Search NASA⌕ Search

SEARCH · Search NASA

Results for “operator decision support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

NASA Applications and Lessons Learned in Reliability Engineering

Since the Shuttle Challenger accident in 1986, communities across NASA have been developing and extensively using quantitative reliability and risk assessment methods in their decision making process. This paper discusses several reliability engineering applications that NASA has used over the year to support the design, development, and operation of critical space flight hardware. Specifically, the paper discusses several reliability engineering applications used by NASA in areas such as risk management, inspection policies, components upgrades, reliability growth, integrated failure analysis, and physics based probabilistic engineering analysis. In each of these areas, the paper provides a brief discussion of a case study to demonstrate the value added and the criticality of reliability engineering in supporting NASA project and program decisions to fly safely. Examples of these case studies discussed are reliability based life limit extension of Shuttle Space Main Engine (SSME) hardware, Reliability based inspection policies for Auxiliary Power Unit (APU) turbine disc, probabilistic structural engineering analysis for reliability prediction of the SSME alternate turbo-pump development, impact of ET foam reliability on the Space Shuttle System risk, and reliability based Space Shuttle upgrade for safety. Special attention is given in this paper to the physics based probabilistic engineering analysis applications and their critical role in evaluating the reliability of NASA development hardware including their potential use in a research and technology development environment.

Safie, Fayssal M.↗

Evaluation of the Terminal Area Precision Scheduling and Spacing System for Performance-Based Navigation Arrivals

The growth of global demand for air transportation has put increasing strain on the nation's air traffic management system. To relieve this strain, the International Civil Aviation Organization has urged all nations to adopt Performance-Based Navigation (PBN), which can help to reduce air traffic congestion, decrease aviation fuel consumption, and protect the environment. NASA has developed a Terminal Area Precision Scheduling and Spacing (TAPSS) system that can support increased use of PBN during periods of high traffic, while supporting fuel-efficient, continuous descent approaches. In the original development of this system, arrival aircraft are assigned fuel-efficient Area Navigation (RNAV) Standard Terminal Arrival Routes before their initial descent from cruise, with routing defined to a specific runway. The system also determines precise schedules for these aircraft that facilitate continuous descent through the assigned routes. To meet these schedules, controllers are given a set of advisory tools to precisely control aircraft. The TAPSS system has been evaluated in a series of human-in-the-loop (HITL) air traffic simulations during 2010 and 2011. Results indicated increased airport arrival throughput up to 10 over current operations, and maintained fuel-efficient aircraft decent profiles from the initial descent to landing with reduced controller workload. This paper focuses on results from a joint NASA and FAA HITL simulation conducted in 2012. Due to the FAA rollout of the advance terminal area PBN procedures at mid-sized airports first, the TAPSS system was modified to manage arrival aircraft as they entered Terminal Radar Approach Control (TRACON). Dallas-Love Field airport (DAL) was selected by the FAA as a representative mid-sized airport within a constrained TRACON airspace due to the close proximity of a major airport, in this case Dallas-Ft Worth International Airport, one of the busiest in the world. To address this constraint, RNAV routes and Required Navigation Performance with the particular capability known as Radius-to-Fix (RNP-RF) approaches to a short final were used. The purpose of this simulation was to get feedback on how current operations could benefit with the TAPSS system and also to evaluate the efficacy of the advisory tools to support the broader use of PBN in the US National Airspace System. For this NASA-FAA joint experiment, an Air Traffic Control laboratory at NASA Ames was arranged to simulate arrivals into DAL in Instrument Meteorological Conditions utilizing parallel dependent approaches, with two feeder positions that handed off traffic to one final position. Four FAA controllers participated, alternately covering these three positions. All participants were Full-Performance Level terminal controllers and members of the National Air Traffic Controllers Association. During the simulation, PBN arrival operations were compared and contrasted in three conditions. They were the Baseline, where none of the TAPSS systems TRACON controller decision support advisories were provided, the Limited Advisories, reflecting the existing but dormant capabilities of the current terminal automation equipment with providing a subset of the TAPSS systems advisories; numerical delay, landing sequence, and runway assignment information, and the Full Advisories, with providing the following in addition to the ones in the Limited condition; trajectory slot markers, timelines of estimated times of arrivals and sched

Performance based navigation↗

Logistics support economy and efficiency through consolidation and automation

An integrated logistics support system, which would provide routine access to space and be cost-competitive as an operational space transportation system, was planned and implemented to support the NSTS program launch-on-time goal of 95 percent. A decision was made to centralize the Shuttle logistics functions in a modern facility that would provide office and training space and an efficient warehouse area. In this warehouse, the emphasis is on automation of the storage and retrieval function, while utilizing state-of-the-art warehousing and inventory management technology. This consolidation, together with the automation capabilities being provided, will allow for more effective utilization of personnel and improved responsiveness. In addition, this facility will be the prime support for the fully integrated logistics support of the operations era NSTS and reduce the program's management, procurement, transportation, and supply costs in the operations era.

Savage, G. R.↗

Datascope to Enable Earth Independent Medical Operations (EIMO)

BACKGROUND: NASA has amassed sixty years of knowledge and experience relevant to maintenance of crew health and performance in low earth orbit. The Apollo Program introduced the importance of ensuring progressively autonomous operational capability. Earth Independent Medical Operations (EIMO) will require a gradual shift in the balance of medical responsibility, management, and authority from terrestrial to space-based assets. Terrestrial assets will continue to be essential for pre-mission screening and planning in addition to maintenance of crew health and performance. However, new capabilities are needed to enable EIMO and the amount of data required to support these systems, and mitigate the impacts of data transmission delays and reduced bandwidth coupled with lack of cloud-like resources and on-board computing capacity that is currently unclear or operationally insufficient. OVERVIEW: The overall goal of EIMO is to develop artificial intelligence (AI)-based solutions to analyze crew health and performance data utilizing a clinical decision support system (CDSS) to provide crew medical officers (CMO) with the equivalent of real-time, on-board medical consults. The EIMO ecosystem is envisioned as a “system of systems” where embedded reference databases and real-time data streams from multiple input vectors continuously and seamlessly assess crew health and performance. EIMO will be designed to make recommendations to the CMO using multi-modal AI-based natural language processing and machine learning methods with interoperability to push/pull data within and between multiple vehicle and habitat architectures. DISCUSSION: Data flows and storage/retrieval capacity are severely constrained during space missions and the challenges will become even greater during exploration missions. Just as each past program from Mercury to the International Space Station (ISS) required rethinking the interaction between ground-based controllers and space-based crew, so too will future missions to the Moon and Mars. While the NASA High-Performance Spaceflight Computing Processor project aims to increase computational capacity by 100 times over current spaceflight computers, the projected deliverable still lags considerably behind what will be needed to enable an AI-driven CDSS. Restrictions in processing speed and data storage capacity, coupled with transmission bottlenecks and delays, necessitate definition and optimization of an integrated data architecture to enable a progressively autonomous medical capability.

Medical operations↗

Predictive monitoring research: Summary of the PREMON system

Traditional approaches to monitoring are proving inadequate in the face of two important issues: the dynamic adjustment of expectations about sensor values when the behavior of the device is too complex to enumerate beforehand, and the selective but effective interpretation of sensor readings when the number of sensors becomes overwhelming. This system addresses these issues by building an explicit model of a device and applying common-sense theories of physics to model causality in the device. The resulting causal simulation of the device supports planning decisions about how to efficiently yet reliably utilize a limited number of sensors to verify correct operation of the device.

Doyle, Richard J.↗

The Aura Mission, Science and Validation

The EOS-Aura Mission is designed to answer three basic questions concerning the Earth's atmosphere: 1) Is stratospheric ozone recovering as predicted, 2) what are the processes that control air quality, and 3) how is changes in atmospheric chemistry effecting climate? Aura's four instruments work synergistically and are dedicated to answering these questions. Aura's instruments observe from the ultraviolet to the microwave region and view in the nadir and limb. This capability allows measurements of all the critical source, radical, and reservoir gases in the stratosphere to be observed globally on a daily basis. Aura will also continue the TOMS global ozone trend record. Observations in the troposphere will be conducted with the best spatial resolution and coverage ever achieved from space. Key pollutants, including aerosols, gases, and their precursors are the primary targets for Aura. High vertical resolution measurements will be made in the vicinity of the tropopause to better define the interactions of the UT/LS and particularly determine the amount downward transport of ozone and upward transport.of water vapor where both contribute to climate forcing. Aura will also measure aerosols in the stratosphere and troposphere where they play a role in ozone chemistry, air quality and climate. Aura data will be used by several environmental agencies for their decision support systems. Aura post launch validation program includes an augmented ground based measurement program which include the operational networks which measure atmospheric composition. Validation will be conducted under a range of geophysical conditions and throughout most of Aura s observing range. Balloon campaigns will conducted from a variety of latitudes and numerous aircraft missions are planned to cover an altitude range from the middle troposphere to the lower stratosphere and include in-situ and remote sensors. Long duration Un-inhabited aircraft are also being considered as part of the validation program. Substantial collaboration is planned with other chemistry satellite missions such as Envisat, SciSat, and Odin in order to make efficient use of resources and to provide continuity among these missions.

Hilsenrath, Ernest↗

Cost/Effort Drivers and Decision Analysis

Engineering trade study analyses demand consideration of performance, cost and schedule impacts across the spectrum of alternative concepts and in direct reference to product requirements. Prior to detailed design, requirements are too often ill-defined (only goals ) and prone to creep, extending well beyond the Systems Requirements Review. Though lack of engineering design and definitive requirements inhibit the ability to perform detailed cost analyses, affordability trades still comprise the foundation of these future product decisions and must evolve in concert. This presentation excerpts results of the recent NASA subsonic Engine Concept Study for an Advanced Single Aisle Transport to demonstrate an affordability evaluation of performance characteristics and the subsequent impacts on engine architecture decisions. Applying the Process Based Economic Analysis Tool (PBEAT), development cost, production cost, as well as operation and support costs were considered in a traditional weighted ranking of the following system-level figures of merit: mission fuel burn, take-off noise, NOx emissions, and cruise speed. Weighting factors were varied to ascertain the architecture ranking sensitivities to these performance figures of merit with companion cost considerations. A more detailed examination of supersonic variable cycle engine cost is also briefly presented, with observations and recommendations for further refinements.

Seidel, Jonathan↗

Long Term Integration and Implementation of ATD-2 Phase 3 Capabilities

Topics include review of recommendations from an earlier Surface CDM (Collaborative Decision Making) Team (SCT) & Flow Evaluation Team (FET) meeting, support of alternative work flows, and software integration in operational systems. The briefing also identifies incorporation of ATD-2 Phase 3 capabilities into the alternative work flows.

ATD-2, IADS↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Space Technology - Game Changing Development NASA Facts: Autonomous Medical Operations

The AMO (Autonomous Medical Operations) Project is working extensively to train medical models on the reliability and confidence of computer-aided interpretation of ultrasound images in various clinical settings, and of various anatomical structures. AI (Artificial Intelligence) algorithms recognize and classify features in the ultrasound images, and these are compared to those features that clinicians use to diagnose diseases. The acquisition of clinically validated image assessment and the use of the AI algorithms constitutes fundamental baseline for a Medical Decision Support System that will advise crew on long-duration, remote missions.

Autonomous Medical Operations Project↗

Source Data Applicability Impacts on Epistemic Uncertainty for Launch Vehicle Fault Tree Models

Launch vehicle systems are designed and developed using both heritage and new hardware. Design modifications to the heritage hardware to fit new functional system requirements can impact the applicability of heritage reliability data. Risk estimates for newly designed systems must be developed from generic data sources such as commercially available reliability databases using reliability prediction methodologies, such as those addressed in MIL-HDBK-217F. Failure estimates must be converted from the generic environment to the specific operating environment of the system where it is used. In addition, some qualification of applicability for the data source to the current system should be made. Characterizing data applicability under these circumstances is crucial to developing model estimations that support confident decisions on design changes and trade studies. This paper will demonstrate a data-source applicability classification method for assigning uncertainty to a target vehicle based on the source and operating environment of the originating data. The source applicability is determined using heuristic guidelines while translation of operating environments is accomplished by applying statistical methods to MIL-HDK-217F tables. The paper will provide a case study example by translating Ground Benign (GB) and Ground Mobile (GM) to the Airborne Uninhabited Fighter (AUF) environment for three electronic components often found in space launch vehicle control systems. The classification method will be followed by uncertainty-importance routines to assess the need to for more applicable data to reduce uncertainty.

Al Hassan, Mohammad↗

Orbit determination support for Hiten's aerobraking in the Earth's atmosphere

Two passes of the ISAS (Japan's Institute of Space and Astronautical Science) Hiten spacecraft through the Earth's atmosphere, at perigee altitudes of 125 km and 120 km, during Mar. 1991 marked the first aerobraking technology demonstrations for an object in cis-lunar orbit traveling at near Earth escape velocity. Prediction and control of perigee altitude to better than 1 km was desired to assure spacecraft survival. Covariance analysis provided confidence that prediction accuracy better than 200 m for support of final trim maneuver design was achievable with NASA DSN (Deep Space Network) tracking support. ISAS used orbit determination results in their decisions to cancel final trim maneuvers. Post flight reconstructions, marking the first combined use of DSN and ISAS tracking data, yielded perigee altitude solutions which agree with the near real time mission operations support predictions to better than 50 m.

Efron, L.↗

Exploration Technologies for Operations

Although the International Space Station (ISS) assembly has been completed, the Operations support teams continue to seek more efficient and effective ways to prepare for and conduct the ISS operations and future exploration missions beyond low earth orbit. This search for improvement has led to a significant collaboration between the NASA research and advanced software development community at NASA Ames Research Center and the Mission Operations community at NASA Johnson Space Center. Since 2001, NASA Ames Research Center has been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for several of the unmanned Mars missions operations. Since 2006, NASA Ames Research Center has also been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for manned operations support with the Mission Operations Directorate at NASA Johnson Space Center. This paper discusses the completion of the development and deployment of a variety of intelligent and human systems technologies adopted for manned mission operations. The technologies associated with the projects include advanced software systems for operations and human-centered computing. Human-centered computing looks to the processes and procedures that people do to perform any given job, then attempts to identify opportunities to improve these processes and procedures. In particular, for mission operations, improvements are quantified by specifically identifying how a tool can increase a persons efficiency, enhance a persons functional capability, andor improve the assurance of a persons decisions. The Ames development team has collaborated with the Mission Operations team to identify areas of efficiencies through technology infusion applications in support of the Plan, Train, and Fly activities of human-spaceflight mission operations. The specific applications discussed in this paper are in the areas of mission planning systems, mission operations design modeling and workflow automation, advanced systems monitoring, mission control technologies, search tools, training management tools, spacecraft solar array management, spacecraft power management, and spacecraft attitude planning. We discuss these specific projects between the Ames Research Center and the Johnson Space Centers Mission Operations Directorate, and how these technologies and projects are enhancing the mission operations support for the International Space Station. We also discuss the challenges, problems, and successes associated with long-distance and multi-year development projects between the research team at Ames and the Mission Operations customers at Johnson Space center. Finally, we discuss how these technology infusion applications and underlying technologies might be used in the future to support on-board operations of the crew and spacecraft systems as human exploration expands beyond low earth orbit to destinations in the solar system where communications delays will require more on-board autonomy and planning by the crew. Longer communications delays will require that the ground mission operations support will be primarily strategic in nature, while the tactical level of planning, systems monitoring and control, and failure analysisisolationrecovery will be the responsibility of both the spacecraft autonomous systems and the crew. Our expectation is that the technologies

mission operations↗

Framework for a space shuttle main engine health monitoring system

A framework developed for a health management system (HMS) which is directed at improving the safety of operation of the Space Shuttle Main Engine (SSME) is summarized. An emphasis was placed on near term technology through requirements to use existing SSME instrumentation and to demonstrate the HMS during SSME ground tests within five years. The HMS framework was developed through an analysis of SSME failure modes, fault detection algorithms, sensor technologies, and hardware architectures. A key feature of the HMS framework design is that a clear path from the ground test system to a flight HMS was maintained. Fault detection techniques based on time series, nonlinear regression, and clustering algorithms were developed and demonstrated on data from SSME ground test failures. The fault detection algorithms exhibited 100 percent detection of faults, had an extremely low false alarm rate, and were robust to sensor loss. These algorithms were incorporated into a hierarchical decision making strategy for overall assessment of SSME health. A preliminary design for a hardware architecture capable of supporting real time operation of the HMS functions was developed. Utilizing modular, commercial off-the-shelf components produced a reliable low cost design with the flexibility to incorporate advances in algorithm and sensor technology as they become available.

Hawman, Michael W.↗

Denver TMA assessment

This report describes the assessment of the Traffic Management Advisor (TMA) conducted at the Denver Center and TRACON, January 11-February 5, 1993. The assessment addressed the effectiveness of TMA for supporting various traffic management activities. At the Center, traffic management coordinators (TMC's) shadowed traffic operations, using TMA to make metering time and internal release decisions. At the TRACON, TMC's accessed TMA in an advisory mode for different planning activities such as staffing, distributing the traffic load, and changing the airport acceptance rate. These different opportunities for assessing TMA provide insight into TMA as a potential communication aid and planning tool. Findings from this assessment indicate that TMA can be used to support traffic management planning and decisions. TMC's at the center were able to use information provided by TMA to determine metering times as well as internal release times. At the TRACON, TMA supported decisions on airport configuration, airport acceptance rate, load distribution, proactive coordination with the center, and staffing. While findings of TMA use are generally positive, it must be kept in mind that this assessment is a snapshot in time. Not all TMA capabilities were assessed, nor were TMC's fully trained and knowledgeable on all features. Feature use will continue to evolve and strategies emerge as the TMC's gain experience with TMA over a variety of traffic situations and their understanding of TMA capabilities broadens with continued training.

Harwood, Kelly↗

The reusable Space Shuttle Main Engine prepares for long life

Attention is given to Space Shuttle Main Engine (SSME) life extension and logistical systems that support launch and ground operations. The operations and maintenance tasks involved in this aspect of SSME development include turnaround requirements, ground support equipment, and control documentation. A discussion is presented on the spare parts provisioning system, which emphasizes the source of decision-making data and encompasses the hardware tracking system, usage data from ground testing and launch operations, and current and projected life limits. The life extension test program leads the launch program, offering comfortable life limit margins. Planned overhauls for the extension of useful hardware life beyond the 55-mission requirement, a turnabout improvement program, and a continuous training program contribute to launch cost reductions, reliable operations, and long life.

Klatt, F. P., Jr.↗

Flight Deck Robustness/Conformance Testing with a Surface Management System: An Integrated Pilot-Controller Human-in-the-Loop Surface Operations Simulation

An integrated flight deck and controller human-in-the-loopsimulation was conducted with a total of 120 Dallas-Ft.Worth (DFW) taxi-out operations. In this first integratedPilot-Controller Spot and Runway Departure Advisor(SARDA) simulation, ATC Ground and Local Controllersused the SARDA decision support tool to plan and issuespot release clearances and departure clearances. TheAirport and Terminal Area Simulator (ATAS), a simulatedB737NG piloted, in turn, by 10 commercial transportparticipant pilots, was integrated into the realisticsimulation traffic environment. In the simulation,controllers used SARDA advisories to issue spot release,taxi route, and runway/departure radio voice clearances toall aircraft on the airport surface. Simulation resultsindicated that under a variety of observed pilot/aircraftperformance variations, SARDA yielded controlleradvisories that were: Supportive of current-day time-basedoperations; Compatible with controllers’ expectations;Predictive of actual take-off times; and, Adaptable to offnominalevents. An Information Sharing Display, thatpresented SARDA sequence and timing information on theflight deck, was considered useful for both NextGenoperations and current-day time-based Traffic ManagementInitiative (TMI) operations.

Foyle, David C.↗

Refinements in the Design of the Ares V Cargo Launch Vehicle for NASA's, Exploration Strategy

NASA is developing a new launch vehicle fleet to fulfill the national goals of replacing the shuttle fleet, completing the International Space Station (ISS), and exploring the Moon on the way to eventual exploration of Mars and beyond. Programmatic and technical decisions during early architecture studies and subsequent design activities were focused on safe, reliable operationally efficient vehicles that could support a sustainable exploration program. A pair of launch vehicles was selected to support those goals the Ares I crew launch vehicle and the Ares V cargo launch vehicle. They will be the first new human-rated launch vehicles developed by NASA in more than 30 years (Figure 1). Ares I will be the first to fly, beginning space station ferry operations no later than 2015. It will be able to carry up to six astronauts to ISS or support up to four astronauts for expeditions to the moon. Ares V is scheduled to be operational in the 2020 timeframe and will provide the propulsion systems and payload to truly extend human exploration beyond low-Earth orbit. (LEO).

Creech, Steve↗