Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Servicer system demonstration plan and capability development

An orbital maneuvering vehicle (OMV) front end kit is defined which is capable of performing in-situ fluid resupply and modular maintenance of free flying spacecraft based on the integrated orbital servicing system (IOSS) concept. The compatibility of the IOSS to perform gas and fluid umbilical connect and disconnect functions utilizing connect systems currently available or in development is addressed. A series of tasks involving on-orbit servicing and the engineering test unit (ETU) of the on-orbit service were studied. The objective is the advancement of orbital servicing by expanding the Spacecraft Servicing Demonstration Plan (SSDP) to include detail demonstration planning using the Multimission Modular Spacecraft (MMS) and upgrading the ETU control.

Source record↗

Pressure distributions on a 0.04-scale model of the Space Shuttle Orbiter's forward fuselage in the Langley unitary plan wind tunnel

Pressure distribution tests on a 0.04-scale model of the forward fuselage of the Space Shuttle Orbiter are presented without analysis. The tests were completed in the Langley Unitary Plan Wind Tunnel (UPWT). The UPWT has two different test sections operating in the continuous mode. Each test section has its own Mach number range. The model was tested at angles of attack from -2.5 deg to 30 deg and angles of sideslip from -5 deg to 5 deg in both test sections. The test Reynolds number was 6.6 x 10 to the 6th power per meter. The tests were conducted in support of the development of the Shuttle Entry Air Data System (SEADS). In addition to modeling the 20 SEADS pressure orifices, the wind-tunnel model was also instrumented with orifices to match Development Flight Instrumentation (DFI) port locations currently existing on the Space Shuttle Orbiter Columbia (OV-102). This DFI simulation has provided a means for comparisons between reentry flight pressure data and wind-tunnel data.

Bradley, P. F.↗

Terrestrial bodies orbiter, LUNAR - A system for detailed global measurements of a planet's properties

The NASA Lunar Polar Orbiter, to be launched by a Delta vehicle in 1980, is designed to perform a global exploration of such moon properties as the gravity field, figure, and surface composition, as well as a lunar resource survey. The paper reviews the mission, spacecraft, and data system concepts in terms of baseline mission sequence, choice of orbits, spacecraft configuration requirements, mission sequence requirements and data system and operations. Scientific experiments planned for the Orbiter mission include geophysical altimetry and gravity experiments, heat flow experiment, magnetic field experiments, measurements of the moon's natural gamma-ray spectrum, X-ray fluorescence of lunar surface materials, sunlight reflectance spectroscopy, and spectro-stereo imaging. Characteristics of instruments designed for use in these investigations are examined. Through the use of advanced sensors and data-system techniques, coupled with well-developed spacecraft systems, the mission promises to return a very large quantity and variety of lunar data at a cost comparable with that of simpler missions in the past.

Burke, J. D.↗

Numerical Arc-Segmentation Algorithm For A Radio Conference

NASARC computer program developed from general planning principles and decisions of both sessions of World Administrative Radio Conference on Use of Geostationary Satellite Orbit and on Planning of Space Services Utilizing It (WARC-85 and WARC-88). Written to help countries satisfy requirements for nationwide fixed-satellite services from at least one orbital position within predetermined arc. Written in ANSI standard FORTRAN 77.

Whyte, W. A.↗

The Spectrum Orbit Utilization Program (SOUP) used for DBS plan analysis at RARC '83

This paper describes the history, functions, and usage of the program that was used to analyze the plans for direct broadcast satellite service developed in the course of the 1983 Regional Administrative Radio Conference for ITU Region 2. Given the requirements for direct broadcast service by the administrations, the conference delegates (1) developed the appropriate technical parameters; (2) made tentative assignments to the orbit locations, frequencies, and polarizations of space stations, (3) calculated the interferences and margins of such assignments through the use of the Spectrum Orbit Utilization Program (SOUP); and (4) iterated this procedure until an acceptable plan was found.

Davidson, J.↗

Shuttle orbiter storage locker system: A study

Study has been made to assure maximum utility of storage space and crew member facilities in planned space shuttle orbiter. Techniques discussed in this study should be of interest to designers of storage facilities in which space is at premium and vibration is severe. Manufacturers of boats, campers, house trailers, and aircraft could benefit from it.

Butler, D. R.↗

Results of investigations (OA20A) on a 0.015-scale 140A/B configuration space shuttle vehicle orbiter model in the NASA/Langley Research Center unitary plan wind tunnel

Data obtained from a wind tunnel test of a 0.015-scale 140A/B configuration SSV orbiter model are presented. This test was conducted with runs at Mach numbers of 2.5, 3.9, and 4.6 for a constant Reynolds number of 2.5 x 1,000,000/foot. Only one model configuration, the complete 140A/B orbiter vehicle, was investigated; various control-surface settings were run through angles-of-attack from -4 to +42 degrees at 0 and +3 degrees of yaw and through angles-of-sideslip from -4 to +6 degrees at 0, +10, +20, and +30 degrees pitch. The purpose of this test was to establish and verify longitudinal and lateral-directional stability and control characteristics for the updated SSV configuration.

Nichols, M. E.↗

Numerical arc segmentation algorithm for a radio conference: A software tool for communication satellite systems planning

The Numerical Arc Segmentation Algorithm for a Radio Conference (NASARC) provides a method of generating predetermined arc segments for use in the development of an allotment planning procedure to be carried out at the 1988 World Administrative Radio Conference (WARC) on the Use of the Geostationary Satellite Orbit and the Planning of Space Services Utilizing It. Through careful selection of the predetermined arc (PDA) for each administration, flexibility can be increased in terms of choice of system technical characteristics and specific orbit location while reducing the need for coordination among administrations. The NASARC software determines pairwise compatibility between all possible service areas at discrete arc locations. NASARC then exhaustively enumerates groups of administrations whose satellites can be closely located in orbit, and finds the arc segment over which each such compatible group exists. From the set of all possible compatible groupings, groups and their associated arc segments are selected using a heuristic procedure such that a PDA is identified for each administration. Various aspects of the NASARC concept and how the software accomplishes specific features of allotment planning are discussed.

Whyte, W. A.↗

Manned orbital systems concepts study. Book 2: Requirements for extended-duration missions

In order to provide essential data needed in long-range program planning, the Manned Orbital Systems Concepts (MOSC) study attempted to define, evaluate, and compare concepts for manned orbital systems that provide extended experiment mission capabilities in space, flexibility of operation, and growth potential. Specific areas discussed include roles and requirements for man in future space missions, requirements for extended capability, mission/payload concepts, and preliminary design and operational requirements.

Source record↗

Landsat Data Continuity Mission (LDCM) Flight Dynamics System (FDS)

The Landsat Data Continuity Mission (LDCM) will be launched in January 2013 to continue the legacy of Landsat land imagery collection that has been on-going for the past 40 years. While the overall mission and science goals are designed to produce the SAME data over the years, the ground systems designed to support the mission objectives have evolved immensely. The LDCM Flight Dynamics System (FDS) currently being tested and deployed for operations is highly automated and well integrated with the other ground system elements. The FDS encompasses the full suite of flight dynamics functional areas, including orbit and attitude determination and prediction, orbit and attitude maneuver planning and execution, and planning product generation. The integration of the orbit, attitude, maneuver, and products functions allows a very smooth flow for daily operations support with minimal input needed from the operator. The system also provides a valuable real-time component that monitors the on-board orbit and attitude during every ground contact and will autonomously alert the Flight Operations Team (FOT) personnel when any violations are found. This paper provides an overview of the LDCM Flight Dynamics System and a detailed description of how it is used to support space operations. For the first time on a Goddard Space Flight Center (GSFC)-managed mission, the ground attitude and orbits systems are fully integrated into a cohesive package. The executive engine of the FDS permits three levels of automation: low, medium, and high. The high-level, which will be the standard mode for LDCM, represents nearly lights-out operations. The paper provides an in-depth look at these processes within the FDS in support of LDCM in all mission phases.

Good, Susan M.↗

Neighbors on the Red Planet: Mars Science Laboratory Relay Coordination Post InSight Arrival

The Mars Science Laboratory (MSL) strategic communications planning toolset selects orbiter relay opportunities that the rover will use for transmitting data back to Earth. The toolset was extensively reworked in preparation for the Interior Exploration using Seismic Investigations, Geodesy and Heat Transport's (InSight) arrival at Mars in November 2018 and the regular use of Mars Atmosphere and Volatile Evolution (MAVEN) and Trace Gas Orbiter (TGO) orbiters as relay assets in addition to Mars Reconnaissance Orbiter (MRO) and 2001 Mars Odyssey (ODY). Overflight selection criteria was automated in the new toolset to take into account overflight deconfliction and down-selection as well as tactical timeline planning impacts and total data return. This was done while remaining flexible and configurable for changing mission priorities. As the Curiosity rover ages, the MSL planning team must overcome issues such as reduced budgets, memory bank anomalies, and reduced power availability. These are some examples of factors that affect the strategic communications planning toolset. In addition to adapting to evolving internal mission needs, the toolset must also be flexible to changes in the relay planning interface with other landers. The concept of shared relay or “split passes” was introduced when InSight began operating on Mars just 600 kilometers away and at the same longitude as MSL. This proximity meant that orbiters could now communicate with two landers during the same relay session. Over time, this new operational use-case became common practice as InSight and MSL settled into relay planning negotiations. Today, many TGO relay sessions are shared between MSL and InSight. As more orbiters pursue integrating this capability into nominal relay operations, and more landers arrive on Mars, the strategic communications process and toolsets increases in complexity. Development of a single tool that schedules relay sessions for all orbiters and landers simultaneously may become necessary as the number of Martian spacecraft increases. Examples of how toolset selection criteria and capabilities have helped or hindered MSL planning will be presented. Ongoing improvements to MSL toolsets and processes, as well as to shared relay tools such as Mars Relay Operations Service (MaROS) and General Telecom Predictor (GTP) are also discussed in this paper. Examples of how toolset selection criteria and capabilities have helped or hindered MSL planning will be presented. Ongoing improvements to MSL toolsets and processes, as well as to shared relay tools such as Mars Relay Operations Service (MaROS) and General Telecom Predictor (GTP) are also discussed in this paper.

Vandermey, Nancy↗

The Pioneer Venus program

Mission timetables, spacecraft, scientific objectives, and payloads of the two mission, Orbiter and Multiprobe, planned for launch and encounter with Venus during the 1978 Venus mission opportunity are described. Basically, the Orbiter mission has the goal of global mapping of the clouds, atmosphere and ionosphere of Venus by remote sensing and radio occultation, global studies by in situ measurements of the upper atmosphere and ionosphere and solar wind-ionosphere interaction region, and determination of gravitational field harmonics from perturbations of the spacecraft orbit. The Multiprobe mission will study the nature and composition of the clouds, the structure of the atmosphere, the circulation pattern, and the characteristics of the planetary environmental interaction with the solar wind.

Colin, L.↗

Vibration/Libration Interaction Dynamics During the Orbiter Based Deployment of Flexible Members

Essential features of a general formulation for studying librational dynamics of a large class of spacecraft during deployment of flexible members are reviewed. The formulation is applicable to a variety of missions ranging from deployment of antennas, booms and solar panels to manufacturing of trusses for space platforms using the space shuttle. The governing nonlinear, non-autonomous and coupled equations of motion are extremely difficult to solve even with the help of a computer, not to mention the cost involved. To get some appreciation as to the complex interactions between flexibility, deployment and attitude dynamics as well as to help pursue stability and control analysis, the equations are linearized about their nominal deflected equilibrium configuration. The procedure is applied to the Space Shuttle based deployment of boom and plate-like members. Results suggest substantial influence of the inertia parameter, flexural rigidity of the appendages, orbit eccentricity, deployment velocity, initial conditions, etc. on the system response. The results should prove useful in planning of the Orbiter based experiments aimed at assessing effectiveness of procedures for studying dynamics and control of flexible orbiting members.

Modi, V. J.↗

An evaluation of interactive displays for trajectory planning and proximity operations

Rendezvous, docking, and other Space Station proximity operations will be routine in nature in years to come. However, the specific parameters describing each maneuver, such as initial range and position, will vary from mission to mission so a means for depicting and interacting with graphic representations of proposed mission plans is necessary. Orbital operations are inherently non-intuitive due to non-linearities in the equations of motion of orbiting vehicles. Consequently, relative motion between two spacecraft cannot always be easily visualized. For these reasons, real time interactive visual aids and planning tools will be helpful, if not necessary, for future missions both in pre-flight training and on-orbit. Two such displays, Navie and eivaN, are currently available for examination and human factors testing. Since the docking tasks were fundamentally different with each device and because Navie imposed more constraints on the users than eivaN did, the orbital mechanics effects had a more pronounced effect on the Navie results.

Brody, Adam R.↗

Navigation and the Mars global surveyor mission

Navigation and trajectory planning aspects for the Mars global surveyor (MGS) mission, are discussed. In the first 205 days of the mission since launch on 7 November July 1996, two trajectory maneuvers were successfully completed. The third maneuver was cancelled due to the accuracy of the targeting of the previous maneuvers. The final trajectory correction maneuver will occur on arrival in order to adjust the arrival conditions for the Mars orbit insertion maneuver. The planned capture orbit is highly elliptical with a 45 hour orbital period, a 300 km periapsis altitude and a descending node. Two-way coherent Doppler and time delay measurements are acquired in the X-band by the Deep Space network and used to navigate the spacecraft. After capture, the orbit will be circularized by aerobraking and propulsive maneuvers. The three-phase aerobraking maneuver is described. During the 687 earth-day observation period, navigation will maintain a 2:00 pm descending node, sun-synchronous low altitude, short periodic orbit. Ground track coverage will remain almost uniform in order to maximize data acquisition.

Esposito, P.↗

Follow That Satellite: EO-1 Maneuvers into Closed Formation With Landsat-7

As the Landsat-7 spacecraft continued NASA's historic program of earth imaging, begun over three decades ago, NASA launched the Earth Observing-1 (EO-1) spacecraft carrying examples of the next generation of Landsat-7 instruments. The validation method for these instruments was to have EO-1 fly in a close formation behind Landsat-7 on the same World Reference System path. From that formation hundreds of near coincident images would be taken by each spacecraft and compared to evaluate improvements in the EO-1 instruments. This paper will address the mission analysis required to launch and maneuver EO-1 into the formation with Landsat-7 where instrument validation was to occur plus a summary of completing the formation acquisition. EO-1 is required to operate one minute +/- 6 seconds behind Landsat-7 during the period of co-fly imaging with a cross track separation of within + 3 kilometers. This separation time can also be stated as a one minute +/- 6 seconds time difference in the Mean Local Time (MLT) at the descending nodes. Achieving the required MLT is heavily dependent on the time of launch. The EO-1 launch window, which had to accommodate the dual payloads of EO-1 and SAC-C, was very limited ranging from 0 to 22 seconds over the 16 day Landsat-7 WRS repeat cycle during which EO-1 was launched. Each EO-1 launch opportunity that occurred on a different day of a Landsat-7 16 day repeat cycle required a separate and distinct maneuver profile. These profiles varied significantly in duration and amount of onboard propellant required to achieve them. EO-1 launched on a day judged to have "medium" resource requirements for achieving the formation with Landsat-7. To phase EO-1 one minute behind Landsat-7 in the along track direction, a series of altitude adjusts separated by specific drift intervals were executed. Additional maneuvers slightly changed the EO-1 inclination to maintain the MLT requirements. Orbit maneuvers were planned and executed within errors of less than 1.5 percent and propellant usage was near nominal consuming 3.4 kilograms out of a launch and early orbit budget of 11 kilograms. The pre-launch 3 -sigma propellant budget allowed for 1+ years of EO-1 mission life. The success of the EO-1 launch and early orbit operations provided sufficient propellant for nearly 4 years of on orbit operations. Special action taken during the EO-1 maneuver period involved some maneuver re-planning to reduce concerns about a potential close approach between EO-1 and Landsat-7. The result of this re-planning was a safer close approach and improvement in future formation acquisition planning.

DeFazio, Robert↗