Search NASA⌕ Search

SEARCH · Search NASA

Results for “human error”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Damage Pseudo Cross Section Generator

This software is a python script for generating group damage pseudo-cross-sections for specific elements, and tabulating them in forms useful to python or to office-open workbooks (xlsx). The damage pseudo-cross-section is needed for calculating how much neutron radiation damage a structural material receives in a reactor measured in displacements per atom (DPA). The process of generating these pseudo-cross-sections is laborious as it requires running the nuclear data processing code, NJOY, for hundreds of isotopes, and then post-processing the data. This also allows many opportunities for human error to be involved. This script eliminates these problems by fully automating the process.

Gale, MicahD.↗

Machine learning framework for assessment of microbial factory performance

Metabolic models can estimate intrinsic product yields for microbial factories, but such frameworks struggle to predict cell performance (including product titer or rate) under suboptimal metabolism and complex bioprocess conditions. On the other hand, machine learning, complementary to metabolic modeling necessitates large amounts of data. Building such a database for metabolic engineering designs requires significant manpower and is prone to human errors and bias. We propose an approach to integrate data-driven methods with genome scale metabolic model for assessment of microbial bio-production (yield, titer and rate). Using engineered E. coli as an example, we manually extracted and curated a data set comprising about 1200 experimentally realized cell factories from ~100 papers. We furthermore augmented the key design features (e.g., genetic modifications and bioprocess variables) extracted from literature with additional features derived from running the genome-scale metabolic model iML1515 simulations with constraints that match the experimental data. Then, data augmentation and ensemble learning (e.g., support vector machines, gradient boosted trees, and neural networks in a stacked regressor model) are employed to alleviate the challenges of sparse, non-standardized, and incomplete data sets, while multiple correspondence analysis/principal component analysis are used to rank influential factors on bio-production. The hybrid framework demonstrates a reasonably high cross-validation accuracy for prediction of E.coli factory performance metrics under presumed bioprocess and pathway conditions (Pearson correlation coefficients between 0.8 and 0.93 on new data not seen by the model).

59 BASIC BIOLOGICAL SCIENCES↗

FEDERATED LEARNING ON STOCHASTIC NEURAL NETWORKS

Federated learning is a machine learning paradigm that leverages edge computing on client devices to optimize models while maintaining user privacy by ensuring that local data remain on the device. However, since all data are collected by clients, federated learning is susceptible to latent noise in local datasets. Factors such as limited measurement capabilities or human errors may introduce inaccuracies in client data. To address this challenge, we propose the use of a stochastic neural network as the local model within the federated learning framework. Stochastic neural networks not only facilitate the estimation of the true underlying states of the data but also enable the quantification of latent noise. We refer to our federated learning approach, which incorporates stochastic neural networks as local models, as federated stochastic neural networks. In this work we will present numerical experiments demonstrating the performance and effectiveness of our method, particularly in handling nonindependent and identically distributed data.

97 MATHEMATICS AND COMPUTING↗

Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage managers are concerned with schedule and cost, union workers are concerned with performing work that is commensurate with their trade, and support functions (safety, quality assurance, and radiological controls, etc.) are concerned with performing the work within the plants controls and procedures. Approaches to outage management should be designed to increase the active participation of work groups and managers in making decisions that closed the gap between competing objectives and the potential for error and process inefficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of Computer-Based Procedure System Prototype

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE), performed in close collaboration with industry R&D programs, to provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The introduction of advanced technology in existing nuclear power plants may help to manage the effects of aging systems, structures, and components. In addition, the incorporation of advanced technology in the existing LWR fleet may entice the future workforce, who will be familiar with advanced technology, to work for these utilities rather than more newly built nuclear power plants. Advantages are being sought by developing and deploying technologies that will increase safety and efficiency. One significant opportunity for existing plants to increase efficiency is to phase out the paper-based procedures (PBPs) currently used at most nuclear power plants and replace them, where feasible, with computer-based procedures (CBPs). PBPs have ensured safe operation of plants for decades, but limitations in paper-based systems do not allow them to reach the full potential for procedures to prevent human errors. The environment in a nuclear power plant is constantly changing depending on current plant status and operating mode. PBPs, which are static by nature, are being applied to a constantly changing context. This constraint often results in PBPs that are written in a manner that is intended to cover many potential operating scenarios. Hence, the procedure layout forces the operator to search through a large amount of irrelevant information to locate the pieces of information relevant for the task and situation at hand, which has potential consequences of taking up valuable time when operators must be responding to the situation, and potentially leading operators down an incorrect response path. Other challenges related to PBPs are the management of multiple procedures, place-keeping, finding the correct procedure for the task at hand, and relying on other sources of additional information to ensure a functional and accurate understanding of the current plant status (Converse, 1995; Fink, Killian, Hanes, & Naser, 2009; Le Blanc & Oxstrand, 2012). The main focus of this report is to describe the research activities conducted to address the remaining two objectives; Develop a prototype CBP system based on requirements identified and Evaluate the CBP prototype. The emphasis will be on the evaluation of an initial CBP prototype in at a Nuclear Power Plant.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Automation of The Guiding Center Expansion

We report on the use of the recently-developed Mathematica package VEST (Vector Einstein Summation Tools) to automatically derive the guiding center transformation. Our Mathematica code employs a recursive procedure to derive the transformation order-by-order. This procedure has several novel features. (1) It is designed to allow the user to easily explore the guiding center transformation’s numerous nonunique forms or representations. (2) The procedure proceeds entirely in cartesian position and velocity coordinates, thereby producing manifestly gyrogauge invariant results; the commonly-used perpendicular unit vector fields e 1 , e 2 are never even introduced. (3) It is easy to apply in the derivation of higher-order contributions to the guiding center transformation without fear of human error. Our code therefore stands as a useful tool for exploring subtle issues related to the physics of toroidal momentum conservation in tokamaks.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

An online application to measue the dispersion function in AGS

The measurement of the AGS dispersion function is one of the requirements for the development of an accurate online model of the AGS. Currently the zgoubi and the MADX online models of the AGS are employed as online models to set up and view the beam optics of the AGS using the model viewer. In this technical note we describe the method we employ to measure the numerical values of the dispersion function of the AGS at the location of the Beam Position Monitors (BPM’s) and we explain in detail the automatic process to measure experimentally the dispersion function of AGS at the location of the BPM’s. This automatic method of measuring the dispersion of the AGS not only reduces dramatically the time required to collect and analyze the experimental data to calculate the dispersion of the AGS, but also minimizes the possible human error that may occur in the process of the dispersion measurement.

43 PARTICLE ACCELERATORS↗

Computer-Based Procedures for Field Workers - Identified Benefits

The Idaho National Laboratory (INL) computer-based procedure (CBP) research team is exploring how best to design a CBP system that will deliver the intended benefits of increased efficiency and improved human performance. It is important to note that no “off-the-shelf” technology exists for the type of CBP system that is investigated and developed by the INL researchers. As more technology is integrated into the procedure process the importance of an appropriate and methodological approach to the design of the procedure system increases. Technological advancements offer great opportunities for efficiency and safety gains, however if the system is not designed correctly there is a large risk of unintentionally introducing new opportunities for human errors. The INL research team is breaking new ground in the area of CBPs with the prototype they have developed. Current electronic procedure systems are most commonly electronic versions of the paper-based procedures with hyperlinks to other procedures, limited user input functionality, and the ability to mark steps completed. These systems do not fully exploit the advantages digital technology. It is a part of the INL researchers’ role to develop and validate new CBP technologies that greatly increase the benefits of a CBP system to the nuclear industry.

47 OTHER INSTRUMENTATION↗

Light Water Reactor Sustainability Program: Digital Architecture Project Plan

There are many technologies available to the nuclear power industry to improve efficiency in plant work activities. These range from new control room technologies to those for mobile field workers. They can make a positive impact on a wide range of performance objectives – increase in productivity, human error reduction, validation of results, accurate transfer of data, and elimination of repetitive tasks. It is expected that the industry will more and more turn to these technologies to achieve these operational efficiencies to lower costs. At the same time, this will help utilities manage a looming staffing problem as the inevitable retirement wave of the more seasoned workers affects both staffing levels and knowledge retention. A barrier to this wide-scale implementation of new technologies for operational efficiency is the lack of a comprehensive digital architecture that can support the real-time information exchanges needed to achieve the desired operational efficiencies. This project will define an advanced digital architecture that will accommodate the entire range of system, process, and plant worker activity to enable the highest degree of integration, thereby creating maximum efficiency and productivity. This pilot project will consider a range of open standards that are suitable for the various data and communication requirements of a seamless digital environment. It will map these standards into an overall architecture to support the II&C developments of this research program.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Safety Case for Service Contracts

Safety cases developed for the Facilities Management and Operations Center (FMOC) are based on the requirements in MN471021, Work Planning and Control Criteria for Safe Design and Operations. The FMOC performs maintenance activities in various locations at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM consists of more than 6,000,000 square feet of buildings, structures, and site infrastructure on approximately 13,000 acres of land. The FMOC performs approximately 7500 service contract work orders a year to assist with operations and maintenance at the SNL/NM site and facilities. As part of the continual improvement process, this Safety Case will be reviewed and updated, as needed, or at a minimum every three years. People tend to underestimate the probability of an accident if none have occurred previously or if the person performing the work is skilled, and they tend to trust each other’s competence. Human error within systems must be identified and considered. The FMOC uses failure mode analysis (FMA) to determine how a system might fail and cause accidents, as well as the amount and types of controls needed. The FMOC includes interconnected elements, such as people, environment, procedures, facilities, equipment, and the hazards identified in the work analysis. A daily pre-task plan is required prior to any work activity. Changes in work practices will be communicated clearly to all service contractors and personnel by way of contractor pre-task planning, activity-specific plans, contract amendments, and/or training. The FMOC has created a safe-by-design intent approach for service contract execution starting at the planning stage and extending through the execution phase. The Safety Program (see Figure 2) summarizes how the FMOC connects work analysis elements with service contracts.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Solar Asset Management Software (Final Report)

Ra Power Management (RPM) has developed a cloud based software platform that manages the financial and operational functions of third party financed solar projects throughout their lifecycle. RPM’s software streamlines and automates the sales, financing, and management of a portfolio of solar assets. The software helps solar developers automate the most difficult aspects of asset management, leading to increased transparency, efficiency, and reduction in human error. More importantly, our platform will help developers save money by improving their operating margins

14 SOLAR ENERGY↗

Final Report Ra Power Management 1255 10-15-16 FINAL_Public

Ra Power Management (RPM) has developed a cloud based software platform that manages the financial and operational functions of third party financed solar projects throughout their lifecycle. RPM’s software streamlines and automates the sales, financing, and management of a portfolio of solar assets. The software helps solar developers automate the most difficult aspects of asset management, leading to increased transparency, efficiency, and reduction in human error. More importantly, our platform will help developers save money by improving their operating margins

14 SOLAR ENERGY↗

Solar Asset Management Software

Ra Power Management (RPM) has developed a cloud based software platform that manages the financial and operational functions of third party financed solar projects throughout their lifecycle. RPM’s software streamlines and automates the sales, financing, and management of a portfolio of solar assets. The software helps solar developers automate the most difficult aspects of asset management, leading to increased transparency, efficiency, and reduction in human error. More importantly, our platform will help developers save money by improving their operating margins.

14 SOLAR ENERGY↗

Automated Work Package: Conceptual Design and Data Architecture

The automated work package (AWP) is one of the U.S. Department of Energy’s (DOE) Light Water Reactor Sustainability Program efforts to enhance the safety and economics of the nuclear power industry. An AWP is an adaptive and interactive work package that intelligently drives the work process according to the plant condition, resources status, and users progress. The AWP aims to automate several manual tasks of the work process to enhance human performance and reduce human errors. Electronic work packages (eWPs), studied by the Electric Power Research Institute (EPRI), are work packages that rely to various extent on electronic data processing and presentation. AWPs are the future of eWPs. They are envisioned to incorporate the advanced technologies of the future, and thus address the unresolved deficiencies associated with the eWPs in a nuclear power plant. In order to define the AWP, it is necessary to develop an ideal envisioned scenario of the future work process without any current technology restriction. The approach followed to develop this scenario is specific to every stage of the work process execution. The scenario development resulted in fifty advanced functionalities that can be part of the AWP. To rank the importance of these functionalities, a survey was conducted involving several U.S. nuclear utilities. The survey aimed at determining the current need of the nuclear industry with respect to the current work process, i.e. what the industry is satisfied with, and where the industry envisions potential for improvement. The survey evaluated the most promising functionalities resulting from the scenario development. The results demonstrated a significant desire to adopt the majority of these functionalities. The results of the survey are expected to drive the Idaho National Laboratory (INL) AWP research and development (R&D). In order to facilitate this mission, a prototype AWP is needed. Since the vast majority of earlier efforts focused on the frontend aspects of the AWP, the backend data architecture was researched and developed in this effort. The backend design involved data architecture aspects. It was realized through this effort that the key aspects of this design are hierarchy, data configuration and live information, data templates and instances, the flow of work package execution, the introduction of properties, and the means to interface the backend to the frontend. After the backend design was developed, a data structure was built to reflect the developed data architecture. The data structure was developed to accommodate the fifty functionalities identified by the envisioned scenario development. The data structure was evaluated by incorporating an example work order from the nuclear power industry. The implementation resulted in several optimization iterations of the data structure. In addition, the rearrangement of the work order information to fit the data structure highlighted several possibilities for improvement in the current work order design, and significantly reduced the size of the work order.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Analysis of Loss-of-Offsite-Power Events 1997-2015

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2015. LOOP events during critical operation that do not result in a reactor trip, are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. Emergency diesel generator reliability is also considered (failure to start, failure to load and run, and failure to run more than 1 hour). There is an adverse trend in LOOP durations. The previously reported adverse trend in LOOP frequency was not statistically significant for 2006-2015. Grid-related LOOPs happen predominantly in the summer. Switchyard-centered LOOPs happen predominantly in winter and spring. Plant-centered and weather-related LOOPs do not show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1986 -1996 time period.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced SAPHIRE 8 Modeling Methods for Probabilistic Risk Assessment via the Systems Analysis Program for Hands-On Integrated Reliability Evaluations (SAPHIRE) Software P-202

1.1. Overview of the Advanced SAPHIRE Material The Advanced SAPHIRE course material is intended to both (1) provide guidance for learning advanced SAPHIRE features during the class and (2) become a stand-alone reference document after finishing the class. Thus, the format for the class material is a combination of the traditional “overhead-type” of presentation information with a structured, reference-type document. Major topics that are covered in the Advanced SAPHIRE class include: Advanced data base concepts such as Model Type (e.g., random, seismic, fire, flood). Definition of house events and how they are used on a sequence-by-sequence basis to manipulate individual fault tree logic using sequence flag sets or fault tree flag sets. ? Basic event templates, compound basic event equation editors, and human error worksheets. A rule-based event tree top event substitution feature (called the Link Event Tree Rule Editor) which allows for top event substitutions. A rule-based cut set post-processing feature (called the Recovery Rules) which allows cut set manipulation. Cut set analysis based upon rule-based end state categories (called End State Analysis). Cut set generation options for both fault trees and event tree sequences. The large event tree methodology and how SAPHIRE can be used to generate sequence cut sets for this method. The transfer of data between SAPHIRE data bases and between other PRA codes (MAR-D).

97 MATHEMATICS AND COMPUTING↗

Analysis of Loss-of-Offsite-Power Events: 1987-2016

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2016. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. Emergency diesel generator reliability is also considered (failure to start, failure to load and run, and failure to run more than 1 hour). An adverse trend in overall LOOP frequency is identified. An adverse trend in LOOP durations is identified. Plant-centered and weather-related LOOP events do not show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1986–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technologies for Detecting Interactions between Current Plant Configuration States and Component Manipulations Directed by In-Use Procedures

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and extension of their current operating licenses. A new area of LWRS research, Outage Risk Management Improvement (ORMI) seeks to improve the management of nuclear power plant outages through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and equipment out of service would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify the incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.

99 GENERAL AND MISCELLANEOUS↗