Search NASA⌕ Search

SEARCH · Search NASA

Results for “arc tracking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Early results from the TOPEX/POSEIDON GPS precise orbit determination demonstration

TOPEX/POSEIDON, a US/French oceanographic mission launched in August 1992, is the first earth satellite to carry a multi-channel, dual frequency Global Positioning System (GPS) receiver capable of making high precision P-code pseudorange and carrier phase measurements. The receiver was placed on TOPEX/POSEIDON as an experiment to demonstrate the potential of differential GPS tracking for subdecimeter orbit determination. In addition to the receiver, TOPEX/POSEIDON carries two flight-proven tracking systems to provide the operational precise orbit determination needed to meet the mission scientific requirements. These include a French-built one-way Doppler system known as DORIS (Doppler Orbitography and Radiopositioning Integrated by Satellite) and a circular ring of laser retroreflectors. Here we evaluate the quality of the GPS-determined orbits by examining post-fit residuals, orbit comparisons with DORIS, and orbit repeatability on overlapping data arcs. Overlapping data arcs with 6 hrs of common data out of a 30-hr arc have an average root-mean-square (RMS) altitude difference of 3.0 cm for 9 arcs. The average RMS altitude difference about the mean with a DORIS orbit was 5.7 cm.

Bertiger, Willy↗

Results From Mars Show Electrostatic Charging of the Mars Pathfinder Sojourner Rover

Indirect evidence (dust accumulation) has been obtained indicating that the Mars Pathfinder rover, Sojourner, experienced electrostatic charging on Mars. Lander camera images of the Sojourner rover provide distinctive evidence of dust accumulation on rover wheels during traverses, turns, and crabbing maneuvers. The sol 22 (22nd Martian "day" after Pathfinder landed) end-of-day image clearly shows fine red dust concentrated around the wheel edges with additional accumulation in the wheel hubs. A sol 41 image of the rover near the rock "Wedge" (see the next image) shows a more uniform coating of dust on the wheel drive surfaces with accumulation in the hubs similar to that in the previous image. In the sol 41 image, note particularly the loss of black-white contrast on the Wheel Abrasion Experiment strips (center wheel). This loss of contrast was also seen when dust accumulated on test wheels in the laboratory. We believe that this accumulation occurred because the Martian surface dust consists of clay-sized particles, similar to those detected by Viking, which have become electrically charged. By adhering to the wheels, the charged dust carries a net nonzero charge to the rover, raising its electrical potential relative to its surroundings. Similar charging behavior was routinely observed in an experimental facility at the NASA Lewis Research Center, where a Sojourner wheel was driven in a simulated Martian surface environment. There, as the wheel moved and accumulated dust (see the following image), electrical potentials in excess of 100 V (relative to the chamber ground) were detected by a capacitively coupled electrostatic probe located 4 mm from the wheel surface. The measured wheel capacitance was approximately 80 picofarads (pF), and the calculated charge, 8 x 10(exp -9) coulombs (C). Voltage differences of 100 V and greater are believed sufficient to produce Paschen electrical discharge in the Martian atmosphere. With an accumulated net charge of 8 x 10(exp -9) C, and average arc time of 1 msec, arcs can also occur with estimated arc currents approaching 10 milliamperes (mA). Discharges of this magnitude could interfere with the operation of sensitive electrical or electronic elements and logic circuits. Sojourner rover wheel tested in laboratory before launch to Mars. Before launch, we believed that the dust would become triboelectrically charged as it was moved about and compacted by the rover wheels. In all cases observed in the laboratory, the test wheel charged positively, and the wheel tracks charged negatively. Dust samples removed from the laboratory wheel averaged a few ones to tens of micrometers in size (clay size). Coarser grains were left behind in the wheel track. On Mars, grain size estimates of 2 to 10 mm were derived for the Martian surface materials from the Viking Gas Exchange Experiment. These size estimates approximately match the laboratory samples. Our tentative conclusion for the Sojourner observations is that fine clay-sized particles acquired an electrostatic charge during rover traverses and adhered to the rover wheels, carrying electrical charge to the rover. Since the Sojourner rover carried no instruments to measure this mission's onboard electrical charge, confirmatory measurements from future rover missions on Mars are desirable so that the physical and electrical properties of the Martian surface dust can be characterized. Sojourner was protected by discharge points, and Faraday cages were placed around sensitive electronics. But larger systems than Sojourner are being contemplated for missions to the Martian surface in the foreseeable future. The design of such systems will require a detailed knowledge of how they will interact with their environment. Validated environmental interaction models and guidelines for the Martian surface must be developed so that design engineers can test new ideas prior to cutting hardware. These models and guidelines cannot be validated without actual flighata. Electrical charging of vehicles and, one day, astronauts moving across the Martian surface may have moderate to severe consequences if large potential differences develop. The observations from Sojourner point to just such a possibility. It is desirable to quantify these results. The various lander/rover missions being planned for the upcoming decade provide the means for doing so. They should, therefore, carry instruments that will not only measure vehicle charging but characterize all the natural and induced electrical phenomena occurring in the environment and assess their impact on future missions.

Kolecki, Joseph C.↗

Station coordinates for GEOS-C altimeter calibration and experimentation

Station coordinates are given for the C-band radar GEOS-C altimeter calibration sites at Bermuda, Merritt, Grand Turk, and Wallops Islands. The coordinates were estimated in a multi-arc dynamic solution using GEOS-2 C-band radar and laser ranges with a priori information from the GSFC-1973 station coordinate solution. Comparisons with other solutions suggest a relative uncertainty of a few meters in each coordinate. Data reductions show that station coordinates of this quality can introduce a rapidly changing error into the altitude of a satellite whose orbit is determined from calibration area data alone. In contrast, global tracking constrains the orbit and results in slowly varying satellite position error.

Marsh, J. G.↗

S201 catalog of far-ultraviolet objects

A catalog of star images was compiled from images obtained by an NRL Far-Ultraviolet Camera/Spectrograph operated from 21 to 23 April 1972 on the lunar surface during the Apollo-16 mission. These images were scanned on a microdensitometer, and the output recorded on magnetic tapes. The catalog is divided into 11 parts, covering ten fields in the sky (the Sagittarius field being covered by two parts), and each part is headed by a constellation name and the field center coordinates. The errors in position of the detected images are less than about 3 arc-min. Correlations are given with star numbers in the Smithsonian Astrophysical Observatory catalog. Values are given of the peak density and the density volume. The text includes a discussion of the photometry, corrections thereto due to threshold and saturation effects, and its comparison with theoretical expectation, stellar model atmospheres, and a generalized far-ultraviolet interstellar extinction law. The S201 catalog is also available on a single reel of seven-track magnetic tape.

Page, T.↗

ARC+(Registered Trademark) and ARC PC Welding Simulators: Teach Welders with Virtual Interactive 3D Technologies

123 Certification Inc., a Montreal based company, has developed an innovative hands-on welding simulator solution to help build the welding workforce in the most simple way. The solution lies in virtual reality technology, which has been fully tested since the early 90's. President and founder of 123 Certification Inc., Mr. Claude Choquet Ing. Msc. IWE. acts as a bridge between the welding and the programming world. Working in these fields for more than 20 years. he has filed 12 patents world-wide for a gesture control platform with leading edge hardware related to simulation. In the summer of 2006. Mr Choquet was proud to be invited to the annual IIW International Weld ing Congress in Quebec City to launch the ARC+ welding simulator. A 100% virtual reality system and web based training center was developed to simulate multi process. multi-materiaL multi-position and multi pass welding. The simulator is intended to train welding students and apprentices in schools or industries. The welding simulator is composed of a real welding e[eetrode holder (SMAW-GTAW) and gun (GMAW-FCAW). a head mounted display (HMD), a 6 degrees of freedom tracking system for interaction between the user's hands and head. as well as external audio speakers. Both guns and HMD are interacting online and simultaneously. The welding simulation is based on the law of physics and empirical results from detailed analysis of a series of welding tests based on industrial applications tested over the last 20 years. The simulation runs in real-time, using a local logic network to determine the quality and shape of the created weld. These results are based on the orientation distance. and speed of the welding torch and depth of penetration. The welding process and resulting weld bc.1d are displayed in a virtual environment with screenplay interactive training modules. For review. weld quality and recorded process values can be displayed and diagnosed after welding. To help in the le.tming process, a learning curve for each student and each Virtual Welding Class'" can be plotted, for an instructor's review or a required third party evaluation.

Choquet, Claude↗

Localized material compression to correct distortion in wire arc additive manufacturing

Wire Arc Additive Manufacturing (WAAM) is an advanced manufacturing technology which utilizes welding systems to generate three dimensional geometries in a layer-by-layer fashion. Distortion or warping of a print substrate and WAAM components due to thermally induced residual stresses is an ongoing challenge limiting the widespread adoption of WAAM technologies for producing components. In this manuscript, a novel approach is described to address thermal distortion in deposited components by applying lateral compressions along the length of the deposited material. To demonstrate this method, a series of single-track walls were printed and compressed at evenly spaced intervals using a modified hydraulic cutter tool. The jaws of the tool were modified to compress material rather than to shear it. A mathematical model was developed to relate the curvature of the deposited material to the volume of compression required to eliminate this distortion. Validation of this model was performed using 3D scan data to compare the change in wall curvature induced by compression to the volume of the applied compressions. Substrate deflection was also compared against a control wall, and implementation of wall compression reduced maximum deflections by 93% across a series of four depositions and subsequent compressions. Wall cross sections were also analyzed to determine the impact of compression on material hardness and grain structure. The results demonstrate that successively placed lateral compressions can effectively control and potentially eliminate bending distortion in printed parts. This methodology can be further developed to form a robust model for correction of thermally-induced distortion in WAAM components.

Additive manufacturing↗

Rolling Behavior of Surface Tagged Aluminum 6061 using Photoluminescent Oxides

Physical tagging of nuclear fuel is potentially one way of tracking throughout the fuel lifecycle. The process of tagging can take many forms, but one promising method is to embed a small amount of photoluminescent particles in the surface of a material which are not detectable under normal illumination but are readily visible under excitation by ultraviolet light. The goal of this project was to explore the potential to tag simulated nuclear fuel cladding with small ceramic particles, via laser beam welding or gas tungsten arc welding, and measure the photoluminescent response. Surface tagging using this method has demonstrated viability and detectability throughout this project; work in FY24 focused on the survivability of these tags through subsequent deformation processing similar to what taggants in a fuel manufacturing environment would be subjected to. This work demonstrated that particles are readily visible in the as-welded state (i.e., before subsequent rolling treatment to represent mechanical processing of a fuel material), but visibility is reduced as the deformation is induced. Despite the reduction in photoluminescence, the taggants are still visible after rolling processes are performed, making this surface tagging technique a promising candidate for nuclear fuel cladding tagging. This work demonstrated, though, that targeted optimization work would be necessary to develop a robust taggant depending on the fidelity and luminescent properties required.

36 MATERIALS SCIENCE↗

The accuracy of altimetric surfaces

Estimates of the shape of the sea surface as determined from satellite altimeters have become of increasing importance in geophysics, geodesy and physical oceanography. The most effective error reduction procedures used in producing these surfaces have been some version of a crossing-arc analysis. The problem with this procedure is the absence of an easy means of evaluating the noise structure of the final result. By recasting the problem as one of objective mapping (optimal estimation) the error reduction is optimized and an explicit estimate is obtained of the wave-number structure of the final altimetric surface. Examples, suitable to a small computer, have been generated to show that the error reduction along the sub-satellite tracks is very great, with most of the residual lying in long wavelengths.

Wunsch, C.↗

Geostationary multipurpose platforms

In addition to the advantages generally associated with orbital platforms, such as improved reliability, economies of scale, simple connectivity of elements, reduced tracking demands and the restraint of orbital object population growth, geostationary platforms yield: (1) continuous access by fixed ground antennas for communications services; (2) continuous monitoring of phenomena over chosen regions of the earth's surface; (3) a preferred location for many solar-terrestrial physics experiments. The geostationary platform also offers a low-risk and economical solution to the impending saturation of the orbital arc/frequency spectrum, maximizing the capacity of individual slots and increasing the utility of the entire arc. It also allows the use of many small, simple and inexpensive earth stations through complexity inversion and high power per beam. Block diagram and operational flowcharts are provided.

Bekey, I.↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗

NASA-ARC 36 inch airborne infrared telescope

A 36 in. aperture telescope is being developed for installation aboard a NASA-Lockheed C-141A aircraft. This airborne observatory will permit observation of infrared emission at altitudes above 45,000 ft above much of the infrared-absorbing atmospheric water vapor. The telescope will look through a movable open port in the aircraft fuselage. A porous spoiler, upstream from the open port, will attenuate pressure disturbances and permit operation at ambient temperatures and pressures without an obscuring window. The telescope's entire structure is supported by a 16 in. spherical air bearing, which effectively isolates it from angular aircraft motions. This air bearing support, with inertial stabilization and star tracking, will permit net line of sight stability of better than 2 arcsec rms.

Mobley, R. E.↗

Analyses for precision reduced optical observations from the international satellite geodesy experiment (ISAGEX)

During the time period of December 1970 to September 1971 an International Satllite Geodesy Experiment (ISAGEX) was conducted. Over fifty optical and laser tracking stations participated in the data gathering portion of this experiment. Data from some of the stations had not been previously available for dynamical orbit computations. With the recent availability of new data from the Astrosoviet, East European and other optical stations, orbital analyses were conducted to insure compatibility with the previously available laser data. These data have also been analyzed using dynamical orbital techniques for the estimation of estimation of geocentric coordinates for six camera stations (for Astrosoviet, two East European). Thirteen arcs of GEOS-1 and 2 observations between two and four days in length were used. The uncertainty in these new station values is considered to be about 20 meters in each coordinate. Adjustments to the previously available values were generally a few hundred meters. With these geocentric coordinates these data will now be used to supplement earth physics investigations during the ISAGEX.

Marsh, J. G.↗

Magnetospheric Multiscale (MMS) Mission Commissioning Phase Orbit Determination Error Analysis

The Magnetospheric MultiScale (MMS) mission commissioning phase starts in a 185 km altitude x 12 Earth radii (RE) injection orbit and lasts until the Phase 1 mission orbits and orientation to the Earth-Sun li ne are achieved. During a limited time period in the early part of co mmissioning, five maneuvers are performed to raise the perigee radius to 1.2 R E, with a maneuver every other apogee. The current baseline is for the Goddard Space Flight Center Flight Dynamics Facility to p rovide MMS orbit determination support during the early commissioning phase using all available two-way range and Doppler tracking from bo th the Deep Space Network and Space Network. This paper summarizes th e results from a linear covariance analysis to determine the type and amount of tracking data required to accurately estimate the spacecraf t state, plan each perigee raising maneuver, and support thruster cal ibration during this phase. The primary focus of this study is the na vigation accuracy required to plan the first and the final perigee ra ising maneuvers. Absolute and relative position and velocity error hi stories are generated for all cases and summarized in terms of the ma ximum root-sum-square consider and measurement noise error contributi ons over the definitive and predictive arcs and at discrete times inc luding the maneuver planning and execution times. Details of the meth odology, orbital characteristics, maneuver timeline, error models, and error sensitivities are provided.

Chung, Lauren R.↗

Tracking with the mind's eye

The two components of voluntary tracking eye-movements in primates, pursuit and saccades, are generally viewed as relatively independent oculomotor subsystems that move the eyes in different ways using independent visual information. Although saccades have long been known to be guided by visual processes related to perception and cognition, only recently have psychophysical and physiological studies provided compelling evidence that pursuit is also guided by such higher-order visual processes, rather than by the raw retinal stimulus. Pursuit and saccades also do not appear to be entirely independent anatomical systems, but involve overlapping neural mechanisms that might be important for coordinating these two types of eye movement during the tracking of a selected visual object. Given that the recovery of objects from real-world images is inherently ambiguous, guiding both pursuit and saccades with perception could represent an explicit strategy for ensuring that these two motor actions are driven by a single visual interpretation.

NASA Discipline Neuroscience↗

Development of a mobile research flight test support capability

This paper presents the approach taken by the NASA Western Aeronautical Test Range (WATR) of the Ames Research Center (ARC) to develop and utilize mobile systems to satisfy unique real-time research flight test requirements of research projects such as the advanced fighter technology integration (AFTI) F-16, YAV-8B Harrier, F-18 high-alpha research vehicle (HARV), XV-15, and the UH-60 Black Hawk. The approach taken is cost-effective, staff efficient, technologically current, and provides a safe and effective research flight test environment to support a highly complex set of real-time requirements including the areas of tracking and data acquisition, communications (audio and video) and real-time processing and display, postmission processing, and command uplink. The development of this capability has been in response to the need for rapid deployment at varied site locations with full real-time comutation and display capability. This paper will discuss the requirements, implementation and growth plan for mobile systems development within the NASA Western Aeronautical Test Range.

Rhea, Donald C.↗

Universal Injector at LERF – Baseline Design

A new electron injector complex has been proposed within the Low Energy Recirculating Facility (LERF) vault, which would serve both the 22 GeV CEBAF and the positron programs, while being compatible with the electron source required to produce positrons for Ce+BAF. The baseline design of a 3-pass recirculator features a main linac configured with three cryomodules, five isochronous arcs and three straight sections, allowing electron beam acceleration up to 650 MeV. The injector offers the flexibility to extract 1-pass and 2-pass energy electrons, as needed for positron production, with final reconfiguration to a 3-pass 650 MeV injector for 22 GeV CEBAF. This paper provides an overview of the baseline design of the Universal injector complex, including the 8 MeV injector and the recirculator. A comprehensive suite of beam dynamics studies to validate our design is being launched, starting with start-to-end tracking with Elegant followed by the orbit correction and error mitigation.

Bogacz, A. [Thomas Jefferson National Accelerator ↗

A gravity field comparison and analysis to support Magellan navigation

The orbit characteristics of Magellan are such that the spacecraft is extremely sensitive to gravity perturbations; therefore, the precision orbit determination required to construct the radar images is very dependent on accurate gravitational field modeling. As such, a comparison and analysis is presented of four global harmonic Venusian gravity fields generated by two-way S-band Doppler tracking data from the Pioneer Venus Orbiter in order to support the precise navigational requirements of the Magellan spacecraft. The four fields are: (1) one of degree and order 10 (a 10 x 10) from Mottinger et al. (1985), (2) an 18 x 18 from Bills et al. (1987), (3) a 21 x 21 from McNamee et al. (1990), and (4) a 36 x 36 from Smith et al. (1991). Least-square fits are done with each gravity field on 36 8-rev Magellan X-band data arcs, spaced at 10-deg longitude intervals, completely encircling Venus. Trajectory differences are also performed for two distinct cases, one where the gravity field modeling coincides, and the other where the gravity fields are very different. Although all of the above fields are found to model Venus gravity fairly well, the results show that there is still much room for improvement in Venus gravity modeling.

Kronschnabl, G. R.↗

A Search for Optically Faint GEO Debris

Existing optical surveys for debris at geosynchronous orbit (GEO) have been conducted with meter class telescopes, which have detection limits in the range of 18th-19th magnitude. We report on a new search for optically faint debris at GEO using the 6.5-m Magellan 1 telescope Walter Baade at Las Campanas Observatory in Chile. Our goal is to go as faint as possible and characterize the brightness distribution of debris fainter than R = 20th magnitude, corresponding to a size smaller than 10 cm assuming an albedo of 0.175. We wish to compare the inferred size distribution for GEO debris with that for LEO debris. We describe results obtained during 9.4 hours of observing time during 25-27 March 2011. We used the IMACS f/2 instrument, which has a mosaic of 8 CCDs, and a field of view of 30 arc-minutes in diameter. This is the widest field of view of any instrument on either Magellan telescope. All observations were obtained through a Sloan r filter. The limiting magnitude for 5 second exposures is estimated to be fainter than 22. With this small field of view and the limited observing time, our objective was to search for optically faint objects from the Titan 3C Transtage (1968-081) fragmentation in 1992. Eight debris pieces and the parent rocket body are in the Space Surveillance Network public catalog. We successfully tracked two cataloged pieces of Titan debris (SSN # 25001 and 33519) with the 6.5-m telescope, followed by a survey for objects on similar orbits but with a spread in mean anomaly. To detect bright objects over a wider field of view (1.6x1.6 degrees), we observed the same field centers at the same time through a similar filter with the 0.6-m MODEST (Michigan Orbital DEbris Survey Telescope), located 100 km to the south of Magellan at Cerro Tololo Inter-American Observatory, Chile. We will describe our experiences using Magellan, a telescope never used previously for orbital debris research, and our initial results.

Seitzer, Patrick↗