Search NASA⌕ Search

SEARCH · Search NASA

Results for “program costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Aqueous Bromide Discharges from U.S. Coal-Fired Power Plants: Points of Origin, Concentration Ranges, and Effluent Treatment Costs

Bromide discharges from coal-fired power plants have received increased attention from regulatory bodies due to their contribution to the formation of disinfection byproducts (DBPs) in downstream drinking water treatment plants. Here, this paper characterizes the relative contributions of bromide from coal feedstocks and bromine-based mercury control processes, estimates the distribution of bromide concentrations at 85 active coal-fired power plants across the United States (U.S.) with wet flue gas desulfurization units, and estimates the cost of bromide removal from wastewater discharge using year 2020 data. Bromide discharges are estimated at the plant level using a combination of the reported coal rank and composition combusted, estimates of bromide addition in mercury control techniques under multiple halogen addition scenarios, and the estimated flue gas desulfurization (FGD) wastewater flow rate. The median, simulated plant-level estimation of total FGD wastewater flow is 18.3 gallons/min at a bromide concentration of 319 mg/L, equivalent to ~11.6 tonnes/year of bromide discharges to the environment. Next, we evaluated the expected cost of employing the best available technology (BAT) to control bromide discharges in FGD wastewater to prevent contributions to DBP formation. Treatment would need to remove more than 99.8% of bromide to reach the 0.2 mg/L voluntary incentive program (VIP) limit. The total cost of treatment depends on whether disposal is on- or off-site; the average costs for all plants combined come to an average of $110 million ($95.2/kgal) in 2021 U.S. dollars for on-site disposal, or $134 million ($115/kgal) for off-site disposal.

01 COAL, LIGNITE, AND PEAT↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scale-up of Carbon/Carbon Bipolar Plates

This project was focused upon developing a unique material technology for use in PEM fuel cell bipolar plates. The carbon/carbon composite material developed in this program is uniquely suited for use in fuel cell systems, as it is lightweight, highly conductive and corrosion resistant. The project further focused upon developing the manufacturing methodology to cost-effectively produce this material for use in commercial fuel cell systems. United Technology Fuel Cells Corp., a leading fuel cell developer was a subcontractor to the project was interested in the performance and low-cost potential of the material. The accomplishments of the program included the development and testing of a low-cost, fully molded, net-shape carbon-carbon bipolar plate. The process to cost-effectively manufacture these carbon-carbon bipolar plates was focused on extensively in this program. Key areas for cost-reduction that received attention in this program was net-shape molding of the detailed flow structures according to end-user design. Correlations between feature detail and process parameters were formed so that mold tooling could be accurately designed to meet a variety of flow field dimensions. A cost model was developed that predicted the cost of manufacture for the product in near-term volumes and long-term volumes (10+ million units per year). Because the roduct uses lowcost raw materials in quantities that are less than competitive tech, it was found that the cost of the product in high volume can be less than with other plate echnologies, and can meet the DOE goal of $4/kW for transportation applications. The excellent performance of the all-carbon plate in net shape was verified in fuel cell testing. Performance equivalent to much higher cost, fully machined graphite plates was found.

08 HYDROGEN↗

Multi-Year Analysis Examines Costs, Benefits, and Impacts of Renewable Portfolio Standards

As states consider revising renewable portfolio standard (RPS) programs or developing new ones, careful assessments of the costs, benefits, and other impacts of existing policies will be critical. RPS programs currently exist in 29 states and Washington, D.C. Many of these policies, which were enacted largely during the late 1990s and 2000s, will reach their terminal targets by the end of this decade. The National Renewable Energy Laboratory (NREL) and Lawrence Berkeley National Laboratory (LBNL) are engaged in a multi-year project to examine the costs, benefits, and other impacts of state RPS polices both retrospectively and prospectively. This fact sheet overviews this work.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Photovoltaics (PV) as an Eligible Measure in Residential PACE Programs: Benefits and Challenges (Fact Sheet)

Property Assessed Clean Energy (PACE) financing is one of several new financial models broadening access to clean energy by addressing the barrier of initial capital cost. The majority of the PACE programs in the market today include PV as an eligible measure. PV appeals to homeowners as a way to reduce utility bills, self-generate sustainable power, increase energy independence and demonstrate acommitment to the environment. If substantial state incentives for PV exist, PV projects can be economic under PACE, especially when partnered with good net metering policies. At the same time, PV is expensive relative to other eligible measures with a return on investment horizon that might exceed program targets. This fact sheet reviews the benefits and potential challenges of including PV inPACE programs.

14 SOLAR ENERGY↗

Scalable Light Module for Low-Cost, High-Efficiency Light- Emitting Diode Luminaires

During this two-year program Cree developed a scalable, modular optical architecture for low-cost, high-efficacy light emitting diode (LED) luminaires. Stated simply, the goal of this architecture was to efficiently and cost-effectively convey light from LEDs (point sources) to broad luminaire surfaces (area sources). By simultaneously developing warm-white LED components and low-cost, scalable optical elements, a high system optical efficiency resulted. To meet program goals, Cree evaluated novel approaches to improve LED component efficacy at high color quality while not sacrificing LED optical efficiency relative to conventional packages. Meanwhile, efficiently coupling light from LEDs into modular optical elements, followed by optimally distributing and extracting this light, were challenges that were addressed via novel optical design coupled with frequent experimental evaluations. Minimizing luminaire bill of materials and assembly costs were two guiding principles for all design work, in the effort to achieve luminaires with significantly lower normalized cost ($/klm) than existing LED fixtures. Chief project accomplishments included the achievement of >150 lm/W warm-white LEDs having primary optics compatible with low-cost modular optical elements. In addition, a prototype Light Module optical efficiency of over 90% was measured, demonstrating the potential of this scalable architecture for ultra-high-efficacy LED luminaires. Since the project ended, Cree has continued to evaluate optical element fabrication and assembly methods in an effort to rapidly transfer this scalable, cost-effective technology to Cree production development groups. The Light Module concept is likely to make a strong contribution to the development of new cost-effective, high-efficacy luminaries, thereby accelerating widespread adoption of energy-saving SSL in the U.S.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Energy System with Beneficial Carbon Dioxide (CO{sub 2}) Use

To address the public concerns regarding the consequences of climate change from anthropogenic carbon dioxide (CO{sub 2}) emissions, the U.S. Department of Energy National Energy Technology Laboratory (DOE-NETL) is actively funding a CO{sub 2} management program to develop technologies capable of reducing the CO{sub 2} emissions from fossil fuel power plants and other industrial facilities. Over the past decade, this program has focused on reducing the costs of carbon capture and storage technologies. Recently, DOE-NETL launched an alternative CO{sub 2} mitigation program focusing on beneficial CO{sub 2} reuse and supporting the development of technologies that mitigate emissions by converting CO{sub 2} to solid mineral form that can be utilized for enhanced oil recovery, in the manufacturing of concrete or as a benign landfill, in the production of valuable chemicals and/or fuels. This project was selected as a CO{sub 2} reuse activity which would conduct research and development (R&D) at the pilot scale via a cost-shared Cooperative Agreement number DE-FE0001099 with DOE-NETL and would utilize funds setaside by the American Recovery and Reinvestment Act (ARRA) of 2009 for Industrial Carbon Capture and Sequestration R&D,

01 COAL, LIGNITE, AND PEAT↗

Optimal Operation of Residential High Performance Water Heater for Reduction of Electricity Cost and Peak Demand Through Field Validation

Water heating accounts for about 18% of a typical US home’s energy use. Modern water heaters have enabled control options through APIs, offering customers the opportunity to reduce their energy cost and peak demand by dynamically adjusting settings. A water heater’s capacity to store energy using its storage tank makes it an asset for peak demand reduction and energy cost savings. For this reason, a mixed-integer linear programming model is proposed to minimize the energy cost of a high-performance water heater while also reducing the peak demand of the residential household under a time-of-use utility rate by dynamically changing the water heater’s running mode. Specifically, a multi-objective optimization model is formulated to determine the mode settings of the water heater considering hot water use, time-of-use rate, and peak demand limit of the residential household. The mode settings are associated with different dead bands of water temperature for triggering on/off action of the heat pump and heating element. A 66-gal hybrid electric high performance water heater was used for numerical simulation and practical experiments. The simulation results were well aligned with measurements of practical experiments, validating the soundness of the thermodynamic model. In addition, reductions of energy cost, enabling affordability, and reducing peak demand are demonstrated. The research team also developed a software framework with dashboards to automatically and continuously monitor and manage devices.

Liu, Guodong [ORNL] (ORCID:0000000213498608)↗

Needs for integrated risk assessment to support optimal environmental management decisions - 15455

Cleaning up legacy waste from 50 years of nuclear weapons production and energy research still remains a challenge for the U.S. Department of Energy (DOE). The DOE environmental management program is currently forecasted to run through at least late 2060's with an estimated liability of $204 billion. Risks to human health of workers and the public, the ecological system, and nuclear safety of cleanup activities continue to drive the cost of DOE's cleanup programs. Currently, these risks are generally assessed and managed independently of each other. Except for DOE self-regulated on-site disposal activities of low-level radioactive waste, risks to human health and the environment are generally under the purview of U.S. Environmental Protection Agency and State regulatory agencies, while nuclear safety risks are regulated by DOE with oversight from the U.S. Nuclear Regulatory Commission and the Defense Nuclear Facilities Safety Board where appropriate. When managing health and environmental risks, the individual regulatory authorities often use an area-by-area (or unit-by-unit), contaminant-by-contaminant (chemical-by-chemical or radionuclide-by-radionuclide) approach, focusing on a single medium (soil, water, or air), a single source (e.g., a burial ground or a processing facility), and a single receptor (e.g, a groundwater well or a creek). This level of segregation in risk evaluations by risk category, geographical location, and operational unit, as well as the corresponding separation of regulatory authorities poses a significant challenge to reaching an optimal decision in prioritizing and managing cleanup activities. This management challenge adds another layer of complexity to large-scale cleanup effort at complex sites such as the Hanford site in eastern Washington. Therefore, to support a scientifically sound, operationally robust decision making process, there is a need for an integrated, holistic approach to risk assessment that addresses the combined effects of all major contributing factors. Previous studies have pointed out the need for integrated risk assessments that address multi-contaminant, multimedia, multi-pathway exposures, for the purposes of evaluating risks to human health and the environment. We believe that a comprehensive risk assessment should also take into nuclear safety risks that are associated with handling of nuclear material either retrieved from burial sites or to be decommissioned from nuclear facilities. Recent efforts, such as the Consortium for Risk Evaluation with Stakeholder Participation (CRESP)-led Hanford site-wide independent risk review that will categorize all types of risks at the Hanford site and the DOE complex-wide risk review mandated by the Fiscal Year 2014 Consolidated Appropriations Act ('Omnibus bill'), are beginning to more comprehensively address this need. This paper provides a categorization of various types of risks present at typical DOE sites, reviews the current risk assessment and management practices, and discusses the needs for integrating nuclear safety into performance and risk assessments for optimal cleanup decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Wind Speed Turbine Developments in Convoloid Gearing: Final Technical Report, June 2005 - October 2008

This report presents the results of a study conducted by Genesis Partners LP as part of the United States Department of Energy Wind Energy Research Program to develop wind technology that will enable wind systems to compete in regions having low wind speeds. The purpose of the program is to reduce the cost of electricity from large wind systems in areas having Class 4 winds to 3 cents per kWh for onshore systems or 5 cents per kWh for offshore systems. This work builds upon previous activities under the WindPACT project, the Next Generation Turbine project, and Phase I of the Low Wind Speed Turbine (LWST) project. This project is concerned with the development of more cost-effective gearing for speed increasers for wind turbines.

108-KW WIND TURBINE GEARBOXES↗

Application of the Diminishing Returns Concept in the Hydroecologic Restoration of Riverscapes

Principles for optimizing the number and placement of ecological restoration actions on rivers and coasts would be useful in project engineering design and program planning. This study demonstrated that the yield of inundated floodplain habitat area from dike breaching conforms to a diminishing returns model. The aggregate effects of establishing hydrologic connections between a tidally influenced main stem river and the floodplain were experimentally examined using a hydrodynamic model. Restoration clusters of size 1, 4, 8, and more, replicated and randomized within the landscape, yielded average wetted floodplain area conforming with an exponential rise to maximum curve2(0.99)r=. Analysis of the average incremental change in floodplain inundation produced per breach showed that opening 25 % of the channels crossing the dike provided the maximum return on investment as measured by wetted area. Midstream breaches yielded 60 % and upstream breaches 2 % of the wetted area produced by downstream breaches. Dike-breach restoration programs therefore can be optimized by strategic determination of the spatial configuration and number of demolitions, though biological factors such as the accessibility of floodplain habitat and total length of channels connected also need to be considered. These findings have implications for cost-benefit analyses in restoration program planning.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Advanced Fuel Cycle Cost Basis

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Comparative Evaluation of Financing Programs: Insights From California’s Experience

Berkeley Lab examines criteria for a comparative assessment of multiple financing programs for energy efficiency, developed through a statewide public process in California. The state legislature directed the California Alternative Energy and Advanced Transportation Financing Authority (CAEATFA) to develop these criteria. CAEATFA's report to the legislature, an invaluable reference for other jurisdictions considering these topics, discusses the proposed criteria and the rationales behind them in detail. Berkeley Lab's brief focuses on several salient issues that emerged during the criteria development and discussion process. Many of these issues are likely to arise in other states that plan to evaluate the impacts of energy efficiency financing programs, whether for a single program or multiple programs. Issues discussed in the brief include: -The stakeholder process to develop the proposed assessment criteria -Attribution of outcomes - such as energy savings - to financing programs vs. other drivers -Choosing the outcome metric of primary interest: program take-up levels vs. savings -The use of net benefits vs. benefit-cost ratios for cost-effectiveness evaluation -Non-energy factors -Consumer protection factors -Market transformation impacts -Accommodating varying program goals in a multi-program evaluation -Accounting for costs and risks borne by various parties, including taxpayers and utility customers, in cost-effectiveness analysis -How to account for potential synergies among programs in a multi-program evaluation

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Recovery Hydropower: Prospects for Off-Setting Electricity Costs for Agricultural, Municipal, and Industrial Water Providers and Users; July 2017 - September 2017

Energy recovery hydropower is one of the most cost-effective types of new hydropower development because it is constructed utilizing existing infrastructure, and it is typically able to complete Federal Energy Regulatory Commission (FERC) review in 60 days. Recent changes in federal and state policy have supported energy recovery hydropower. In addition, some states have developed programs and policies to support energy recovery hydropower, including resource assessments, regulatory streamlining initiatives, and grant and loan programs to reduce project development costs. This report examines current federal and state policy drivers for energy recovery hydropower, reviews market trends, and looks ahead at future federal resource assessments and hydropower reform legislation.

13 HYDRO ENERGY↗

Opportunities in SMR Emergency Planning

Using year 2014 cost information gathered from twenty different locations within the current commercial nuclear power station fleet, an assessment was performed concerning compliance costs associated with the offsite emergency Planning Standards contained in 10 CFR 50.47(b). The study was conducted to quantitatively determine the potential cost benefits realized if an emergency planning zone (EPZ) were reduced in size according to the lowered risks expected to accompany small modular reactors (SMR). Licensees are required to provide a technical basis when proposing to reduce the surrounding EPZ size to less than the 10 mile plume exposure and 50 mile ingestion pathway distances currently being used. To assist licensees in assessing the savings that might be associated with such an action, this study established offsite emergency planning costs in connection with four discrete EPZ boundary distances, i.e., site boundary, 2 miles, 5 miles and 10 miles. The boundary selected by the licensee would be based on where EPA Protective Action Guidelines are no longer likely to be exceeded. Additional consideration was directed towards costs associated with reducing the 50 mile ingestion pathway EPZ. The assessment methodology consisted of gathering actual capital costs and annual operating and maintenance costs for offsite emergency planning programs at the surveyed sites, partitioning them according to key predictive factors, and allocating those portions to individual emergency Planning Standards as a function of EPZ size. Two techniques, an offsite population-based approach and an area-based approach, were then employed to calculate the scaling factors which enabled cost projections as a function of EPZ size. Site-specific factors that influenced source data costs, such as the effects of supplemental funding to external state and local agencies for offsite response organization activities, were incorporated into the analysis to the extent those factors could be representatively apportioned.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Income Verification Strategies for Income-Based Solar Programs

The Inflation Reduction Act has created substantial new programs that support adoption of solar power by low-income households, including the $7 billion Solar For All program and the Low-Income Communities Bonus Credit Program, which increases the investment tax credit for certain types of deployment. In addition, a growing number of states are using solar programs to reduce energy burdens and create energy justice opportunities for low-income households and disadvantaged communities. Verifying the income of participating customers is an important component of these programs. Program managers are seeking strategies to verify a large number of subscribing customers in an accurate, timely, and cost-efficient manner. To help inform program managers, Berkeley Lab investigated how a number of energy and non-energy programs manage income verification. The most common approach is to require proof through tax documents, pay stubs, or other formal income documentation, which can pose an impediment to enrolling eligible customers and create a paperwork burden for administrators. In order to reduce the burden for both the applicant and the program manager, some programs use alternative methods. We identify three common alternative verification methods: -Categorical eligibility: Customers enrolled in other, similar income-verified assistance programs are automatically eligible for enrollment in other income-qualified programs. -Geographic eligibility: Eligibility is based on the customer’s location within a specified area, typically a low-income or disadvantaged community or census tract, and; -“Self-attestation”: The participant claims eligibility with or without further documentation. We describe these options, their pros and cons, give examples of how they are used, and explore how some low-income programs address administrative issues, audits, or other quality control measures. Finally, we explore the risk of mistaken verifications (finding a participant eligible when they are not) in the different strategies. While this memo was initiated by a request relating to income-based community solar programs, the methods are applicable to any program with income eligibility requirements in the energy or non-energy sector. Funding was provided for this research by the Solar Energy Technologies Office of the US Department of Energy, through the National Community Solar Partnership.

14 SOLAR ENERGY↗

Gulf Petro Initiative

In this report, technologies for petroleum production and exploration enhancement in deepwater and mature fields are developed through basic and applied research by: (1) Designing new fluids to efficiently drill deepwater wells that can not be cost-effectively drilled with current technologies. The new fluids will be heavy liquid foams that have low-density at shallow dept to avoid formation breakdown and high density at drilling depth to control formation pressure. The goal of this project is to provide industry with formulations of new fluids for reducing casing programs and thus well construction cost in deepwater development. (2) Studying the effects of flue gas/CO{sub 2} huff n puff on incremental oil recovery in Louisiana oilfields bearing light oil. An artificial neural network (ANN) model will be developed and used to map recovery efficiencies for candidate reservoirs in Louisiana. (3) Arriving at a quantitative understanding for the three-dimensional controlled-source electromagnetic (CSEM) geophysical response of typical Gulf of Mexico hydrocarbon reservoirs. We will seek to make available tools for the qualitative, rapid interpretation of marine CSEM signatures, and tools for efficient, three-dimensional subsurface conductivity modeling.

02 PETROLEUM↗