Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerator operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Accelerator/Experiment Operations - FY 2010

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2010. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2010 Run II at the Tevatron Collider, the MINOS and MINER?A experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

43 PARTICLE ACCELERATORS↗

Residual Resistance Data from Cavity Production Projects at Jefferson Lab

A fundamental limitation towards achieving high quality factors in superconducting radio-frequency cavities is the so-called residual resistance. Understanding and controlling the residual resistance has important implications towards improving the efficiency and reduce the operating cost of continuous wave superconducting linear accelerators. In this contribution we will report on the residual resistance values obtained from measurements of the quality factor of a large set of cavities, with resonant frequency between 805 MHz and 1.5 GHz, all of them processed and tested at Jefferson Lab. Surface treatments included both buffered chemical polishing and electropolishing. The results indicate an approximate value of the residual resistance of about 7-10 n Omega.

43 PARTICLE ACCELERATORS↗

Accelerator driven sub-critical core

Systems and methods for operating an accelerator driven sub-critical core. In one embodiment, a fission power generator includes a sub-critical core and a plurality of proton beam generators. Each of the proton beam generators is configured to concurrently provide a proton beam into a different area of the sub-critical core. Each proton beam scatters neutrons within the sub-critical core. The plurality of proton beam generators provides aggregate power to the sub-critical core, via the proton beams, to scatter neutrons sufficient to initiate fission in the sub-critical core.

43 PARTICLE ACCELERATORS↗

The Machine Protection System for the Fermilab Accelerator Science and Technology Facility

The Machine Protection System (MPS) for the Fermilab Accelerator Science and Technology Facility (FAST) has been implemented and tested. The system receives signals from several subsystems and devices which conveys the relevant status needed to the safely operate the accelerator. Logic decisions are made based on these inputs and some predefined user settings which in turn controls the gate signal to the laser of the photo injector. The inputs of the system have a wide variety of signal types, encoding methods and urgencies for which the system is designed to accommodate. The MPS receives fast shutdown (FSD) signals generated by the beam loss system and inhibits the beam or reduces the beam intensity within a macropulse when the beam losses at several places along the accelerator beam line are higher than acceptable values. TTL or relay contact signals from the vacuum system, toroids, magnet systems etc., are chosen with polarities that ensure safe operation of the accelerator from unintended events such as cable disconnection in the harsh industrial environment of the experimental hall. A RS422 serial communication scheme is used to interface the operation permit generator module and a large number of movable devices each reporting multi-bit status. The system also supports operations at user defined lower beam levels for system conunissioning. The machine protection system is implemented with two commercially available off-the-shelf VMEbus based modules with on board FPGA devices. The system is monitored and controlled via the VMEbus by a single board CPU

Wu, Jinyuan↗

Development of high current Bi and Au beams for the synchrotron operation at the GSI accelerator facility

In this work, the latest results of developing high current ion beams of Au and Bi at GSI facility are described. The difficulties in the production of required charge state in vacuum arc discharge ion sources using the pure materials in the cathodes are discussed. As a possible solution, admix of a small amount of more refractory metal to the cathode material is considered. As a significant result, a dramatic improvement in the production of high charge state Bi ions using the mixed Bi-Cu cathodes (with 8%-15% of Cu admixed) compared to pure Bi cathodes is presented. The preliminary results of investigation of the material structure of Bi-Cu cathodes are discussed. As a next step, it is planned to test the composition of Au with Pd, Zr, and Fe as cathode materials.

43 PARTICLE ACCELERATORS↗

First demonstration of a cryocooler conduction cooled superconducting radiofrequency cavity operating at practical cw accelerating gradients

Abstract We demonstrate practical accelerating gradients on a superconducting radiofrequency (SRF) accelerator cavity with cryocooler conduction cooling, a cooling technique that does not involve the complexities of the conventional liquid helium bath. A design is first presented that enables conduction cooling an elliptical-cell SRF cavity. Implementing this design, a single cell 650 MHz Nb 3 Sn cavity coupled using high purity aluminum thermal links to a 4 K pulse tube cryocooler generated accelerating gradients up to 6.6 MV m −1 at 100% duty cycle. The experiments were carried out with the cavity-cryocooler assembly in a simple vacuum vessel, completely free of circulating liquid cryogens. We anticipate that this cryocooling technique will make the SRF technology accessible to interested accelerator researchers who lack access to full-stack helium cryogenic systems. Furthermore, the technique can lead to SRF based compact sources of high average power electron beams for environmental protection and industrial applications. A concept of such an SRF compact accelerator is presented.

43 PARTICLE ACCELERATORS↗

The conversion of CESR to operate as the Test Accelerator, CesrTA. Part 3: Electron cloud diagnostics

Cornell's electron/positron storage ring (CESR) was modified over a series of accelerator shutdowns beginning in May 2008, which substantially improves its capability for research and development for particle accelerators. CESR's energy span from 1.8 to 5.6 GeV with both electrons and positrons makes it ideal for the study of a wide spectrum of accelerator physics issues and instrumentation related to present light sources and future lepton damping rings. Additionally a number of these are also relevant for the beam physics of proton accelerators. This paper is the third in a series of four describing the conversion of CESR to the test accelerator, CESRTA. The first two papers discuss the overall plan for the conversion of the storage ring to an instrument capable of studying advanced accelerator physics issues [1] and the details of the vacuum system upgrades [2]. This paper focuses on the necessary development of new instrumentation, situated in four dedicated experimental regions, capable of studying such phenomena as electron clouds (ECs) and methods to mitigate EC effects. The fourth paper in this series describes the vacuum system modifications of the superconducting wigglers to accommodate the diagnostic instrumentation for the study of EC behavior within wigglers. Lastly, while the initial studies of CESRTA focused on questions related to the International Linear Collider damping ring design, CESRTA is a very versatile storage ring, capable of studying a wide range of accelerator physics and instrumentation questions.

43 PARTICLE ACCELERATORS↗

Results of the first implementation of RF phase signature matching at LANSCE

The LINAC at the Los Alamos Neutron Science Center (LANSCE) has been utilizing the Delta-t method to match the RF cavities to the design acceleration parameters since its commissioning in 1972. The differences in time-of-flight between two subsequent Beam Position and Phase Monitors (BPPMs) are measured with both accelerated and drifting beams, depending on the whether the module is set to on or off. The algorithm optimizes the module amplitude and phase via iterative measurements if the initial phase is in the vicinity of the design value. With an upgrade to a faster readout system, a scan over the whole RF cavity phase range requires relatively less time than the classical optimization procedure. The Phase Scan Signature Matching (PSSM) method provides a time-efficient method that ensures the phase selection lands on the bunching side and empowers future analyses to build module-specific models. The PSSM also utilizes a direct model to determine the correct amplitude to sub-percent level instead of using linearized matrices. Furthermore, lacking a reliable energy measurement method in the LINAC, we measure the beam phases at two downstream locations to increase the precision of energy measurements. In this letter, we also discuss the sensitivities of PSSM, error propagation, and the implementation results for the 2019 and 2020 beam cycles.

47 OTHER INSTRUMENTATION↗

Using an Emittance Exchanger as a Bunch Compressor

An Emittance EXchanger (EEX), like a chicane, can be used for bunch compression. However, it offers a unique characteristic: the R56 term in an EEX vanishes, which decouples the final longitudinal position from the particles' energies, thereby suppressing the microbunch instability and providing a great deal of flexibility in tailoring the final particle longitudinal phase space

Accelerator Design, Technology, and Operations↗

Accelerator Reactor Coupling for Energy Production in Advanced Nuclear Fuel Cycles

This article is a review of several accelerator–reactor interface issues and nuclear fuel cycle applications of acceleratordriven subcritical systems. The systems considered here have the primary goal of energy production, but that goal is accomplished via a specific application in various proposed nuclear fuel cycles, such as breed-and-burn of fertile material or burning of transuranic material. Several basic principles are reviewed, starting from the proton beam window including the target, blanket, reactor core, and up to the fuel cycle. We focus on issues of interest, such as the impact of the energy required to run the accelerator and associated systems on the potential electricity delivered to the grid. Accelerator-driven systems feature many of the constraints and issues associated with critical reactors, with the added challenges of subcritical operation and coupling to an accelerator. Reliable accelerator operation and avoidance of beam trips are critically important. One interesting challenge is measurement of blanket subcriticality level during operation. We also review the potential benefits of accelerator-driven systems in various nuclear fuel cycle applications. Ultimately, accelerator-driven subcritical systems with the goal of transmutation of transuranic material have lower 100,000-year radioactivity than a critical fast reactor with recycling of uranium and plutonium.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

LANL Activities Supporting Electron Accelerator Production of 99 Mo for NorthStar Medical Radioisotopes, LLC

Summary of LANL FY12 Activities are: (1) Preparation, performance, and data analysis for the FY12 accelerator tests at ANL - (a) LANL designed and installed a closed-loop helium target cooling system at ANL for the FY12 accelerator tests, (b) Thermal test was performed on March 27, (c) 24 h production test to follow the accelerator upgrade at ANL; (2) Local target shielding design and OTR/IR recommendations - (a) Target dose rate and activation products were calculated with MCNPX, (b) 206 Pb(γ,2n) 204m Pb vs 204g Pb branching ratio unpublished, will measure using the LANL microtron, (c) OTR system nearing final configuration, (d) IR prototype system demonstrated during the recent thermal test at ANL; (3) Target housing lifetime estimation - Target housing material specifications and design to be finalized following the thermal test, lifetime not believed to be an issue; and (4) Target cooling system reliability - Long duration system characterizations will begin following the thermal test.

42 ENGINEERING↗

Solar Agile Delivery of Electrical Power Technology (Solar ADEPT) (2nd Quarterly) [Slides]

This talk is for the ARPA-E funded program that Los Alamos is part of a team with Carnegie Mellon University, Magnetics div. of Spang, and the University of Pittsburgh. Most of the material presented in this talk has been presented before and is associated with accelerators and has a 'DUSA' 'ATDO' designator. Slight variations in circuit topology as presented here are somewhat novel and although not classified should be considered Los Alamos proprietary. The viewgraphs from 'both' talks will be presented to team members and the ARPA-E sponsor.

14 SOLAR ENERGY↗

Production Facility System Reliability Analysis Report

This document describes the reliability, maintainability, and availability (RMA) modeling of the Los Alamos National Laboratory (LANL) design for the Closed Loop Helium Cooling System (CLHCS) planned for the NorthStar accelerator-based 99 Mo production facility. The current analysis incorporates a conceptual helium recovery system, beam diagnostics, and prototype control system into the reliability analysis. The results from the 1000 hr blower test are addressed.

Accelerator Design, Technology, and Operations↗