defined by a succession of international community working groups to guide engineering development of the JWST: a) Identify the first bright objects that formed in the early Universe, and follow the ionization history. b) Determine how galaxies and dark matter, including gas, stars, metals, overall morphology and active nuclei evolved to the present day. c) Observe the birth and early development of stars and the formation of planets. d) Study the physical and chemical properties of solar systems (including our own) and where the building blocks of life may be present.

Sabelhaus, Phillip A.↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗