Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Doping CdSexTe1-x/CdTe Graded Absorber Films with Arsenic for Thin-Film Photovoltaics

CdTe thin-film photovoltaics have demonstrated some of the lowest costs of electricity generation owing to its low material cost and ease of manufacturing. However, the full potential of polycrystalline CdTe photovoltaics can only be realized if the open-circuit voltage can be increased beyond 1 V Open-circuit voltage ~850-900 mV has been consistently observed for state-of-the-art polycrystalline CdTe solar cells. Open-circuit voltage of over 1V has been demonstrated for single crystal CdTe devices by doping with Group V elements. Therefore, this study is aimed at understanding behavior of polycrystalline CdTe devices with arsenic doping, its activation and process and performance optimization in order to overcome current voltage limitations in CdTe solar cells.

14 SOLAR ENERGY↗

Techno-economic Analysis of the Cryogenic Flux Capacitor Compared to Other forms of Hydrogen Production and Storage

The Cryogenic Flux Capacitor (CFC) is a cold, dense energy storage core that is being studied in the cryo-compressed, about 300 bar and 80K, region of gaseous hydrogen (GH2) storage and liquid hydrogen (LH2) region near the normal boiling point. The hydrogens storage is improved by physically bonding the molecules within the nanoscale pores of the aerogel composite blanket material. The process of bonding or debonding is governed by principles of physical adsorption (physisorption) and thermodynamics. The large surface area afforded by the nanoporous aerogel (~1,000 m2/g) allows its storage performance to easily exceed capacities of high-pressure GH2 storage for an equivalent volume. With the integrated aerogel, subscale tests have shown that storage is increased by about 49% over a simple tank filled with GH2 at the same operating temperature and pressure. For LH2 conditions, the CFC is shown to operate at equivalent densities. For the techno-economic analysis (TEA), the source of hydrogen is compared between onsite steam methane reforming (SMR) and onsite solar photovoltaic (PV) panels providing power to electrolyzers to produce GH2. The TEA compares pure hydrogen burning in a combined cycle gas turbine (CCGT) to hydrogen fuel cells with an overall net power output of 650 MW. The SMR system uses natural gas as an input and includes a carbon capture and storage (CCS) system. The levelized cost of electricity is developed based on the capital cost and operating cost of the systems. Sensitivities are discussed around the cost of natural gas, ranging from 1.93 USD per MMBTU to 6.75 USD per MMBTU, and carbon dioxide disposal, ranging from 7 USD per tonne to 10 USD per tonne. For comparison to the conventional CCGT baseline, a baseload scenario is adopted with 85% capacity factor. The results of the study show that onsite hydrogen generation from SMR is about 1 to 3 USD per kg over the life of the plant and the PV hydrogen production produces at 4 to 5 USD per kg. The cost of storage for CFC is compared to other systems, including high-pressure GH2 and atmospheric LH2. The system is shown to provide the lowest costs for all these options at the grid scale, due to its higher capacity than high-pressure GH2 and ability to operate at 80K, receiving refrigeration from liquid nitrogen systems reducing capital and operating costs when compared LH2 storage systems. SMR is competitive with CCGT at the gas prices, both of which have lower LCOE than the PV system. When accounting for variability in gas prices, the PV and electrolyzer system is less sensitive to these changes and provides the lowest LCOE across the whole range.

08 HYDROGEN↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Electrical load management at the Goldstone DSN Complex

A Power Load Management Plan was deveoped which utilizes the unique power generating capabilities of the stations to reduce the stress on the local utility's reserve capacity and reduce the cost of electrical power at the stations. The plan has greatly reduced the cost of Goldstone electrical power by completely eliminating the use of commercial power during the local utility's high usage periods each day.

Rayburn, J. C.↗

Thermal energy storage heat exchanger: Molten salt heat exchanger design for utility power plants

The use of thermal energy storage (TES) in the latent heat of molten salts as a means of conserving fossil fuels and lowering the cost of electric power was evaluated. Public utility systems provided electric power on demand. This demand is generally maximum during late weekday afternoons, with considerably lower overnight and weekend loads. Typically, the average demand is only 60% to 80% of peak load. As peak load increases, the present practice is to purchase power from other grid facilities or to bring older less efficient fossil-fuel plants on line which increase the cost of electric power. The widespread use of oil-fired boilers, gas turbine and diesel equipment to meet peaking loads depletes our oil-based energy resources. Heat exchangers utilizing molten salts can be used to level the energy consumption curve. The study begins with a demand analysis and the consideration of several existing modern fossil-fuel and nuclear power plants for use as models. Salts are evaluated for thermodynamic, economic, corrosive, and safety characteristics. Heat exchanger concepts are explored and heat exchanger designs are conceived. Finally, the economics of TES conversions in existing plants and new construction is analyzed. The study concluded that TES is feasible in electric power generation. Substantial data are presented for TES design, and reference material for further investigation of techniques is included.

Ferarra, A.↗

The effects of regional insolation differences upon advanced solar thermal electric power plant performance and energy costs

The performance and cost of four 10 MWe advanced solar thermal electric power plants sited in various regions of the continental United States was studied. Each region has different insolation characteristics which result in varying collector field areas, plant performance, capital costs and energy costs. The regional variation in solar plant performance was assessed in relation to the expected rise in the future cost of residential and commercial electricity supplied by conventional utility power systems in the same regions. A discussion of the regional insolation data base is presented along with a description of the solar systems performance and costs. A range for the forecast cost of conventional electricity by region and nationally over the next several decades is given.

Latta, A. F.↗

Integration and Optimization of a Waste Heat Driven Organic Rankine Cycle for Power Generation in Wastewater Treatment Plants

The study focuses on achieving energy self-sufficiency in Wastewater Treatment Plants by proposing a comprehensive model for integrating, sizing, and optimizing an Organic Rankine Cycle system. The Organic Rankine Cycle system is designed to utilize waste heat from the gensets at As Samra Wastewater Treatment Plant in Jordan, where it will contribute to the overall electrical energy supply of the plant. Real data from As Samra Wastewater Treatment Plant is used to model and calculate the available waste heat using TRNSYS® software. The Organic Rankine Cycle model is then developed using ASPEN PLUS® software to explore the impact of operational parameters and determine their optimal values for maximizing the plant's energy profile. An economic analysis is conducted to assess the feasibility of the proposed model, considering system components, installation, operation, and maintenance costs. To optimize the Organic Rankine Cycle system, the study employs the Multi-Output Support Vector Regression technique to capture nonlinear relationships between independent variables (fluid type, turbine inlet pressure, turbine inlet temperature, turbine outlet pressure, and mass flow rate) and dependent variables (pump power input, waste heat input, and turbine specific work). The Osprey optimization algorithm is used to address the multi-objective optimization problem, with the proposed Pareto-based Osprey Optimization Algorithm and the Multi-Objective Particle Swarm Optimization technique being employed to evaluate critical performance and economic parameters such as system thermal efficiency, net power output, and the levelized cost of electricity. The results of the optimization strategies indicate that the M-SVR model's prediction accuracy is significantly improved after parameter optimization, with the model returning high R 2 and low Mean Square Error values of 0.991 and 0.00216, respectively. The Pareto-Based Osprey Optimization Algorithm optimizer identifies the best working fluid as Isobutane/Isopentane in a ratio of 66:34, with optimal turbine inlet pressure and temperature of 15 bars and 218 °C, respectively. In conclusion, the Organic Rankine Cycle model at these optimal conditions achieves a cycle efficiency of 19.93% and an Levelized Cost of Electricity value of 0.0353 USD/kWh.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Timed to save: the added value of accounting for hourly incidence of electricity savings from residential space-conditioning measures

Abstract Previous research has recognized that the value of measures that reduce electricity usage depends upon the timing of the savings generated, but the lack of hourly savings shapes has limited the demonstration of this concept. We develop empirical hourly savings shapes for residential space-conditioning measures from nearly 18,000 efficiency projects in California and show how they combine with the diurnal and seasonal variation in electricity system costs. We find that these measures (cooling replacements; windows, doors, and skylights; and other envelope measures) tend to save electricity when system costs are highest and that the hourly savings account for 1.4–1.5 times as much value as non-time-sensitive estimates of efficiency would predict. We present these impact multipliers for each measure to quantify the additional value revealed by the time-sensitive approach. We show that this additional value is similar in an evolving electricity grid with storage, rather than natural gas generation, as the marginal resource.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wind plant wake losses: Disconnect between turbine actuation and control of plant wakes with engineering wake models

Wake losses from neighboring plants may become a major factor in wind plant design and control as additional plants are constructed in areas with high wind resource availability. Because plant wakes span a large range of physical scales, from turbine rotor diameter to tens of kilometers, it is unclear whether conventional wake models or turbine control strategies are effective at the plant scale. Wake steering and axial induction control are evaluated in the current work as means of reducing the impact of neighboring wind plants on power and levelized cost of electricity. FLOw Redirection and Induction in Steady State (FLORIS) simulations were performed with the Gauss–Curl Hybrid and TurbOPark wake models as well as two operation and maintenance models to investigate control setpoint sensitivity to wake representation and economic factors. Both wake models estimate losses across a range of atmospheric conditions, although the wake loss magnitude is dependent on the wake model. Annual energy production and levelized cost of electricity are driven by wind direction frequency, with frequently aligned plants experiencing the greatest losses. However, both wake steering and axial induction are unable to mitigate the impact of upstream plants. Wake steering is constrained by plant geometry, since wake displacement is much less than the plant wake width, while axial induction requires curtailing the majority of turbines in upstream plants. Individual turbine strategies are limited by their effective scale and model representation. New wake models that include plant-scale physics are needed to facilitate the design of effective plant wake control strategies.

Scott, Ryan (ORCID:0000000328107574)↗

Status and Mission Applicability of NASA's In-Space Propulsion Technology Project

The In-Space Propulsion Technology (ISPT) project develops propulsion technologies that will enable or enhance NASA robotic science missions. Since 2001, the ISPT project developed and delivered products to assist technology infusion and quantify mission applicability and benefits through mission analysis and tools. These in-space propulsion technologies are applicable, and potentially enabling for flagship destinations currently under evaluation, as well as having broad applicability to future Discovery and New Frontiers mission solicitations. This paper provides status of the technology development, near-term mission benefits, applicability, and availability of in-space propulsion technologies in the areas of advanced chemical thrusters, electric propulsion, aerocapture, and systems analysis tools. The current chemical propulsion investment is on the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance for lower cost. Investments in electric propulsion technologies focused on completing NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system, and the High Voltage Hall Accelerator (HiVHAC) thruster, which is a mid-term product specifically designed for a low-cost electric propulsion option. Aerocapture investments developed a family of thermal protections system materials and structures; guidance, navigation, and control models of blunt-body rigid aeroshells; atmospheric models for Earth, Titan, Mars and Venus; and models for aerothermal effects. In 2009 ISPT started the development of propulsion technologies that would enable future sample return missions. The paper describes the ISPT project's future focus on propulsion for sample return missions. The future technology development areas for ISPT is: Planetary Ascent Vehicles (PAV), with a Mars Ascent Vehicle (MAV) being the initial development focus; multi-mission technologies for Earth Entry Vehicles (MMEEV) needed for sample return missions from many different destinations; propulsion for Earth Return Vehicles (ERV), transfer stages to the destination, and Electric Propulsion for sample return and low cost missions; and Systems/Mission Analysis focused on sample return propulsion. The ISPT project is funded by NASA's Science Mission Directorate (SMD).

Anderson, David J.↗

Analytical investigation of thermal barrier coatings for advanced power generation combustion turbines

An analytical evaluation was conducted to determine quantitatively the improvement potential in cycle efficiency and cost of electricity made possible by the introduction of thermal barrier coatings to power generation combustion turbine systems. The thermal barrier system, a metallic bond coat and yttria stabilized zirconia outer layer applied by plasma spray techniques, acts as a heat insulator to provide substantial metal temperature reductions below that of the exposed thermal barrier surface. The study results show the thermal barrier to be a potentially attractive means for improving performance and reducing cost of electricity for the simple, recuperated, and combined cycles evaluated.

Amos, D. J.↗

Impacts of High Variable Renewable Energy Futures on Electric-Sector Decision Making: Demand-Side Effects

Previous work by the Berkeley Lab describes how high shares of variable renewable energy (VRE) such as wind and solar power could change wholesale electricity price dynamics. These include the timing of when electricity is cheap or expensive, locational differences in the cost of electricity, and the degree of regularity or predictability in those costs. Many decentralized decision-makers on the demand-side may not yet have considered the implications of these possible future changes. In this report, we evaluate the sensitivity of a set of demand-side decisions to different levels of VRE penetration ranging from a low of 5-20% to a high of 40-50%. The analysis builds on hourly wholesale energy and capacity prices in different VRE scenarios for four wholesale markets in the United States for the year 2030 (CAISO, ERCOT, NYISO, and SPP). The principal question for this exploration is whether private and public electric-sector decisions that are made based on assumptions reflecting low VRE levels still achieve their intended objective in a high VRE scenario with 40-50% wind and solar? This scoping report evaluates the impacts of changing patterns of peak system needs on the benefits of demand reductions by examining the altered value of different energy efficiency (EE) measures. Similarly, we investigate new opportunities for large energy consumers that may arise from periods with very low wholesale electricity prices. We calculate the value of new process investments (e.g., hydrogen production and other generalized electro-commodities), showcase the varying value of new product storage investments (such as reservoir extensions at a desalination plant), and estimate the benefits of increased process flexibility that uses electricity as a process-input in addition to traditional fossil fuels (e.g., district energy systems). Finally, many decentralized decision-makers and end-use customers are not directly exposed to wholesale electricity prices but instead receive price signals from their retail electricity rates. As wind and solar shares increase, we compare the economic efficiency of flat retail rates relative to more dynamic time-of-use tariffs with and without critical peak-pricing events.

14 SOLAR ENERGY↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Chapter 10 - Economic Considerations for Hydrogen Production with a Focus on Polymer Electrolyte Membrane Electrolysis

This Chapter provides an overview of key economic considerations for hydrogen produced from water electrolysis, with the analyses presented here ranging from high-level summaries to detailed considerations of key market and technological drivers. As the electric power sector evolves to account for increasing shares of renewable energy, opportunities are emerging for technologies capable of storing renewable energy in various forms, including as hydrogen. Opportunities for reducing the cost of hydrogen produced from electrolysis include ensuring access to low-cost wholesale electricity, reducing the capital cost of electrolyzers, and development of systems capable of being dispatchable loads without experiencing significant efficiency penalties throughout lifetime. Our analysis indicates that numerous pathways exist for making hydrogen from electrolysis cost-competitive with hydrogen produced from conventional technologies, and significant opportunities exist for research and development to address performance targets for the future electrolysis systems envisioned here.

cost reduction↗

Potentialities of TEC topping: A simplified view of parametric effects

An examination of the benefits of thermionic-energy-conversion (TEC)-topped power plants and methods of increasing conversion efficiency are discussed. Reductions in the cost of TEC modules yield direct decreases in the cost of electricity (COE) from TEC-topped central station power plants. Simplified COE, overall-efficiency charts presented illustrate this trend. Additional capital-cost diminution results from designing more compact furnaces with considerably increased heat transfer rates allowable and desirable for high temperature TEC and heat pipes. Such improvements can evolve of the protection from hot corrosion and slag as well as the thermal expansion compatibilities offered by silicon-carbide clads on TEC-heating surfaces. Greater efficiencies and far fewer modules are possible with high-temperature, high-power-density TEC: This decreases capital and fuel costs much more and substantially increases electric power outputs for fixed fuel inputs. In addition to more electricity, less pollution, and lower costs, TEC topping used directly in coal-combustion products contributes balance-of-payment gains.

Morris, J. F.↗

The effects of regional insolation differences upon advanced solar thermal electric power plant performance and energy costs

This paper presents the performance and cost of four 10-MWe advanced solar thermal electric power plants sited in various regions of the continental United States. Each region has different insolation characteristics which result in varying collector field areas, plant performance, capital costs, and energy costs. The paraboloidal dish, central receiver, cylindrical parabolic trough, and compound parabolic concentrator (CPC) comprise the advanced concepts studied. This paper contains a discussion of the regional insolation data base, a description of the solar systems' performances and costs, and a presentation of a range for the forecast cost of conventional electricity by region and nationally over the next several decades.

Latta, A. F.↗

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗