Search NASA⌕ Search

SEARCH · Search NASA

Results for “distribution resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Hanford Site Rare Plant Monitoring Report for Calendar Year 2022

Rare plants are monitored on the Hanford Site as distribution and abundance data of current and historic rare plant populations are necessary to make well-informed environmental and ecological resource management decisions. The Central Hanford Rare Plant Management Plan (DOE/RL-2021-35) guides rare plant monitoring methodology in the context of resource management at the Hanford Site. In 2022, a rare plant monitoring effort occurred on the portion of the Hanford Site (referred to herein as Central Hanford) managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL; Figure 1). The goal of this effort was to revisit known occurrences of upland rare plant populations on Central Hanford to improve baseline information on locations of rare plant populations on the Hanford Site. Rare upland plants were thoroughly surveyed in 2021 but unusually low precipitation that year limited germination of many upland annual plants. Surveys in 2022 focused on rare upland annual species after the Hanford Site received higher than average spring precipitation that was expected to increase germination. Rainfall from April 2022 to June 2022 was 76% higher than average; however, these months were also colder than average. Winter rainfall from January 2022 to March 2022 was 84% lower than average. The high spring precipitation in 2022 appears to have triggered the germination of some populations of rare upland annuals but the dry winter and cold spring may have inhibited others. Population stability, viability, and threats were evaluated and will be used to inform future management of rare plant species.

54 ENVIRONMENTAL SCIENCES↗

Collaborative, Rapid Mapping of Water Extents During Hurricane Harvey Using Optical and Radar Satellite Sensors

On August 25, 2017, Hurricane Harvey made landfall between Port Aransas and Port O'Connor, Texas, bringing with it unprecedented amounts of rainfall and record flooding. In times of natural disasters of this nature, emergency responders require timely and accurate information about the hazard in order to assess and plan for disaster response. Due to the extreme flooding impacts associated with Hurricane Harvey, delineations of water extent were crucial to inform resource deployment. Through the USGS's Hazards Data Distribution System, government and commercial vendors were able to acquire and distribute various satellite imagery to analysts to create value-added products that can be used by these emergency responders. Rapid-response water extent maps were created through a collaborative multi-organization and multi-sensor approach. One team of researchers created Synthetic Aperture Radar (SAR) water extent maps using modified Copernicus Sentinel data (2017), processed by ESA. This group used backscatter images, pre-processed by the Alaska Satellite Facility's Hybrid Pluggable Processing Pipeline (HyP3), to identify and apply a threshold to identify water in the image. Quality control was conducted by manually examining the image and correcting for potential errors. Another group of researchers and graduate student volunteers derived water masks from high resolution DigitalGlobe and SPOT images. Through a system of standardized image processing, quality control measures, and communication channels the team provided timely and fairly accurate water extent maps to support a larger NASA Disasters Program response. The optical imagery was processed through a combination of various band thresholds and by using Normalized Difference Water Index (NDWI), Modified Normalized Water Index (MNDWI), Normalized Difference Vegetation Index (NDVI), and cloud masking. Several aspects of the pre-processing and image access were run on internal servers to expedite the provision of images to analysts who could focus on manipulating thresholds and quality control checks for maximum accuracy within the time constraints. The combined results of the radar- and optical-derived value-added products through the coordination of multiple organizations provided timely information for emergency response and recovery efforts.

SERVIR↗

Alternative Ratemaking in the US: A Prerequisite for Grid Modernization or an Unwarranted Shift of Risk to Customers?

With increasing frequency, investor-owned electric utilities are requesting preferred cost recovery for "grid modernization" in multiple forms, from multi-year rate plans to riders. Utilities' claims that massive grid investment is necessary, and that exceptional investment requires exceptional cost recovery, are typically accepted by policymakers with little challenge. It is difficult for policymakers to resist the siren call of grid modernization's perceived outcomes, from improved reliability and resilience to reduced risks to safety and new customer technology adoption (electric vehicles, distributed energy resources, and more). This paper provides a contrarian viewpoint that is virtually absent as policymakers consider alternative ratemaking practices. It introduces the possibility that excess grid investment in the name of modernization is not only possible, and economically harmful, but has already occurred, encouraged by alternative ratemaking. It provides examples of common grid modernization expenditures the authors have identified as cost-ineffective in the course of their work. It also describes traditional grid planning practices with proven ability to address changing requirements over time, calling into question the need for exceptional grid modernization investment plans. Most important, the paper explains the moral hazard inherent in alternative ratemaking, and the fundamental shift in ratemaking risks and responsibilities from utilities to customers that results. The perspectives this paper presents are critical for policymakers to understand before adopting, extending, or expanding alternative ratemaking practices in their respective jurisdictions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Stabilizing the Power System in 2035 and Beyond: Evolving from Grid-Following to Grid-Forming Distributed Inverter Controllers (Final Technical Report)

Under existing grid operations, large synchronous generators provide sufficient rotational inertia to form a rigid backbone for the bulk power system. With photovoltaics (PV) forecasted to provide more than 600 GW of generation by 2050 under the U.S. Department of Energy’s SunShot Initiative objectives, however, it is clear that power electronic inverters will play a dominant role in future systems, and low-inertia stability must be ensured to maintain system reliability. Today, the risks to system stability can be observed on geographically small islands, such as Hawaii, which contain a relatively large amount of installed PV. These risks stem from a fundamental shortcoming of contemporary control strategies—existing inverter controllers cannot guarantee grid stability. Given that future power systems driven by sustainable resources will be characterized by low inertia, locations such as Hawaii provide a glimpse into the obstacles facing future power systems. Considering these challenges, the aim of this project was to develop and demonstrate distributed inverter controllers that enable the reliable control of low-inertia power systems with hundreds of gigawatts of integrated PV.

14 SOLAR ENERGY↗

Explained: Causes of Three Recent Major Blackouts and What Is Being Done in Response

While the power grid is designed to have an adequate supply of electricity generating capacity under hot and cold conditions well above or below average, weather in recent years has approached the bounds of anticipated conditions, in both magnitude and duration. Extreme weather can result in unanticipated levels of electricity demand and correlated power plant outages driven by extreme temperatures. How power system planners account for the changing role of wind and solar also plays an important role in the power grid's ability to supply enough electricity during extreme weather. In response to recent significant outages, power system planners have been focusing on ensuring methods to evaluate reliability during periods of "net peak demand" consider availability of renewable resources and capture the impact of extreme weather on power plants of all types. In particular, there is significant emphasis on the ability of natural gas-fueled power plants to operate during periods of extreme cold temperatures. The impact of extreme weather on the need to change planning processes is demonstrated in this fact sheet that discusses three significant outages that occurred in recent years.

power grid↗

An RTDS-Based Testbed for Investigating the Impacts of Transmission-Level Disturbances on Solar PV Operation

The increasing penetration of renewable energy resources such as solar and wind via power electronic inverters is challenging grid dynamics, as well as grid planning, operation, and protection. Recently, the North American Electric Reliability Corporation (NERC) has reported a series of similar events of the unintended loss of solar generation in Southern California over a large geographic area following the transmission-level disturbances. These events highlight the importance of understanding the characteristics of the transmission-side disturbances propagating into the distribution systems and their impacts on the operation of inverter-based resources. In this paper, a real-time electromagnetic simulation testbed is constructed for real-time electromagnetic simulations to generate realistic transmission-level disturbances and investigate their impacts on the solar PV operation under different fault types and locations, solar penetration levels, and loading levels. Through the simulation analysis and grid strength assessment, it is found that the grid strength at points of integration (POIs) of solar PVs significantly affects the transient stability of solar generators. Particularly, undesirable transient stability events are more likely to occur at the weak POIs following the transmission-level disturbances. Moreover, undesirable transient stability events become severer when the transmission-level disturbance is closer to the weak POIs or the disturbances become more serious. Additionally, the impact of the transmission-level disturbances on the solar PVs at the weak POIs exacerbate with the increasing solar penetration levels and loading levels. Thus, it is important to study and develop new technologies for grid planning, operation, and protection in weak grid conditions to address the emerging issues of integrating the high penetration of solar PVs and other IBRs.

14 SOLAR ENERGY↗

Spatially resolved land and grid model of carbon neutrality in China

China has committed to achieve net carbon neutrality by 2060 to combat global climate change, which will require unprecedented deployment of negative emissions technologies, renewable energies (RE), and complementary infrastructure. At terawatt-scale deployment, land use limitations interact with operational and economic features of power systems. To address this, we developed a spatially resolved resource assessment and power systems planning optimization that models a full year of power system operations, sub-provincial RE siting criteria, and transmission connections. Our modeling results show that wind and solar must be expanded to 2,000 to 3,900 GW each, with one plausible pathway leading to 300 GW/yr combined annual additions in 2046 to 2060, a three-fold increase from today. Over 80% of solar and 55% of wind is constructed within 100 km of major load centers when accounting for current policies regarding land use. Large-scale low-carbon systems must balance key trade-offs in land use, RE resource quality, grid integration, and costs. Under more restrictive RE siting policies, at least 740 GW of distributed solar would become economically feasible in regions with high demand, where utility-scale deployment is limited by competition with agricultural land. Effective planning and policy formulation are necessary to achieve China’s climate goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Two-Stage Approach for PV Inverter Engagement in Power Factor Correction and Voltage Regulation

The rapid integration of distributed energy resources, like solar photovoltaics (PVs), can lead to overvolt-age challenges due to reverse power flow and a noticeable decrease in power factor at the substation interface. While existing literature extensively explores utilizing smart inverter capabilities for reactive power flexibility using a volt-var curve (VVC), obtaining time-varying operating points of such curves in real-time is challenging due to computational demands and communication requirements. Similarly, employing optimization-based approaches for reactive power control and active voltage regulation in large-scale distribution feeders is difficult due to the complexity of the problem and the challenges in effectively engaging customer-owned resources. This paper proposes a two-stage strategy to harness smart inverters for reactive power support. The first stage formulates short-term planning by optimally designing VVCs (on a daily or hourly basis) for large-scale solar PVs based on projected system needs and communicating optimal curves to smart inverters in advance. Subsequently, the second stage employs a transactive-based method to involve customer-owned PVs for reactive power support, effectively enhancing overall system performance and addressing real-time demands. In conclusion, the efficacy of this approach will be demonstrated using real-world distribution circuits provided by Vermont Electric Power Company (VELCO) and Vermont Electric Cooperative (VEC).

Poudel, Shiva [Pacific Northwest National Laborato↗

GMLC Technical Assistance to States: DER Interconnection Workshop #2 [Slides]

NREL hosted this workshops to help state public utility commissions (PUCs) understand the materials and support available to assist in distributed energy resource (DER) interconnection activities. This workshop focused on "Modern DER Capabilities and Deployment Concerns" and included four speakers, whose material will be posted at https://www.nrel.gov/grid/ieee-standard-1547/workshops.html. The slides in this deck were for the facilitator to provide context to the attendees, as well as additional resources on the topics discussed.

1547↗

Modeling U.S. Light-Duty Demand for EV Charging Infrastructure in 2030

With the support of DOE's Vehicle Technologies Office and the DOE/DOT Joint Office (JO), NREL has applied the EVI-X modeling suite to conduct a National Electric Vehicle Infrastructure Needs Assessment. This report considers a 2030 scenario in which 50% of light-duty sales are electric (including plug-in hybrids), resulting in an on-road stock of 33 million vehicles. We consider the needs of vehicles used for typical daily driving, drivers without access to residential charging, corridor charging supporting long-distance travel, and ride-hailing electrification. We find that a cumulative capital investment of $82 billion in public and private charging infrastructure will be necessary in our baseline scenario (approximately 3x greater than our estimate of planned investments to date). This result is framed as a conservative estimate as the assumed costs include charging equipment and installation but exclude the cost of grid upgrades and distributed energy resources.

33 ADVANCED PROPULSION SYSTEMS↗

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ICE Calculator 2: Final Report for Phase 1 and 2 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

ICE 2.0 Phase 2 Final Report In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE Calculator 2 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE Calculator 2 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 and 2 of the ICE Calculator 2 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 2 was sponsored by six utilities: Empire District Electric Company, Evergy Missouri, Pacific Gas & Electric, San Diego Gas & Electric, Southern California Edison, and Union Electric. Phase 1 and 2 involved 15 customer interruption cost survey activities representing a total of 30 electricity distribution service territories. ICE Calculator Version 2.0 and 2.2 Comparison This memorandum describes–at a high-level–the improvements in interruption cost estimates for the version 2.2 of the ICE Calculator (released February 2026) compared to version 2.0 (released in April 2025). Version 2.2 of the ICE Calculator corresponds to Phase 2 of the initiative, while version 2.0 corresponds to Phase 1. The improvements in version 2.2 result from both a significant increase in the number of customer responses that have been collected and the identification of seven additional factors that help estimate customer interruption costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Multi-Fidelity Model and Co-Simulation Platform for Distribution System Transient and Dynamic Analysis—DistribuDyn

As inverter-based, distributed energy resources (DERs) and variable loads continue to proliferate across distribution systems, it is increasingly important to understand their impacts on system stability and reliability. However, most commercially available simulation tools for distribution planning primarily focus on steady-state and quasi-steady state analysis, offering limited capabilities to study transient and dynamic behaviors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A task control architecture for autonomous robots

An architecture is presented for controlling robots that have multiple tasks, operate in dynamic domains, and require a fair degree of autonomy. The architecture is built on several layers of functionality, including a distributed communication layer, a behavior layer for querying sensors, expanding goals, and executing commands, and a task level for managing the temporal aspects of planning and achieving goals, coordinating tasks, allocating resources, monitoring, and recovering from errors. Application to a legged planetary rover and an indoor mobile manipulator is described.

Simmons, Reid↗

Distributed Wind and Impacts of FERC Order No. 2222 Implementation

In September of 2020, FERC issued Order No. 2222, directing ISOs to adjust their long-standing tariffs and participation models to enable the operation of distributed energy resource (DER) aggregators in wholesale energy markets. The rule sought to bring wholesale markets under its jurisdiction up to speed with existing expansion of DERs across the United States and to capture the potential benefits that these technologies can provide. This report describes the implementation of FERC Order No. 2222 and the compliance plans that have been submitted so far, attempt to understand the potential impact the rule may have on distributed wind, and provide opportunities for future work to analyze and encourage deployment under these policy conditions. There is an information gap for the type of market interactions distributed wind may have or how it could be best deployed in DER aggregations under future market conditions. There is significant potential for profitable deployment of distributed wind in states that are served by ISOs and covered under Order No. 2222. Distributed wind and other DERs provide local energy that does not need to travel those distances and avoids the losses typically associated with long-distance energy transmission. Deployment of distributed wind can benefit communities that exist away from large load centers by providing local, clean, and affordable energy. Aggregating DERs that include distributed wind could provide these benefits across multiple far-ranging communities if they have access to participate in wholesale markets. A new baseline valuation of distributed wind in areas covered by Order No. 2222 is required to accurately gauge where it is profitable and how it can compete or complement existing or future DER deployment, including as part of an aggregate.

17 WIND ENERGY↗

Performance Metrics to Evaluate Utility Resilience Investments

In 2019, Sandia National Laboratories (Sandia) contracted Synapse Energy Economics (Synapse) to research the integration of community and electric grid resilience investment planning as part of the Designing Resilient Communities (DRC): A Consequence-Based Approach for Grid Investment project. Synapse produced a series of reports to explore the challenges and opportunities in several key areas, including benefit-cost analysis (BCA), performance metrics, microgrids, and regulatory mechanisms. This report focuses on BCA. BCA is an approach that electric utilities, electric utility regulators, and communities can use to evaluate the costs and benefits of a wide range of grid resilience investments in a comprehensive and consistent way. While BCA is regularly applied to some types of grid investments, application of BCA to grid resilience investments is in the early stages of development. Though resilience is increasingly cited in connection with grid investment proposals and plans, the resilience- related costs and benefits of grid resilience investments are typically not fully identified, infrequently quantified, and almost never monetized. Without complete assessments of costs and benefits, regulators can be hesitant to approve some types of grid resilience investments. This report provides the first application of the framework developed in the 2020 National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources (NSPM for DERs) to grid resilience investments. We provide guidance on next steps for implementation to enable grid resilience investments to receive due consideration. We suggest developing BCA principles and standards for jurisdiction-specific BCA tests. We also recommend identifying the resilience impacts of the investments and quantification of these impacts by establishing utility performance metrics for resilience. Proactive integration of grid resilience investments into existing regulatory processes and practices can increase the capacity of jurisdictions to respond to and recover from the consequences of extreme events. 1 National Energy Screening Project. 2020. National Standard Practice Manual for Benefit-Cost Analysis of Distributed Energy Resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Resilience Metrics Augmentation for Critical Load Prioritization

One of the major goals of new grid operation regimes, such as transactive energy systems (TESs), is to make the power grid more resilient to withstand natural or man-made disasters and potential reliability events, and to continue to serve the maximum number of its customers. But it is a well-known fact to system operators that not all customers are the same. This implies that any discussion of TESs’ impacts on the resilience of the power system should consider the needs of its critical customers (such as the power system operation centers, fire and police stations, and hospitals) over those of other customers. When evaluating the resilience of the system, bonus points must be awarded to any system that could maintain its power supply to critical customers during a disturbance that may cause an outage. This report discusses critical infrastructure (CI) as found in the literature and then categorizes it based on the field to which the operations belong (such as human life/safety-related, operations management, necessary city operation, industrial customers, etc.). Each of these CI categories is further divided into types of critical customers (e.g., the human life/safety-related category has different types of customers like hospitals, fire and police stations, etc.). The entire demand of each of the critical customer types is not categorized as critical load (CL); instead, only a portion of the total load of these critical customers is characterized as critical load. This is done based on the categories of equipment, the function of which is crucial in the operation of the overall facility. CL categorization is performed to provide the ratio of the critical load portion to the overall load , so that it can serve as a parameter in the resilience evaluation of the grid through a metrics-based approach. Such categorization is important as it helps to augment the existing quantifiable resilience metrics with CL categorization. The metrics for a power system need to not only consider how well a system performed during a disturbance event, but also how it reduced strain and supplied power to its CLs. The first step in this process is characterize CLs in the system. After CL characterization, the next step is the inclusion of these loads in the resilience metrics. To that end, in this report weight-based augmentation of resilience metrics is proposed, where certain customers (the ones that are categorized as critical) are assigned higher weights than others. Though an overview of assigning weights to customers is discussed, there is no one-size-fits-all approach for every power system. The decisions made about assigning such weights to customers vary greatly from one operator to another, based on their unique systems and the current and predicted states of critical customers. This decision-making can include the type of disturbance event, which might only affect certain parts of the system. In general, analyzing critical customers before an event helps understand system vulnerabilities. It also helps in planning and conducting operations during the event, evaluating system performance after the event, and supporting better planning for future events. An alternative to the current practices of managing the grid for outages is an innovative TES, which has the potential to provide a platform for including distributed energy resources for managing CLs. This report also describes how TES qualities can help (1) to maintain power supply to critical customers for uninterrupted operations and (2) to restore lost power supply to the critical customers rapidly.

24 POWER TRANSMISSION AND DISTRIBUTION↗