Software Dependability for Digital Instrumentation and Control Systems in Nuclear Power Plants - Lessons Learnt from a DOE Sponsored Project

This paper discusses the lessons learnt from a sponsored study undertaken under the sponsorship of the Department of Energy by a team of scientists at the Ohio State University in collaboration with Technology Resources and experts around the world. This paper makes recommendations for future research and studies based on these lessons learnt. The purpose of the research was to provide a software dependability quantification framework that would allow its evaluation along the software development life cycle for safety critical instrumentation and control systems (I and C) such as those found in nuclear power plants. A typical example of safety critical system is the reactor protection system. The research funded by the Department of Energy built on preliminary research carried out for the US NRC that had focused solely on software reliability quantification. Quantification of software dependability is important for safety critical I and C because the regulatory framework in use in the United States for nuclear power plants is risk informed. Quantification of risk requires quantification of all contributors to risk and those include instrumentation and control systems. The purpose of the study was to help developers of software-based I and C with an early evaluation of the potential risk an application would represent at different stages of the software development life cycle by building gates at the end of each life cycle phase. Life cycle phases of software development comprehend phases such as requirements, design, coding and test. The gates' function would be to stop development from moving forward if the assessed dependability objective for that phase were not met. Gates thresholds were to be defined based on measurements collected during the life cycle phase under evaluation and phases that preceded it and an understanding of the mechanisms that would lead to threatening the dependability objectives. The information contained in the gates would in addition help steer the development towards areas that needed improvement. The following are four high level conclusions to our study. First the study demonstrates a lack of consensus on mechanisms that will threaten the dependability attributes. This lack of consensus should be resolved. The lack of consensus appears for all measures to the exception of reliability. Second, measures should be developed for software availability and safety. Third, for all dependability attributes (with the exception of reliability) consistency of the measurement threads should evaluated and measurement-based development gates derived. Finally our ability to perform such type of research depends in a significant manner on access to vendor and/or utility data. The licensing environment and the first-of-a-kind nature of current software-based applications for nuclear I and C make it difficult to collect the relevant data. An approach which would either increase access to data by providing 'immunity' to the vendor or utility or the development of a software-based I and C for the sole purpose of data collection for research should be investigated. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Lessons Learned from Most Recent Chemical Decontamination for Decommissioning Projects - 19280

In 2017, Westinghouse performed a full system chemical decontamination of Units 1 and 2 of the Bohunice V1 Nuclear Power Plant. Bohunice V1 is a VVER 440 design with six loops. The application was performed two loops at a time, with the reactor core bypassed. The Pressurizer and Pressurizer Relief Tank (Bubble Tank) were decontaminated as well, in a separate application. This was a recovery decontamination that had been attempted by another company prior to Westinghouse. Several modifications to equipment and design of process were required to make the decontamination successful. The project was initiated to perform pre-dismantling chemical decontamination of primary circuits of both V1 units using Decontamination for Decommissioning (DfD) to meet the following objectives (see References 1 and 2 for process descriptions of DfD): - Remove activity from the primary circuit components; - Reduce dose rates around piping and components; - Simplify access to the installations, making it possible to use hands-on techniques for dismantling, rather than the more expensive use of robotics or manipulators; - Minimize the potential for spreading contamination during decommissioning activities - Reduce the activity of components that they may be disposed of at a lower classification, therefore more economical, waste disposal category. Several techniques were employed that were unique, or first of a kind, to aid in the decontamination, including resin regeneration and bypass of the reactor core, while still providing enough flow to to allow sufficient dispersal through all the steam generator tubes. Equipment that was already available on site was evaluated and, when possible, combined with Westinghouse equipment to minimize application cost and schedule. The lessons learned from the first unit (Unit 2) were applied to the second unit (Unit 1) application. The partial relocation of equipment allowed for the most efficient schedule to complete the second decontamination. The paper will describe in more detail the results and lessons learned from the full system chemical decontaminations performed, as well as updates on another recent decontamination project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Operational and Safety Lessons Learned from the 2014 Fire and Radiological Events - 19389

The Waste Isolation Pilot Plant (WIPP) experienced two accident events in 2014 within 9 days of each other (salt haul truck fire and a radiological release). The repository was designed in the 1980's for high level waste and started operations in late 1990's for defense related transuranic (TRU) waste. Several long-standing technical issues from competing requirements between an underground facility (mine), nuclear safety, and environmental requirements lead to design, operations, and safety weaknesses that were not resolved prior to the two accident events. Other design issues and actions during early recovery efforts were identified as lessons learned for the Safety Significant Confinement Ventilation System (SSCVS) and Utility Shaft (US) capital asset projects and for future planning efforts. The infrastructure at WIPP was significantly degraded at the time of the events with key safety related items that had been out of service or not maintained for years. The emergency response to the two accident events was less than adequate and caused concerns with stakeholders. There are many operational and safety lessons learned from these two events and their corrective actions that will be valuable for all future planning of deep geological repositories (DGR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 84: Challenges and Lessons Learned in Radioactive Waste Packaging, Transportation, and Disposal

This panel focused on challenges and lessons learned in radioactive waste packaging, transportation, compliance and disposal. Participants provided their perspectives and suggestions on how to increase efficiencies through eliminating inconsistencies between specifications and other requirements to provide products at a reasonable cost and enhance communication to enable better service. Presentations proposed include: 1 - Low Level Waste Type (B) Cask Shipment Challenges (Aleksandr Gelfond, EnergySolutions (USA)); 2 - Radioactive Packaging Challenges (Jeff England, NAC International (USA)); 3 - Challenges and Lessons Learned in Radwaste Packaging, Transportation, Compliance and Receipt (Mary Magleby, URS - CH2M Oak Ridge LLC (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from More than Three Decades of Decommissioning and RAW Management in Slovakia - 20074

The purpose of this paper is to describe utilization of experience of JAVYS Company acquired while acting as the Slovak national decommissioning and radioactive waste management entity. JAVYS manages both the decommissioning of A1 NPP (shut down after series of accidents) and V1 NPP (shut down after standard operation) and related radioactive waste management. Besides JAVYS is responsible for management of institutional radioactive waste in Slovakia. The paper is focusing on selected successfully completed projects and related lessons learned from development of special procedures and implementation of activities within decommissioning and management of generated waste streams from cradle to grave. Recently, experience and lessons learned from all aforementioned activities are used internationally to provide assistance to other countries in order to overcome difficulties and to successfully implement various projects dealing with decommissioning and radioactive waste management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 79: Challenges and Lessons Learned in Radwaste Packaging, Transportation, Compliance, and Receipt

This panel focused on challenges and lessons learned in radioactive waste packaging, transportation, compliance, and receipt for fabricators of radioactive waste packaging. World-wide companies are urged to participate. Participants provided their perspectives and suggestions on how to increase efficiencies through eliminating inconsistencies between specifications and other requirements to provide products at a reasonable cost and enhance communication to enable better service. Panelists with presentations: PACTEC (Bill Smart); Waste Packaging Strategy and Challenges at Whiteshell (Miles Smith); Challenges and Lessons Learned in Radwaste Packaging, Transportation, Compliance and Receipt (Dan Payne)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons learned from the commissioning of the THTR 300 - 18575

Although the commissioning of the THTR 300, the only large pebble bed High Temperature Gas-Cooled Reactor (HTGR) power plant, occurred more than 30 years ago, many lessons could be learned that would directly benefit the design, construction and startup of future pebble bed HTGRs. This report includes a review of the THTR 300 design and an overview of the commissioning program utilized to bring the plant from initial criticality to full power. Selected plant test results are compared to predicted plant behavior from 40% to 100% plant load. Lessons learned from the commissioning of the THTR are also included. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Challenges and Lessons Learned from an Analysis of Three Zero Energy Buildings

Zero energy buildings, or zero energy ready buildings, which are designed and operated by public or private commercial property owners can play an important role in reducing carbon emissions. This paper discusses lessons learned and key takeaways from an in-depth analysis of three zero energy buildings that took an integrated design and construction approach to significantly reduce energy use. Two of these projects are new construction and one is a retrofit to zero energy. Findings are based on project literature review, data analysis, and in-depth interviews with the building design teams and staff who were involved during the design, construction, and operation of the buildings. The paper addresses value proposition and cost data in such a way that other building owners can replicate the strategies and technology solutions in response to regulatory mandates or organizational goals. It also provides details on operational improvements taken at each zero energy building to enhance energy performance and increase the potential for load flexibility, and discusses challenges and lessons gleaned from design teams and building staff. The findings serve as a reference for building owners, designers, engineers, contractors, or others interested in, or involved with, the design, construction, or use of new or existing buildings. The paper also includes recommended pathways for widespread adoption of zero energy strategies that can be applied in various locations.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Very Large System Dynamics Models - Lessons Learned

This paper provides lessons learned from developing several large system dynamics (SD) models. System dynamics modeling practice emphasize the need to keep models small so that they are manageable and understandable. This practice is generally reasonable and prudent; however, there are times that large SD models are necessary. This paper outlines two large SD projects that were done at two Department of Energy National Laboratories, the Idaho National Laboratory and Sandia National Laboratories. This paper summarizes the models and then discusses some of the valuable lessons learned during these two modeling efforts.

99 GENERAL AND MISCELLANEOUS↗

Risk Assessment in a Chemical Laboratory Following an Explosive Incident Involving a Novel Diazonium Compound: Retrospective Analysis and Lessons Learned

Diazonium compounds are synthetically useful in the production of dyes and textiles, however they are highly explosive under dry conditions. Explosion prevention becomes more difficult when new diazonium compounds are synthesized, because while some syntheses include a counterion to increase their stability, this is not always a reliable method to prevent an explosive incident. Due to the uncertainty surrounding the explosiveness of different diazonium compounds, it is important to understand how to safely clean up after an incident and how to determine when it is safe to return a laboratory to typical operational use, particularly when the incident involves a novel compound where a standard does not exist for instrument calibration. Here, an explosive event is discussed involving the synthesis of 4-bromo-benzenediazonium-2-carboxylate. Following the explosive incident and 3-step cleanup, which involved a precautionary neutralization step, samples were collected from the fume hood where the incident occurred. Because the incident involved an unstable, novel compound that is not commercially available and was deemed unsafe to resynthesize for instrument calibration, we assessed the risk of further explosion by analyzing for the stable decomposition products. Mass spectrometry analysis confirmed that the residue in the fume hood contained 5-bromosalicylic acid, a decomposition product of 4-bromo-benzenediazonium-2-carboxylate. Samples were taken from multiple points in the fume hood and analyzed to estimate the spatial distribution of the decomposition product. Based on this analysis, we inferred that the primary decomposition product was far more abundant than residual energetic, indicating the energetic had been consumed or neutralized to a trace quantity where the risk of further explosion was low. Furthermore, the steps presented here─specifically, initial neutralization and then analyzing the spatial distribution of expected decomposition products to assess risk when a novel explosive material is detonated in a confined space─were our approach to assess further risk following an explosion due to a novel diazonium compound without the need for any further handling or resynthesis of the energetic. Here, we present our approach and critically analyze these steps by discussing retrospective lessons learned and alternative analytical approaches.

Computer simulations↗

Lessons Learned From the Prototypes of the MQXFA Low-Beta Quadrupoles for HL-LHC and Status of Production in the US

With the successful test of the first two pre-series magnets the US HL-LHC Accelerator Upgrade Project has started production of the MQXFA magnets to be used in Q1/Q3 inner triplet elements of the HL-LHC. This good start comes after the test of two prototypes with limited performance, and it demonstrates the importance of learning from past issues. Therefore, in this paper we want to share the most important lessons learned so far, focusing on those which may be more interesting for similar projects. Additionally, we will present the status of MQXFA fabrication in the US.

43 PARTICLE ACCELERATORS↗

Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Telematics Framework for Federal Agencies: Lessons from the Marine Corps Fleet

Executive Order 13693 requires federal agencies to acquire telematics for their light- and medium-duty vehicles as appropriate. This report is intended to help agencies that are deploying telematics systems and seeking to integrate them into their fleet management process. It provides an overview of telematics capabilities, lessons learned from the deployment of telematics in the Marine Corps fleet, and recommendations for federal fleet managers to maximize value from telematics.

97 MATHEMATICS AND COMPUTING↗

Lessons Learned From the Planning of Recent Wind Energy Technologies Office Field Campaigns

The U.S. Department of Energy (DOE) Wind Energy Technology Office (WETO) has funded several wind-energy-focused field campaigns in recent years. While essential to advance our understanding of the interactions between atmosphere and wind turbines, the planning of such campaigns has presented several challenges to the institutions involved in these efforts. In this document, we focus on the planning phase of the field campaigns and summarize the lessons learned from the recent AWAKEN, RAAW, and WFIP-3 field projects. We cover a variety of aspects to offer a proposed methodological pipeline that we recommend is followed when future similar endeavors are planned.

17 WIND ENERGY↗

Lessons Learned: Summary of Insights From the HERO WEC and Waves to Water Deployments Between 2022 and 2024

In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.

16 TIDAL AND WAVE POWER↗

High-Temperature Aquifer Thermal Energy Storage (HT-ATES) Projects in Germany and the Netherlands—Review and Lessons Learned

Aquifer thermal energy storage (ATES) is a concept that can help to address heating and cooling needs through the use of the subsurface as a seasonal thermal energy storage (STES) system. Over 2800 ATES systems have been deployed with storage temperatures typically below 25 °C and only a few with higher temperatures (>40 °C), which would increase the energy density and utility of the stored thermal fluids. Until now, only a few high-temperature aquifer thermal energy storage (HT-ATES) projects have been initiated and are still in operation. These HT-ATES projects have encountered a range of technical and non-technical challenges. This study reviews ten such projects: four in Germany and six in the Netherlands. The non-technical issues include public acceptance, a lack of regulatory framework for these systems, managing overlapping uses of the subsurface, managing changes with the providers and off-takers of thermal energy, and obtaining financing to implement these projects. Common technical issues include geological factors such as incomplete characterization of the subsurface and reservoir heterogeneity; geochemical issues such as mineral scaling, corrosion, and biofouling; lower than expected thermal recovery; and issues with system design and reliability. This review highlights benefits and challenges faced by HT-ATES projects with the goal to use the lessons learned to improve the siting, design, development, and operation of such systems. Recommendations include improved initial subsurface site characterization, use of coupled process models to optimize system design and predict system performance, cascaded uses of stored thermal energy to better utilize the stored heat, monitoring networks to provide feedback on system performance, and expanded system scale to allow for continued operation even when maintenance of some system components is required. Techno-economic modeling and risk analysis could be used to optimize such HT-ATES project design and identify key factors that will affect sustained economic viability. In addition, design flexibility is important for these systems to allow for changing conditions regarding the supply and demand of thermal energy. Adopting these findings should improve the performance and reduce the risks for future HT-ATES projects worldwide.

15 - GEOTHERMAL ENERGY↗