Search NASA⌕ Search

SEARCH · Search NASA

Results for “building management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

EnergyPlus Model Context Protocol Server (EnergyPlus-MCP) v0.1

EnergyPlus-MCP is the first open-source Model Context Protocol server specifically designed for EnergyPlus building energy simulation. This innovative software enables AI assistants and other applications to interact programmatically with EnergyPlus through a standardized, secure interface, eliminating traditional technical barriers in building energy modeling. The software provides specialized tools across five functional domains: server management, model configuration and loading, comprehensive building component inspection, systematic model modification, and simulation execution with results visualization. Key features include automated HVAC system discovery and topology mapping, advanced schedule analysis, intelligent model validation, and interactive visualization capabilities. EnergyPlus-MCP's layered architecture ensures robust separation between protocol communication and domain expertise, enabling scalable deployment across organizations, educational institutions, and research teams. Unlike direct LLM approaches that suffer from inconsistent results and security gaps, EnergyPlus-MCP provides validated, reliable interactions while maintaining scientific rigor. This democratizes sophisticated building energy analysis, making EnergyPlus accessible to broader audiences through conversational interfaces and streamlined workflows.

Li, Han [Lawrence Berkeley National Laboratory (LB↗

Microreactor Security-by-Design Recommendations for Domestic and International Deployments

This report outlines methods vendors can use to incorporate security-by-design (SeBD) into their microreactor facility design to support and address security for both U.S. and international deployment. The team developed a hypothetical below-grade microreactor with a physical protection system (PPS) to protect the microreactor against acts of theft and sabotage and evaluated it against two adversary attack scenarios defined by a group of adversary subject matter experts (SMEs). The hypothetical microreactor facility consists of two distinct buildings. The first is the above-grade protected area (PA) entry control point (ECP) building, which houses security personnel responsible for conducting screenings and managing access to the PA. The second building is the reactor building, which features both an above-grade floor and a below-grade floor.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Building Adapter: Automatic Mapping of Commercial Buildings for Scalable Building Analytics

This project creates new solutions for the manual metadata mapping problem: the costly process of creating a match between a building’s sensor data streams and the inputs of a building analytics engine. This goal is achieved by creating and improving techniques for metadata inference: automatically constructing new contextual information for sensing and control points based on the sensor point names and the raw time series values. The objective is to enable vendors to apply building analytics to 90% of buildings with no manual mapping, and to 10% of buildings with a 90% reduction in manual mapping. These targets are set for all types of metadata required by current analytics engines, including type, location, equipment type, and other relationships. The outcome of this project is a suite of solutions to the manual mapping problem collectively called the Building Adapter that allows vendors to apply analytics engines to new buildings at a significantly reduced cost.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Return to Flight Resource Reel 2 of 2

A continuation of the tests performed on the Space Shuttle Discovery in preparation for its return to flight is presented. The tests include: 1) Shuttle Robot Arm Recertification; 2) Michael Hiltz Systems Group Leader; 3) Orbiter Boom Fabrication; 4) Orbiter Boom Final Development; 5) Gary Searle Manager of Orbiter Boom Sensor System (OBSS) Manufacturing and Assembly; 6) Orbiter Boom Qualification Unit; 7) STS-114 Crew Inspects Orbiter Boom at Kennedy Space Center; 8) Orbiter Boom Inspection of Thermal Protection System Animation; 9) External Tank Bipod Redesign; 10) External Tank Flange Redesign; 11) External Tank Bellows Redesign; 12) Shuttle Main Engine Testing and Delivery to Kennedy Space Center; 13) Ronnie Rigney Project Manager Space Shuttle Main Engine Program Office; 14) Gene Goldmman NASA Project Manager Space Shuttle Main Engine Project; 15) Mike Cosgrove Boeing-Rocketdyne Flow Manager; 16) Shuttle Rocket Booster Build-Up; 17) Ascent Imagery Improvements; and 18) STS-114 Flight Control Team and Mission Management Team.

Source record↗

2019 Corrective Measures Implementation and Intermim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from May 2019 through December 2019 at the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida.

MOBILE LAUNCH PLATFORM / VEHICLE ASSEMBLY BUILDING↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a “living document.” Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation. The current (2023) update incorporates new findings and/or updated text based on completed or ongoing projects related to cultural resources at BNL since inception of the last updated CRMP in 2013. Historically, Brookhaven National Laboratory had little need for cultural resource management because many of its buildings were less than 50 years old. Most of the features that are potentially eligible for inclusion in the National Register of Historic Places were protected simply by avoiding the features. Compliance with cultural resource laws and regulations has included archeological surveys, such as those associated with the 1977 Final Environmental Impact Statement for Brookhaven National Laboratory and the 1978 Final Environmental Impact Statement for the Proton-Proton Storage Accelerator Facility (ISABELLE). In 1979, World War I trenches associated with the former Camp Upton and located near ISABELLE were determined to be eligible for inclusion in the National Register of Historic Places; however, many of these trenches had been destroyed by construction work. In 1991, the NYSHPO provided BNL with a letter indicating that only three structures and features were likely to be eligible for inclusion in the National Register of Historic Places. Between 1991 and 1999, little work associated with cultural resource management was accomplished. Beginning in 1999, awareness for the need of a program to manage cultural resources grew out of the realization that over half of the buildings at BNL were either 50 years old or were reaching that age and were, therefore, subject to the requirements in Section 106 of the National Historic Preservation Act. This fact, concomitant with the decontamination and decommissioning of the Brookhaven Graphite Research Reactor (BGRR) and the subsequent determination of BGRR’s eligibility for listing as an historical site, fueled the need for developing and implementing a more structured program for managing cultural resources at BNL.

54 ENVIRONMENTAL SCIENCES↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radioisotope Analysis of Wastewater from Livermore Site Retention Tanks by Gel Laboratory Gross Alpha, Gross Beta and Tritium Sampling Method

Lawrence Livermore National Laboratory discharged approximately 4.4% of the City of Livermore’s total wastewater in 2022 (LLNL’s Annual Site Environmental Report, Chapter 5, 2022). This volume includes wastewater from Sandia National Laboratories (SNL) and some process wastewater from Site 300. Due to the high volume and constituents of the discharge, LLNL works alongside the City of Livermore under permit #1250, requiring wastewater generated to be monitored and sampled in accordance with permit limits. Process wastewater, from buildings with the highest risk to sewer, is collected by wastewater retention tanks throughout the Livermore Site and sampled prior to discharge. Domestic wastewater directly discharges to sanitary sewer. To maintain permit requirements and ensure proper wastewater discharge practices, an internal wastewater audit was conducted during the summer of 2023. Current wastewater practices, regulatory knowledge and risk management across various Livermore Site buildings were evaluated. Workspaces connected to a wastewater retention tank and sanitary sewer drains were major focus areas. Data collected from walk-throughs prompted further evaluation as many practices were reported to be done based on historical usage. A table of concerns was created to showcase reasons for auditing and proceeding action. An analysis of current and historical retention tank usage throughout LLNL Livermore Site buildings with radioisotope results over a 5-year period from 2019 to 2024, was done to assess building trends and any significant changes throughout the 5-year period. Analytes evaluated were Gross Alpha, Gross Beta and Tritium (GABT) of eleven buildings at the Livermore Site, posing the highest risk to sanitary sewer for radioisotopes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Creating a Resilience Risk Management Plan

This fact sheet provides actionable planning steps for developing a resilience roadmap in your organization. These steps can serve as an outline to help portfolio managers and other stakeholders manage the financial performance of a commercial building portfolio.

Resilience, Resiliency, Commercial building, comme↗

Grid-Interactive Efficient Buildings Support Federal Facility Decarbonization

The Federal Energy Management Program (FEMP) plays a key role in helping agencies understand and meet energy-related goals, including those surrounding smart buildings technologies and grid-interactive efficient buildings (GEBs), which can support decarbonization. GEB enables demand flexibility that has the potential to reduce electrical infrastructure costs and transform the grid edge, where buildings connect to the power grid.

decarbonization↗

Cost Analysis of Annual and Monthly Net Zero Energy Performance for Multifamily Buildings in the United States

As the United States continues its progress toward sustainable construction, net zero building design is becoming an increasingly important and popular topic. Two definitions of net zero energy performance, monthly and annual, provide different levels of energy autonomy and efficiency within a building. This article analyzes the viability and incremental cost for two-, three-, and four-story multifamily apartment buildings to reach both annual and monthly net zero energy performance throughout four climate zones in the United States using baseline reference buildings that represent current construction practices. Building size plays a large role in determining the capability for a building model to reach annual or monthly net zero. Two-story buildings are capable of reaching annual net zero with an increase in construction cost of about 4.4–5.6%. Three-story buildings in warmer climates can achieve annual net zero with an increase of about 5.1%, but models in colder climates cannot reach annual net zero performance. Four-story buildings cannot achieve net zero, owing to insufficient building area for solar arrays to produce electricity. Monthly net zero energy performance was significantly harder to achieve, with the only case reaching this goal being the two-story Houston based model, at an added cost of 8.2%. Generally speaking, only small buildings in warm climates will be able to achieve monthly net zero without vastly oversizing photovoltaic systems and increasing costs without adequate payback.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing Grid-interactive Efficient Building Designs with Stacked Value Streams

Grid-interactive efficient buildings (GEBs) are those characterized by the combination of energy efficiency and demand flexibility with smart technologies and communications to not only deliver greater affordability and comfort to buildings, but also help utilities manage grid operations and lower system costs. This paper presents an innovative techno-economic assessment framework to effectively examine different GEB design options, explore various use cases, define technically achievable benefits, and thereby assist in informed decision-making. In particular, building load flexibility, thermal storage, and battery energy storage are considered. Advanced optimal dispatch problem is formulated to maximize the stacked value streams from multiple, competing use cases, subject to the physical capabilities and operational flexibility associated with different designs and configurations. Comprehensive case studies were performed for a real-world building to evaluate the cost-effectiveness of different GEB designs and offer in-depth insights. It was found that the proposed assessment method could effectively capture the costs and benefits linked to each GEB design option. Furthermore, the study revealed that outage mitigation and demand response are the two most significant sources of benefits for GEBs.

Ma, Xu↗

Managing computer-controlled operations

A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.

Plowden, J. B.↗

Field Validation of a Building Operating System Platform

The U.S General Services Administration's (GSA's) Green Proving Ground program, in partnership with the National Renewable Energy Laboratory. completed a large pilot study of an Energy Management Information Systems (EMIS) with Automated System Optimization (ASO). Four test bed facilities, each with different building characteristics and systems, were chosen for the implementation of cloud-based EMIS with ASO. Depending on functionality, this tool can be extremely effective in energy management and energy optimization in buildings. The capabilities evaluated in the pilot ranged from energy savings and energy consumption predictions to evaluations of user acceptance, operability, and ease of installation. This report presents the methodology, lessons learned and best practices, and deployment recommendations for the GSA's portfolio of commercial office space, comprising more than 8,500 properties.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dynamic Decarbonization through Autonomous Physics-Centric Deep Learning and Optimization of Building Operations (Abstract only)

This project directly addresses the primary goal of Area of Interest 2 in the CRADA call: to advance optimization-based integrated energy management systems in commercial and residential buildings. Pacific Northwest National Laboratory (PNNL) and its industry partner PassiveLogic aim to accomplish this by reaching three key objectives. First, to ensure a broad impact in the building controls industry, PNNL will extend its open-source library for predictive control synthesis by augmenting its capabilities with data-driven self-learning of building models and auto-calibration of predictive controllers. The effort will focus on building use cases selected in collaboration with PassiveLogic. The team will specifically address the development of methods for data-driven adaptation of building models, investigation of model architectures that best address specific building types, and automated synthesis of differentiable predictive controllers that optimize diverse objectives. Second, PNNL will collaborate with PassiveLogic to integrate the aforementioned methods with PasiveLogic’s advanced controls platform. The collaborative integration effort will inform the developments under the first objective by providing specific data on the attainable performance of model learning on resource-constrained edge computing platforms. This software integration effort will increase the technical maturity of the developed libraries by exploring the use of software integration tools and methods. Third, PNNL and PassiveLogic will work to improve the technology readiness of the developed predictive controllers by testing their performance in relevant test environments, such as high-fidelity simulation, hardware in the loop, and actual test buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Case Study: Field Evaluation of a Low-Cost Circuit-Level Electrical Submetering System

Circuit-level metering technologies provide the ability to monitor individual circuits within an electrical panel in a building, providing detailed power and energy consumption data at a much more granular level than was previously achievable in a cost-effective manner. While the fundamental hardware components of circuit-level—split-core current transformers (CTs) and power monitoring meters—have existed for some time, the new offerings in the market have tightly integrated these components, lower costs, and have streamlined data organization, transport, and access via software solutions accessible through web and application programming interfaces (API). NREL evaluated Meazon’s single-circuit metering system. The evaluation of the equipment under test (EUT) focused on three aspects: (1) accuracy of the data provided by the system, (2) ease of installation of this technology and ease of data integration into existing U.S. General Services Administration (GSA) analytics platforms, and (3) total cost of ownership and cost-effectiveness of the technology. The metering technology was tested in a field deployment where it was installed in low and high-voltage commercial electrical panels in the César E. Chávez Memorial Building in Denver, Colorado. The goals were to assess the metering accuracy, the ease of installation and data retrieval, and the total cost of ownership and cost-effectiveness. This technology proved easy to install by a certified electrician who completed the install of 6 meters in 2 separate panels (120/208 V and 277/480 V) and 2 circuit disconnects (along with associated commissioning) at the César E. Chávez Memorial Building in less than one day. The technology was installed in high- and low-voltage panels and with limited space in the electrical room, demonstrating the applicability of this technology to almost all commercial buildings in the GSA portfolio. Primary considerations for this technology include appropriate sizing of CTs for each circuit, selection of loads/circuits/panels that are of high value for detailed submetering (e.g., tailored for high-load devices), and how GSA would like to integrate these data with its existing energy management infrastructure. Through the field evaluation, we demonstrated data integration from the vendor system into the primary software component on the GSA enterprise-level energy management and information system, GSA Link. Data from the circuit-level metering were integrated into this platform and used to perform FDD. This demonstrated the ability of the EUT to augment existing energy management and information systems in buildings where GSA Link is deployed and provides a pathway for delivering FDD at other buildings throughout the portfolio.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Emerging Plug Load Management Technologies that Save Energy and Time

This fact sheet introduces two emerging technologies that could streamline plug load management (PLM) for increased energy savings for building owners: learning behavior algorithms (LBA) and automatic and dynamic load detection (ADLD). Plug loads are responsible for 47% of the energy consumed in commercial buildings, yet their distributed and ever-changing nature makes them challenging to manage. PLM systems exist today that use smart plugs to meter and control devices at the outlet level, but their uptake has been relatively slow in part because of the significant labor required for installation and maintenance. LBA and ADLD may address these challenges and provide additional energy efficiency and nonenergy benefits.

Plug and process loads, PPL, plug loads, plug load↗

Prescreening-Based Subset Selection for Improving Predictions of Earth System Models With Application to Regional Prediction of Red Tide

We present the ensemble method of prescreening-based subset selection to improve ensemble predictions of Earth system models (ESMs). In the prescreening step, the independent ensemble members are categorized based on their ability to reproduce physically-interpretable features of interest that are regional and problem-specific. The ensemble size is then updated by selecting the subsets that improve the performance of the ensemble prediction using decision relevant metrics. We apply the method to improve the prediction of red tide along the West Florida Shelf in the Gulf of Mexico, which affects coastal water quality and has substantial environmental and socioeconomic impacts on the State of Florida. Red tide is a common name for harmful algal blooms that occur worldwide, which result from large concentrations of aquatic microorganisms, such as dinoflagellate Karenia brevis, a toxic single celled protist. We present ensemble method for improving red tide prediction using the high resolution ESMs of the Coupled Model Intercomparison Project Phase 6 (CMIP6) and reanalysis data. The study results highlight the importance of prescreening-based subset selection with decision relevant metrics in identifying non-representative models, understanding their impact on ensemble prediction, and improving the ensemble prediction. These findings are pertinent to other regional environmental management applications and climate services. Additionally, our analysis follows the FAIR Guiding Principles for scientific data management and stewardship such that data and analysis tools are findable, accessible, interoperable, and reusable. As such, the interactive Colab notebooks developed for data analysis are annotated in the paper. This allows for efficient and transparent testing of the results’ sensitivity to different modeling assumptions. Moreover, this research serves as a starting point to build upon for red tide management, using the publicly available CMIP, Coordinated Regional Downscaling Experiment (CORDEX), and reanalysis data.

54 ENVIRONMENTAL SCIENCES↗