Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbital operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

GFO-1 Geophysical Data Record and Orbit Verifications for Global Change Studies

This final report summarizes the research work conducted under NASA's Physical Oceanography Program, entitled, GFO-1 Geophysical Data Record And Orbit Verifications For Global Change Studies, for the investigation time period from December 1, 1997 through November 30, 2000. The primary objectives of the investigation include providing verification and improvement for the precise orbit, media, geophysical, and instrument corrections to accurately reduce U.S. Navy's Geosat-Followon-1 (GFO-1) mission radar altimeter data to sea level measurements. The status of the GFO satellite (instrument and spacecraft operations, orbital tracking and altimeter) is summarized. GFO spacecraft has been accepted by the Navy from Ball Aerospace and has been declared operational since November, 2000. We have participated in four official GFO calibration/validation periods (Cal/Val I-IV), spanning from June 1999 through October 2000. Results of verification of the GFO orbit and geophysical data record measurements both from NOAA (IGDR) and from the Navy (NGDR) are reported. Our preliminary results indicate that: (1) the precise orbit (GSFC and OSU) can be determined to approx. 5 - 6 cm rms radially using SLR and altimeter crossovers; (2) estimated GFO MOE (GSFC or NRL) radial orbit accuracy is approx. 7 - 30 cm and Operational Doppler orbit accuracy is approx. 60 - 350 cm. After bias and tilt adjustment (1000 km arc), estimated Doppler orbit accuracy is approx. 1.2 - 6.5 cm rms and the MOE accuracy is approx. 1.0 - 2.3 cm; (3) the geophysical and media corrections have been validated versus in situ measurements and measurements from other operating altimeters (T/P and ERS-2). Altimeter time bias is insignificant with 0-2 ms. Sea state bias is about approx. 3 - 4.5% of SWH. Wet troposphere correction has approx. 1 cm bias and approx. 3 cm rms when compared with ERS-2 data. Use of GIM and IRI95 provide ionosphere correction accurate to 2-3 cm rms during medium to high solar activities; (4) the noise of the GFO altimeter data (uncorrected SSH) is about 15 mm, compared to 19 min for ERS-2, and 12 min for TOPEX. It is anticipated that the operational GFO-1 altimeter data will contribute to a number of researches in physical oceanography. A list of relevant presentations and publications is attached.

Shum, C. K.↗

Shuttle and Transfer Orbit Thermal Analysis and Testing of the Chandra X-Ray Observatory Charge-Couple Device Imaging Spectrometer Radiator Shades

Thermal analyses of the Shuttle and Transfer Orbit of the Advanced X-Ray Astrophysics Facility Charge-Coupled Device (CCD) Imaging Spectrometer (ACIS), one of two science instruments on the Chandra X-Ray Observatory, revealed a low-earth orbit (LEO) overheating problem on the goldized Kapton faces of two radiator shades. The shades were coated with the goldized Kapton to provide a low hemispherical emittance to minimize direct and backloaded heating from the sun and the observatory and high specularity to optimize the coupling to space on two passive radiators which cool the focal plane to -120 C +/- 1 C during on-orbit operations. Since the observatory has a highly elliptical final orbit of 10,000 kilometers by 140,000 kilometers and the ACIS radiators and shades are oriented anti-sun, the high solar absorptance to emittance ratio of the goldized Kapton was not an issue. However, during Shuttle bay-to-earth operations, the short duration solar heating occurring near the eclipse entry and exit resulted in shade temperatures in excess of the cure temperature of the adhesive used to bond the goldized Kapton and honeycomb face-sheets. The detailed thermal analysis demonstrating the LEO overheating as well as the redesign options and thermal testing of a redesigned development unit shade are presented.

Sharp, John R.↗

Space Environment Factors Affecting the Performance of International Space Station Materials: The First Two Years of Flight Operations

In this paper, the natural and induced space environment factors affecting materials performance on ISS are described in some detail. The emphasis will be on ISS flight experience and the more significant design and development issues of the last two years. The intent is to identify and document the set of space environment factors, affecting materials, that are producing the largest impacts on the ISS flight hardware verification and acceptance process and on ISS flight operations. Orbital inclination (S1.6 ) and altitude (nominal3S0 km to 400 km altitude) determine the set of natural environment factors affecting the functional life of materials and subsystems on ISS. ISS operates in the F2 region of Earth's ionosphere in well-defined fluxes of atomic oxygen, other ionospheric plasma species, and solar UV, VUV, and x-ray radiation, as well as galactic cosmic rays, trapped radiation, and solar cosmic rays (1,2). The high latitude orbital environment also exposes external surfaces to significantly less well-defined or predictable fluxes of higher energy trapped electrons and auroral electrons (3 ,4). The micrometeoroid and orbital debris environment is an important determinant of spacecraft design and operations in any orbital inclination. Environment factors induced by ISS flight operations include ram-wake effects, magnetic induction voltages arising from flight through Earth's magnetic field, hypergolic thruster plume impingement from proximity operations of visiting vehicles, materials outgassing, venting and dumping of fluids, ISS thruster operations, as well as specific electrical power system interactions with the ionospheric plasma (S-7). ISS must fly in a very limited number of approved flight attitudes leading to location specific environmental exposures and extreme local thermal environments (8). ISS is a large vehicle and produces a deep wake structure from which both ionospheric plasma and neutrals (atomic oxygen) are largely excluded (9-11). At high latitude, the ISS wake may produce a spacecraft charging environment similar to that experienced by the DMSP and Freja satellites (800 to 100 km altitude polar orbits), especially during geo-magnetic disturbances (12-14). ISS is also subject to magnetic induction voltages (VxB L) on conducting structure, a result of high velocity flight through Earth's magnetic field. The magnitude of the magnetic induction voltage varies with location on ISS, as well as the relative orientation of the vehicle velocity vector and planetary magnetic field vector, leading to maximum induction voltages at high latitude (15). The space environment factors, natural and induced, that have had the largest impact on pre-launch ISS flight hardware verification and flight operations during the first two years of ISS flight operations are listed below and grouped according to the physical and chemical processes driving their interaction with ISS materials.

Koontz, Steven L.↗

(abstract) Satellite Dynamics About Eros

The Near Earth Asteroid Rendezvous (NEAR) mission spacecraft will arrive at Asteroid 433 (Eros) in February 1999. Following an initial period of characterization, the science phase of the mission will commence, and unprecedented information concerning an asteroid's shape, mass, density, composition, and rotational dynamics will be sent to Earth for analysis. It will also mark the start of orbital operations about the most complex and irregular gravity field ever encountered in the history of space exploration. The severity of Eros' distortion from the usual spheroid bodies encountered in planetary exploration leads to fundamental differences in the orbital dynamics about it. Operations about Eros will also serve as an exciting test of orbital determination and prediction in an orbital environment which can be chaotic in some instances. General orbital dynamics about Eros are discussed. Some simple formulae are given for the secular motion of the node and argument of periapsis. Conditions for a satellite orbit to escape from Eros are discussed, and some simple results derived. Finally, the chaotic nature of certain orbits about Eros are discussed, and the consequences for orbit prediction are investigated.

Near↗

Plans for West Coast STS launch capability

The layout and scope of operations of the Vandenberg AFB West Coast Launch Site for the Space Shuttle are examined. The launch site intended for the first West Coast launch in December 1983 is being constructed by the United States Air Force. Topic discussed include site/selection/management/concepts, Shuttle hardware flow and related facilities, launch pad operations, orbiter erection at SLC-6 VAFB, solid rocket booster operations, and payload ground processing. In conclusion it is noted that NASA and DOD personnel are working together to ensure that the launch site is completed on schedule at minimum cost.

Murphy, W. P.↗

Expert system for on-board satellite scheduling and control

An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.

Barry, John M.↗

NASA Aircraft-Satellite Instrument Calibration Project

Ground based prelaunch calibration of satellite instruments usually is not adequate to provide an accurate characterization of the in-orbit performance of a satellite instrument. This is because the ground calibrations may not simulate the in-orbit environment observations of the satellite sensor, or because the sensor characteristics have changed during launch and in-orbit operations. One technique to obtain a meaningful in-orbit calibration of satellite sensors is to acquire simultaneous observations of an Earth scene with the satellite and a well calibrated aircraft or shuttle sensor which has similar characteristics to the satellite sensor. This is a direct in-orbit calibration technique and is usually called vicarious calibration. The experiment with the control instrument must occur above the sensible atmosphere as measured by the satellite sensor to provide a useful improvement to the calibration of the satellite sensor. Some observations on the experiments are made.

Guenther, B. W.↗

White Paper: Gateway Destination Orbit Model: A Continuous 15 Year NRHO Reference Trajectory

The Gateway program has selected a Near-Rectilinear Halo Orbit (NRHO) of the L2 southern family as its operational orbit. In order to facilitate mission analysis for Gateway and associated programs utilizing this orbit, a representative reference trajectory 15 years in duration has been developed. The purpose of this white paper is to review the properties of this NRHO reference trajectory.

lunar synodic resonant↗

Thermal Design Challenges for In-Flight Exposure to an Electric Propulsion Plasma Plume Environment

The use of electric propulsion to carry out NASA in-space propulsion demands has been increasing. A big part of fulfilling this demand is the Power and Propulsion Element (PPE) for NASA's Lunar Gateway. When built, the PPE will have the largest electric propulsion system to ever fly on a spacecraft, which brings new and difficult challenges. The environment created by the electric propulsion system during on-orbit operation of the thrusters has been shown to be different than those measured during operation in terrestrial vacuum facilities. Understanding the on-orbit environment created by the thrusters and its impacts on the spacecraft is the goal of the Plasma Diagnostic Package (PDP). The PDP is a sensor package, which is being developed by NASA GRC (Glenn Research Center), to fly on the PPE. The PDP will measure different aspects of the thruster plume in order to develop higher fidelity modeling of EP (Electric Power) systems. In order to capture quality measurements of the plume the PDP will need to install sensors in close proximity of it. This poses several unique thermal design challenges. Some of these challenges include: the long duration exposure to plume induced heating, the effects of plume induced erosion and sputter deposition on thermal control surfaces, and the extreme environments of a cis-lunar orbit. This paper looks to define the thermal challenges, explain modeling techniques, and offer design solutions for unique challenges of the PDP mission.

Thermal↗

The Planetary Protection Strategy of the Earth Return Orbiter–Capture, Containment & Return System in the Context of the Mars Sample Return Campaign

The Mars Sample Return Campaign aims at bringing back to Earth the rock and atmospheric samples that the rover Perseverance has started to collect on the surface of Mars with the goal of analyzing them in a facility built specifically for this purpose to answer questions about the habitability of Mars. The Campaign consists of several missions, including the Earth Return Orbiter–Capture, Containment & Return System (ERO-CCRS), which will capture the samples previously put in Martian orbit, contain them in redundant containers to ensure that no unsterilized particles are released, and return them to Earth through a parachute-less entry vehicle. Both NASA and ESA policies address the United Nations’ Outer Space Treaty by addressing potential harm from material returned from solar system bodies beyond the Earth-Moon system. In the conduct of Mars Sample Return, the two agencies have agreed to apply approaches consistent with their own standards to campaign elements each provides. This work presents the overall strategy for both forward and backward planetary protection for the ERO-CCRS mission. Specifically, for forward planetary protection, CCRS is not required to meet specific bioburden requirements as a Category III mission provided the ERO (1) meets orbital lifetime requirements during orbiter operations and (2) any elements jettisoned at Mars meet orbital lifetime requirements. CCRS is required to be built in ISO-8 or better cleanrooms and, by agreement with ERO, be compatible with direct bioburden verification methods. For backward planetary protection, the overall approach includes building robust, highly reliable systems to prevent inadvertent release of unsterilized Mars material through redundant containment vessels and particle transport analyses. Ongoing work to define verification approaches and quantify containment assurance levels for specific sample return systems will also be discussed, along with how those data will inform launch approval for ERO-CCRS.

Giuseppe Cataldo↗

Electric Propulsion for the Psyche Mission: One Year to Launch

NASA’s Psyche mission will launch in 2022 and begin a 3.6-year cruise to the metallic asteroid Psyche, the largest metal asteroid in the solar system. The baseline spacecraft design is a hybrid of JPL’s deep-space heritage subsystems with commercial partner Maxar’s electric propulsion, power, and structure subsystems. The Psyche mission will feature the first use of Hall thrusters for a NASA mission, and the first use of Hall thrusters beyond cis-lunar space. This paper will provide an overview of the electric propulsion subsystem and details of the flight system implementation for the Psyche mission. The concept of operations is discussed including subsystem-level operations, the initial checkout after launch, and cruise and orbital operations. Command and control interfaces with the spacecraft and fault protection design are presented. Finally, the status of subsystem assembly and test is described.

Li, Julie↗

Flight operations payload training for crew and support personnel. Task 3: Inflight operations and training for payloads

Various degrees of Commander/Pilot involvement in on-orbit operation of payloads are examined. Constraints and limitations resulting from their participation or affecting their ability to participate are identified. Four options, each representing a different set of involvement depths and concepts are analyzed. Options identified are boundaries around extremes in Commander/Pilot payload involvement. Real world choices may fall somewhere in between, but for the purposes of this study the options as represented provide a matrix from which logical and practical decisions can be made about crew participation in payload operations.

Beardslee, R. F.↗

Payload/orbiter contamination control assessment support

The development and use is described of a basic contamination mathematical model of the shuttle orbiter which incorporates specific shuttle orbiter configurations and contamination sources. These configurations and sources were evaluated with respect to known shuttle orbiter operational surface characteristics and specific lines-of-sight which encompass the majority of viewing requirements for shuttle payloads. The results of these evaluations are presented as summary tables for each major source. In addition, contamination minimization studies were conducted and recommendations are made, where applicable, to support the shuttle orbiter design and operational planning for those sources which were identified to present a significant contamination threat.

Rantanen, R. O.↗

Space Shuttle payloads and data handling accommodations

The Space Transportation System, which includes the Space Shuttle, will reduce the costs of earth orbital operations while improving operational capabilities and flexibility. The Shuttle can deliver payloads up to 65,000 pounds to a 150-nmi circular orbit at a substantially lower operational cost per flight than the Titan III-C system, which has a payload delivery capability of only 30,000 pounds. In addition, the Space Shuttle can return to earth with up to 32,000 pounds of payload, a capability not provided by expendable launch vehicles. Typical payload missions are considered along with aspects of satellite placement and recovery, typical free-flying payloads, attached scientific payloads, and the typical nature of payload data.

Teasdale, W. E.↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗