Search NASA⌕ Search

SEARCH · Search NASA

Results for “building services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Meeting Building Energy Performance Standards at The Westory

The Westory office building used Washington, DC's Building Energy Performance Standard as an impetus for energy efficiency improvements and certification with the assistance of Cushman & Wakefield's Energy & Sustainability Services.

Energy Performance Standards, Energy Audit, ENERGY↗

State Technical Assistance - New Mexico Energy and Conservation Management Division Report [Slides]

The New Mexico Energy and Conservation Management Division (ECMD) sought technical assistance to enhance their ability to evaluate program impacts using the Low-Income Energy Affordability Data (LEAD) tool. NLR assisted ECMD in leveraging the LEAD tool to calculate and analyze energy burden across electric utility service areas, enabling them to assess program outcomes more effectively. To meet ECMD's goals, NLR developed a customized methodology to calculate utility-specific energy burden metrics using census tract data and available utility service area information from the Energy Information Administration (EIA). While acknowledging some limitations in the EIA dataset, NLR estimated the percentage of households within each service territory and incorporated relevant filters such as income, housing characteristics, and other demographics from the LEAD tool. The analysis provided ECMD with a new capability to evaluate program success based on energy savings, reductions in energy burden, and other performance indicators. The data and methodology also support discussions with utilities to improve the accuracy of service territory datasets. ECMD can use the outputs to track program effectiveness and plan future initiatives. NLR offered the possibility of follow-on work, including capacity-building for ECMD to repeat the analysis independently and the option to refine the analysis with updated service.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Distributed Solar Adoption in Orlando: A Household-Level Model for Distribution Resource Planning

Potential for rooftop solar in Florida is massive (47% of retail sales, 3rd overall nationally), yet adoption lags (12th nationally). A 2018 Florida Public Service Commission ruling authorizing solar third-party ownership (leasing) has substantially increased attention on distributed solar in the state. The city of Orlando has committed to a 100% clean-energy target by 2050 and deployment of solar and storage are expected to contribute significantly to reaching the goal. Deployment of customer-adopted solar, unlike utility-procured solar, is uncertain, but known to be spatially correlated with demographic factors and existing adoption. We develop a new method to adapt NREL's dGen model in order to represent building-level agents in adoption forecasts for the Orlando Utility Commission (OUC) service territory. Using the agent-based model we develop projections of solar adoption, subject to scenarios varying future solar costs and valuation, and aggregate adoption predictions by OUC distribution feeder. We find substantial spatial heterogeneity in the projected level of adoption by OUC distribution feeder. For instance, 25% of all projected adoption through 2050 would be concentrated on just 5% of feeders and 88% of projected adoption on 50% of feeders. Because of the uncertainty in adoption, bottoms-up solar adoption forecasting methods at the household-level are integral to long-term resource planning by anticipating system needs as customers increasingly adopt distributed solar, storage, electric vehicles, and other distributed energy resources.

14 SOLAR ENERGY↗

The Space Superhighway: A Cost Analysis of an In-Space Logistics Resupply Network

The Space Superhighway is a concept for an in-space logistics network for payload delivery and propellant resupply within the Earth-Moon system. It is expected that in the next several years the number of spacecraft in cislunar space will increase significantly. Commercial launch service providers have significantly reduced the cost of access to space and reduced the barrier to entry for private companies to build and operate their own satellites. Many of these newer satellites are being designed to take advantage of future In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities. In addition, the National Aeronautics and Space Administration (NASA) intends to develop and maintain a sustained human presence in cislunar space and on the surface of the Moon. The sustained lunar presence will then serve as a steppingstone for human missions to Mars. The combined demand for propellant resupply and payload delivery in cislunar space for NASA's Moon to Mars campaign in addition to commercial ventures will likely exceed 1,000 t in the upcoming decades. This work presents a concept for an in-space logistics network to fulfill that demand. The network consists of commercial launch vehicles, propellant tankers, orbital depots, and in-space electric propulsion tugs. This work specifically analyzes the cost of developing, producing, and operating such a network at varying levels of customer demand.

nrho↗

The Space Superhighway: A Cost Analysis of an In-Space Logistics Resupply Network

The Space Superhighway is a concept for an in-space logistics network for payload delivery and propellant resupply within the Earth-Moon system. It is expected that in the next several years the number of spacecraft in cislunar space will increase significantly. Commercial launch service providers have significantly reduced the cost of access to space and reduced the barrier to entry for private companies to build and operate their own satellites. Many of these newer satellites are being designed to take advantage of future In-space Servicing, Assembly, and Manufacturing (ISAM) capabilities. In addition, the National Aeronautics and Space Administration (NASA) intends to develop and maintain a sustained human presence in cislunar space and on the surface of the Moon. The sustained lunar presence will then serve as a steppingstone for human missions to Mars. The combined demand for propellant resupply and payload delivery in cislunar space for NASA's Moon to Mars campaign in addition to commercial ventures will likely exceed 1,000 t in the upcoming decades. This work presents a concept for an in-space logistics network to fulfill that demand. The network consists of commercial launch vehicles, propellant tankers, orbital depots, and in-space electric propulsion tugs. This work specifically analyzes the cost of developing, producing, and operating such a network at varying levels of customer demand.

space superhighway↗

PER- AND POLYFLUOROALKYL SUBSTANCES SITE ASSESSMENT PROGRESS REPORT FORMER FIRE STATION 2 AND VEHICLE ASSEMBLY BUILDING NORTH KENNEDY SPACE CENTER, FLORIDA

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Quantity Contract 80KSC019D0010, Task Order 80KSC019F0096. The purpose of this report is to document ongoing site assessment activities at Former Fire Station 2 (FS2) and the Vehicle Assembly Building North (VABN) Area. Former FS2 was identified as a potential source of PFAS contamination based on its previous use as a fire station; the VAB North Area has several areas that were identified as potential PFAS sources.

Megan E. Garcia↗

Using AI/expert system technology to automate planning and replanning for the HST servicing missions

This paper describes a knowledge-based system that has been developed to automate planning and scheduling for the Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART has been delivered to the HST Flight Operations Team (FOT) at Goddard Space Flight Center (GSFC) where it is being used to build integrated time lines and command plans to control the activities of the HST, Shuttle, Crew and ground systems for the next HST Servicing Mission. SM/PART reuses and extends AI/expert system technology from Interactive Experimenter Planning System (IEPS) systems to build or rebuild time lines and command plans more rapidly than was possible for previous missions where they were built manually. This capability provides an important safety factor for the HST, Shuttle and Crew in case unexpected events occur during the mission.

Bogovich, L.↗

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Editorial for Special Issue: Grid-Interactive Efficient Buildings - Part 1

We are pleased to present starting with this volume of ASME Journal of Engineering for Sustainable Buildings and Cities (JESBC), a series of peer-reviewed papers related to some of ongoing research projects and applications of Grid-interactive Efficient Buildings (GEBs). As part of a new program initiated by the Building Technology Office (BTO) with the US Department of Energy (DOE), GEBs are characterized as highly energy-efficient buildings that are equipped with smart technologies and distributed energy resources that can be dynamically controlled to meet grid needs and minimize electricity system costs, while meeting occupants’ comfort and productivity requirements. In simple terms,DOE defines GEBs as efficient, connected, smart, and flexible buildings. The GEB technologies touch on the main topical areas of JESBC aimed at fostering sustainable buildings and cities by providing results of evaluation studies and demonstration projects. Indeed, one of the main goals for JESBC is to disseminate solutions to enhance the built environment energy efficiencies, low carbon services, inter-connectivity services, resilient multi-services, and healthy and comfortable living spaces.

buildings↗

Integration of In-Situ Resource Utilization Into Lunar/Mars Exploration Through Field Analogs

The NASA project to develop In-Situ Resource Utilization (ISRU) technologies, in partnership with commercial and international collaborators, has achieved full system demonstrations of oxygen production using native regolith simulants. These demonstrations included robotic extraction of material from the terrain, sealed encapsulation of material in a pressurized reactor; chemical extraction of oxygen from the material in the form of water, and the electrolysis of water into oxygen and hydrogen for storage and reuse. These successes have provided growing confidence in the prospects of ISRU oxygen production as a credible source for critical mission consumables in preparation for and during crewed missions to the moon and other destinations. Other ISRU processes, especially relevant to early lunar exploration scenarios, have also been shown to be practical, including the extraction of subsurface volatiles, especially water, and the thermal processing of surface materials for civil engineering uses and for thermal energy storage. This paper describes these recent achievements and current NASA ISRU development and demonstration activity. The ability to extract and process resources at the site of exploration into useful products such as propellants, life support and power system consumables; and radiation and rocket exhaust plume debris shielding, known as In-Situ Resource Utilization or ISRU, has the potential to significantly reduce the launch mass, risk, and cost of robotic and human exploration of space. The incorporation of ISRU into missions can also significantly influence technology selection and system development in other areas such as power, life support, and propulsion. For example. the ability to extract or produce large amounts of oxygen and/or water in-situ could minimize the need to completely close life support air and water processing system cycles, change thermal and radiation protection of habitats, and influence propellant selection for ascent vehicles and surface propulsive hoppers. While concepts and even laboratory work on evaluating and developing ISRU techniques such as oxygen extraction from lunar regolith have been going on since before the Apollo 11 Moon landing, no ISRU system has ever flown in space, and only recently have ISRU technologies been developed at a scale and at a system level that is relevant to actual robotic and human mission applications. Because ISRU hardware and systems have never been demonstrated or utilized before on robotic or human missions, architecture and mission planners and surface system hardware developers are hesitant to rely on ISRU products and services that are critical to mission and system implementation success. To build confidence in ISRU systems for future missions and assess how ISRU systems can best influence and integrate with other surface system elements, NASA, with international partners, are performing analog field tests to understand how to take advantage of ISRU capabilities and benefits with the minimum of risk associated with introducing this game-changing approach to exploration. This paper will describe and review the results of four analog field tests (Moses Lake in 6/08, Mauna Kea in 11/08. Flagstaff in 9/09; and Mauna Kea in 1/10) that have begun the process of integrating ISRU into robotic and human exploration systems and missions, and propose future ISRU-related analog field test activities that can be performed in collaboration with international space agencies.

Sanders, Gerald B.↗

Space Launch System Co-Manifested Payload Options for Habitation

The Space Launch System (SLS) has a co-manifested payload capability that will grow over time as the launch vehicle matures and planned upgrades are implemented. The final configuration is planned to be capable of inserting a payload greater than 10 metric tons (mt) into a trans-lunar injection trajectory along with the crew in the Orion capsule and its service module. The co-manifested payload is located below the Orion and its service module in a 10 m high fairing similar to the way the Saturn launch vehicle carried the lunar lander below the Apollo command and service modules. Various approaches that utilize this comanifested payload capability to build up infrastructure in deep space have been explored in support of future asteroid, lunar, and Mars mission scenarios. This paper reports on the findings of the Advanced Concepts Office study team at NASA Marshall Space Flight Center (MSFC) working with the Advanced Exploration Systems Program on the Exploration Augmentation Module Project. It includes some of the possible options for habitation in the co-manifested payload volume of the SLS. Findings include a set of module designs that can be developed in 10 mt increments to support these co-manifested payload missions along with a comparison of this approach to a large-module payload flight configuration for the SLS.

Smitherman, David↗

TPSAS-NF1676L-34431-DND

On-Orbit Servicing, Assembly, and Manufacturing (OSAM) provide a suite of capabilities to build larger, more resilient spacecraft than current approaches. OSAM Technologies for which NASA Langley retains intellectual property rights will be described to foster possible technology transfer from the government to industry.

Johnny Fernandez↗

Data-Driven Modeling of High-Resolution Residential Load Profiles Using Low-Resolution Smart Meter Measurements

Accurate and high-resolution residential load profiles are essential for power system modeling, demand response planning, and effective grid operation. As the energy sector moves towards a more actively managed distribution system, the ability to understand residential energy consumption at a minute-by-minute scale becomes increasingly critical. High-resolution load profiles provide key insights into demand patterns and user behavior, enabling grid operators to design more effective energy solutions; however, residential load measurements in the field are typically recorded at low resolutions, such as 15-60 minutes, which makes it hard to study the characteristics of different residential customers. This paper addresses these challenges by introducing a data-driven approach to generate realistic, high-resolution residential load profiles based on lowre-solution measurements and weather information. The proposed method retains the key features of the actual residential load measurements while offering appliance-level energy consumption details for each residential building. The results demonstrate the effectiveness of the proposed load profile generator, proving its capability to support utilities in optimizing residential energy management and ensuring a more reliable and resilient grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Auto-Generated Semantic Processing Services

Auto-Generated Semantic Processing (AGSP) Services is a suite of software tools for automated generation of other computer programs, denoted cross-platform semantic adapters, that support interoperability of computer-based communication systems that utilize a variety of both new and legacy communication software running in a variety of operating- system/computer-hardware combinations. AGSP has numerous potential uses in military, space-exploration, and other government applications as well as in commercial telecommunications. The cross-platform semantic adapters take advantage of common features of computer- based communication systems to enforce semantics, messaging protocols, and standards of processing of streams of binary data to ensure integrity of data and consistency of meaning among interoperating systems. The auto-generation aspect of AGSP Services reduces development time and effort by emphasizing specification and minimizing implementation: In effect, the design, building, and debugging of software for effecting conversions among complex communication protocols, custom device mappings, and unique data-manipulation algorithms is replaced with metadata specifications that map to an abstract platform-independent communications model. AGSP Services is modular and has been shown to be easily integrable into new and legacy NASA flight and ground communication systems.

Davis, Rodney↗

A psychologist's view of validating aviation systems

All systems, no matter what they are designed to do, have shortcomings that may make them less productive than was hoped during the initial development. Such shortcomings can arise at any stage of development: from conception to the end of the implementation life cycle. While systems failure and errors of a lesser magnitude can occur as a function of mechanical or software breakdown, the majority of such problems, in aviation are usually laid on the shoulders of the human operator and, to a lesser extent, on human factors. The operator bears the responsibility and blame even though, from a human factors perspective, error may have been designed into the system. Human factors is not a new concept in aviation. The name may be new, but the issues related to operators in the loop date back to the industrial revolution of the nineteenth century and certainly to the aviation build-up for World War I. During this first global confrontation, military services from all sides discovered rather quickly that poor selection and training led to drastically increased personnel losses. While hardware design became an issue later, the early efforts were primarily focused on increased care in pilot selection and on their training. This actually involved early labor-intensive simulation, using such devices as sticks and chairs mounted on rope networks which could be manually moved in response to control input. The use of selection criteria and improved training led to more viable person-machine systems. More pilots survived training and their first ten missions in the air, a rule of thumb arrived at by experience which predicted ultimate survival better than any other. This rule was to hold through World War II. At that time, personnel selection and training became very sophisticated based on previous standards. Also, many psychologists were drafted into Army Air Corps programs which were geared towards refining the human factor. However, despite the talent involved in these programs and the tremendous build-up of aviation during the war, there were still aircraft designs that were man killers (no sexism implied since all combat pilots were men). One classic design error that was identified fifty years ago was the multipointer altimeter, which could easily be misread especially by a pilot under considerable task load. It has led to flying fully operational aircraft into the terrain. The authors of the research which formally identified this problem put 'Human Errors' in quotes to express their dissatisfaction with the traditional approach to accident investigation. It traditionally places the burden of guilt on the operator. Some of these altimeters still exist in older aircraft to this day.

Stein, Earl S.↗

High-Frequency, Multiclass Nonintrusive Load Monitoring for Grid-Interactive Residential Buildings

Smart buildings with net-load metering and control capabilities can provide valuable flexibility to grid operators. This article develops a novel approach for high-frequency, multiclass nonintrusive load monitoring (NILM) that enables effective net-load monitoring capabilities with minimal additional equipment and cost. Relative to existing NILM work, the proposed solution operates at a faster timescale, providing accurate multiclass state predictions for each 60-Hz ac cycle without relying on event-detection techniques. The approach is validated using a test bed with residential appliances and shown to have high accuracy, good generalization properties, and sufficient response time to support building grid-interactive control at fast timescales relevant to the provision of grid frequency support services.

24 POWER TRANSMISSION AND DISTRIBUTION↗