Search NASA⌕ Search

SEARCH · Search NASA

Results for “requirements verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

Watts, Carly↗

Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

Anchondo, Ian↗

Guidelines for Verification Strategies to Minimize RISK Based on Mission Environment, -Application and -Lifetime (MEAL)

There is a trend of compromising verification testing to address the cost and schedule constraints, which poses a high-risk posture for programs/projects. Current and emerging aerospace scientific and/or human exploration programs continue to pose new technological challenges. These technological challenges combined with finite budgets and truncated schedules are forcing designers, scientists, engineers, and managers to push technologies to their physical limits. In addition, budget and schedule pressures challenge how those technologies/missions are verified. A clear understanding of the different verification processes is needed to ensure the proper verification of the technology within the mission (i.e., capabilities, advantages, and limitations). The goal of verification is to prove through test, analysis, inspection, and/or demonstration that a product provides its required function while meeting the performance requirements. It is important that verification yield understanding of representative performance under worst-case conditions so that margins to failure can be evaluated for proposed applications. The capabilities, advantages, and limitations of the testing and inspection performed at each level are different, and the risk incurred by omitting a verification step depends on the level of integration as well as Mission, Environment, Application and Lifetime (MEAL). This paper focuses on verification processes. The goal of the verification process is to ensure the given avionics technology could be safely implemented on the given MEAL consistent with the program/project risk posture.

Gonzalez, Oscar↗

Timing analysis by model checking

The safety of modern avionics relies on high integrity software that can be verified to meet hard real-time requirements. The limits of verification technology therefore determine acceptable engineering practice. To simplify verification problems, safety-critical systems are commonly implemented under the severe constraints of a cyclic executive, which make design an expensive trial-and-error process highly intolerant of change. Important advances in analysis techniques, such as rate monotonic analysis (RMA), have provided a theoretical and practical basis for easing these onerous restrictions. But RMA and its kindred have two limitations: they apply only to verifying the requirement of schedulability (that tasks meet their deadlines) and they cannot be applied to many common programming paradigms. We address both these limitations by applying model checking, a technique with successful industrial applications in hardware design. Model checking algorithms analyze finite state machines, either by explicit state enumeration or by symbolic manipulation. Since quantitative timing properties involve a potentially unbounded state variable (a clock), our first problem is to construct a finite approximation that is conservative for the properties being analyzed-if the approximation satisfies the properties of interest, so does the infinite model. To reduce the potential for state space explosion we must further optimize this finite model. Experiments with some simple optimizations have yielded a hundred-fold efficiency improvement over published techniques.

Naydich, Dimitri↗

Attitude Design for the LADEE Mission

The Lunar Atmosphere and Dust Environment Explorer (LADEE) satellite successfully completed its 148-day science investigation in a low-altitude, near-equatorial lunar orbit on April 18, 2014. The LADEE spacecraft was built, managed and operated by NASA's Ames Research Center (ARC). The Mission Operations Center (MOC) was located at Ames and was responsible for activity planning, command sequencing, trajectory and attitude design, orbit determination, and spacecraft operations. The Science Operations Center (SOC) was located at Goddard Space Flight Center and was responsible for science planning, data archiving and distribution. This paper details attitude design and operations support for the LADEE mission. LADEE's attitude design was shaped by a wide range of instrument pointing requirements that necessitated regular excursions from the baseline one revolution per orbit "Ram" attitude. Such attitude excursions were constrained by a number of flight rules levied to protect instruments from the Sun, avoid geometries that would result in simultaneous occlusion of LADEE's two star tracker heads, and maintain the spacecraft within its thermal and power operating limits. To satisfy LADEE's many attitude requirements and constraints, a set of rules and conventions was adopted to manage the complexity of this design challenge and facilitate the automation of ground software that generated pointing commands spanning multiple days of operations at a time. The resulting LADEE Flight Dynamics System (FDS) that was developed used Visual Basic scripts that generated instructions to AGI's Satellite Tool Kit (STK) in order to derive quaternion commands at regular intervals that satisfied LADEE's pointing requirements. These scripts relied heavily on the powerful "align and constrain" capability of STK's attitude module to construct LADEE's attitude profiles and the slews to get there. A description of the scripts and the attitude modeling they embodied is provided. One particular challenge analysts faced was in the design of LADEE maneuver attitudes. A flight rule requiring pre-maneuver verification of in-flight maneuver conditions by ground operators prior to burn execution resulted in the need to accommodate long periods in the maneuver attitude. This in turn complicated efforts to satisfy star tracker interference and communication constraints in lunar orbit. In response to this challenge, a graphical method was developed and used to survey candidate rotation angles about the thrust vector. This survey method is described and an example of its use on a particular LADEE maneuver is discussed. Finally, the software and methodology used to satisfy LADEE's attitude requirements are also discussed in the context of LADEE's overall activity planning effort. In particular, the way in which strategic schedules of instrument and engineering activities were translated into actual attitude profiles at the tactical level, then converted into precise quaternion commands to achieve those pointing goals is explained. In order to reduce the risk of time-consuming re-planning efforts, this process included the generation of long-term projections of constraint violation predictions for individual attitude profiles that could be used to establish keep-out time-frames for particular attitude profiles. The challenges experienced and overall efficacy of both the overall LADEE ground system and the attitude components of the Flight Dynamics System in meeting LADEE's varied pointing requirements are discussed.

LADEE↗

Automated Test for NASA CFS

The core Flight System (cFS) is a flight software (FSW) product line developed by the Flight Software Systems Branch (FSSB) at NASA's Goddard Space Flight Center (GSFC). The cFS uses compile-time configuration parameters to implement variable requirements to enable portability across embedded computing platforms and to implement different end-user functional needs. The verification and validation of these requirements is proving to be a significant challenge. This paper describes the challenges facing the cFS and the results of a pilot effort to apply EXB Solution's testing approach to the cFS applications.

Flight software↗

Software Tools to Support the Assessment of System Health

This presentation provides an overview of three software tools that were developed by the NASA Glenn Research Center to support the assessment of system health: the Propulsion Diagnostic Method Evaluation Strategy (ProDIMES), the Systematic Sensor Selection Strategy (S4), and the Extended Testability Analysis (ETA) tool. Originally developed to support specific NASA projects in aeronautics and space, these software tools are currently available to U.S. citizens through the NASA Glenn Software Catalog. The ProDiMES software tool was developed to support a uniform comparison of propulsion gas path diagnostic methods. Methods published in the open literature are typically applied to dissimilar platforms with different levels of complexity. They often address different diagnostic problems and use inconsistent metrics for evaluating performance. As a result, it is difficult to perform a one ]to ]one comparison of the various diagnostic methods. ProDIMES solves this problem by serving as a theme problem to aid in propulsion gas path diagnostic technology development and evaluation. The overall goal is to provide a tool that will serve as an industry standard, and will truly facilitate the development and evaluation of significant Engine Health Management (EHM) capabilities. ProDiMES has been developed under a collaborative project of The Technical Cooperation Program (TTCP) based on feedback provided by individuals within the aircraft engine health management community. The S4 software tool provides a framework that supports the optimal selection of sensors for health management assessments. S4 is structured to accommodate user ]defined applications, diagnostic systems, search techniques, and system requirements/constraints. One or more sensor suites that maximize this performance while meeting other user ]defined system requirements that are presumed to exist. S4 provides a systematic approach for evaluating combinations of sensors to determine the set or sets of sensors that optimally meet the performance goals and the constraints. It identifies optimal sensor suite solutions by utilizing a merit (i.e., cost) function with one of several available optimization approaches. As part of its analysis, S4 can expose fault conditions that are difficult to diagnose due to an incomplete diagnostic philosophy and/or a lack of sensors. S4 was originally developed and applied to liquid rocket engines. It was subsequently used to study the optimized selection of sensors for a simulation ]based aircraft engine diagnostic system. The ETA Tool is a software ]based analysis tool that augments the testability analysis and reporting capabilities of a commercial ]off ]the ]shelf (COTS) package. An initial diagnostic assessment is performed by the COTS software using a user ]developed, qualitative, directed ]graph model of the system being analyzed. The ETA Tool accesses system design information captured within the model and the associated testability analysis output to create a series of six reports for various system engineering needs. These reports are highlighted in the presentation. The ETA Tool was developed by NASA to support the verification of fault management requirements early in the Launch Vehicle process. Due to their early development during the design process, the TEAMS ]based diagnostic model and the ETA Tool were able to positively influence the system design by highlighting gaps in failure detection, fault isolation, and failure recovery.

Melcher, Kevin J.↗

S&MA Internship to Support Orion and the European Service Module

As a University Space Research Association (USRA) intern for NASA Johnson Space Center (JSC) during the summer 2016 work term, I worked on three main projects for the Space Exploration Division (NC) of the Safety and Mission Assurance (S&MA) Directorate. I worked on all three projects concurrently. One of the projects involved facilitating the status and closure of technical actions that were created during European Service Module (ESM) safety reviews by the MPCV Safety & Engineering Review Panel (MSERP). The two main duties included accurately collecting and summarizing qualitative data, and communicating that information to the European Space Agency (ESA) and Airbus (ESA's prime contractor) in a clear, succinct and precise manner. This project also required that I create a report on the challenges and opportunities of international S&MA. With its heavy emphasis on soft skills, this project taught me how to communicate better, by showing me how to present and share information in an easy-to-read and understandable format, and by showing me how to cooperate with and culturally respect international partners on a technical project. The second project involved working with the Orion Thermal Protection System (TPS) Process Failure Modes and Effects Analysis (PFMEA) Working Group to create the first full version of the Orion TPS PFMEA. The Orion TPS PFMEA Working Group met twice a week to analyze the Avcoat block installation process for failure modes, the failure modes effects, and how such failure modes could be controlled. I was in charge of implementing changes that were discussed in meeting, but were not implemented real time. Another major task included creating a significant portion of the content alongside another team member outside the two weekly meetings. This project caused me to become knowledgeable about TPS, heatshields, space-rated manufacturing, and non-destructive evaluation (NDE). The project also helped me to become better at working with a small team and helped improved my technical communication skills. My main duty for the third project was creating a Safety Verification Tracking Log (SVTL) for the Orbital Maneuvering System Engine (OMS-E), and contacting subject matter experts to close Hazard Report (HR) control verifications. This project also required me to support other OMS-E safety process tasks, like monitoring OMS-E vibration testing for Quality Assurance (QA) purposes. This project helped me become even more proficient in Excel. Throughout the project, I gained knowledge about the OMS-E system and improved my understanding of pressure systems and propellant systems. In terms of education goals, this work term has affirmed my desire to take a few more space-related courses, like orbital mechanics, so that I can have a better understanding of human spaceflight and the industry surrounding it. However, the work term did not persuade me to pursue a master's degree. In terms of career goals, this work term has helped me clarify the direction I would like to head in the future. The perspective of three summer terms working for NASA in S&MA has allowed me to observe that most S&MA employees joined S&MA after working in other NASA directorates, such as Engineering or Flight Operations. It is my belief that it would be advantageous for both NASA and I for me to broaden my knowledge base and technical skill set by completing hands-on technical work on human spaceflight projects, and for me to integrate my safety experience directly into technical work in other directorates. The other significant advantage to this proposed situation is that if I were to eventually return to S&MA, I would be returning with a substantial set of hands-on technical experience and knowledge, which would be a significant resource for S&MA tasks and projects.

Hutcheson, Connor↗

Electron/proton spectrometer certification documentation analyses

A compilation of analyses generated during the development of the electron-proton spectrometer for the Skylab program is presented. The data documents the analyses required by the electron-proton spectrometer verification plan. The verification plan was generated to satisfy the ancillary hardware requirements of the Apollo Applications program. The certification of the spectrometer requires that various tests, inspections, and analyses be documented, approved, and accepted by reliability and quality control personnel of the spectrometer development program.

Gleeson, P.↗

The Role of Integrated Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. System-level verification of critical optical performance requirements will rely on integrated modeling to a considerable degree. In turn, requirements for accuracy of the models are significant. The size of the lightweight observatory structure, coupled with the need to test at cryogenic temperatures, effectively precludes validation of the models and verification of optical performance with a single test in 1-g. Rather, a complex series of steps are planned by which the components of the end-to-end models are validated at various levels of subassembly, and the ultimate verification of optical performance is by analysis using the assembled models. This paper describes the critical optical performance requirements driving the integrated modeling activity, shows how the error budget is used to allocate and track contributions to total performance, and presents examples of integrated modeling methods and results that support the preliminary observatory design. Finally, the concepts for model validation and the role of integrated modeling in the ultimate verification of observatory are described.

Mosier, Gary E.↗

Coupled dynamics analysis of wind energy systems

A qualitative description of all key elements of a complete wind energy system computer analysis code is presented. The analysis system addresses the coupled dynamics characteristics of wind energy systems, including the interactions of the rotor, tower, nacelle, power train, control system, and electrical network. The coupled dynamics are analyzed in both the frequency and time domain to provide the basic motions and loads data required for design, performance verification and operations analysis activities. Elements of the coupled analysis code were used to design and analyze candidate rotor articulation concepts. Fundamental results and conclusions derived from these studies are presented.

Hoffman, J. A.↗

On achieving sufficient dual station range accuracy for deep space navigation at zero declination

Since the Voyager Mission will encounter Saturn at a time when the planet will be nearly in the earth's equatorial plane, earth-based orbit determination will be more difficult than usual because of the so-called zero-declination singularity associated with conventional radiometric observations. Simulation studies show that in order to meet the required delivery accuracy at Saturn, a relative range measurement between the Goldstone and Canberra Deep Space Stations must be accurate to 4.5 times the square root of two meters. Topics discussed include the nature of error sources, the methodology and technology required for calibration, the verification process concerning the nearly simultaneous range capability, a description of the ranging system, and tracking strategy.

Siegel, H. L.↗

Verification of Nimbus 4 BUV total ozone data and the requirements for operational satellite monitoring

Data obtained from the backscattering ultraviolet instrument on Nimbus 4 are compared with standardized observations such as ground based Dobson and M83 measurements. Results of the comparison are discussed and their impact on planning for a satellite ozone monitoring program is assessed. It is suggested that the satellite data be used as a transfer standard whereby, if a discrepancy in an individual ground station is detected, that station instrument would be noted for recalibration.

Miller, A. J.↗

Total main rotor isolation system analysis

Requirements, preliminary design, and verification procedures for a total main rotor isolation system at n/rev are presented. The fuselage is isolated from the vibration inducing main rotor at one frequency in all degrees of freedom by four antiresonant isolation units. Effects of parametric variations on isolation system performance are evaluated.

Sankewitsch, V.↗

Space station definition and preliminary design, WP-01. Volume 1: Executive summary

System activities are summarized and an overview of the system level engineering tasks performed are provided. Areas discussed include requirements, system test and verification, the advanced development plan, customer accommodations, software, growth, productivity, operations, product assurance and metrication. The hardware element study results are summarized. Overviews of recommended configurations are provided for the core module, the USL, the logistics elements, the propulsion subsystems, reboost, vehicle accommodations, and the smart front end. A brief overview is provided for costing activities.

Lenda, J. A.↗

Multibody modeling and verification

A summary of a ten week project on flexible multibody modeling, verification and control is presented. Emphasis was on the need for experimental verification. A literature survey was conducted for gathering information on the existence of experimental work related to flexible multibody systems. The first portion of the assigned task encompassed the modeling aspects of flexible multibodies that can undergo large angular displacements. Research in the area of modeling aspects were also surveyed, with special attention given to the component mode approach. Resulting from this is a research plan on various modeling aspects to be investigated over the next year. The relationship between the large angular displacements, boundary conditions, mode selection, and system modes is of particular interest. The other portion of the assigned task was the generation of a test plan for experimental verification of analytical and/or computer analysis techniques used for flexible multibody systems. Based on current and expected frequency ranges of flexible multibody systems to be used in space applications, an initial test article was selected and designed. A preliminary TREETOPS computer analysis was run to ensure frequency content in the low frequency range, 0.1 to 50 Hz. The initial specifications of experimental measurement and instrumentation components were also generated. Resulting from this effort is the initial multi-phase plan for a Ground Test Facility of Flexible Multibody Systems for Modeling Verification and Control. The plan focusses on the Multibody Modeling and Verification (MMV) Laboratory. General requirements of the Unobtrusive Sensor and Effector (USE) and the Robot Enhancement (RE) laboratories were considered during the laboratory development.

Wiens, Gloria J.↗

Design and Integration of a Rotor Alone Nacelle for Acoustic Fan Testing

A brief summary of the design, integration and testing of a rotor alone nacelle (RAN) in NASA Glenn's 9'x 15' Low Speed Wind Tunnel (LSWT) is presented. The purpose of the RAN system was to provide an "acoustically clean" flow path within the nacelle to isolate that portion of the total engine system acoustic signature attributed to fan noise. The RAN design accomplished this by removing the stators that provided internal support to the nacelle. In its place, two external struts mounted to a two-axis positioning table located behind the tunnel wall provided the support. Nacelle-mounted lasers and a closed-loop control system provided the input to the table to maintain nacelle to fan concentricity as thermal and thrust loads displaced the strut-mounted fan. This unique design required extensive analysis and verification testing to ensure the safety of the fan model, propulsion simulator drive rig, and facility, along with experimental consistency of acoustic data obtained while using the RAN system. Initial testing was used to optimize the positioning system and resulted in concentricity errors of +/- 0.0031 in. in the horizontal direction and +0.0035/-0.0013 in, in the vertical direction. As a result of successful testing, the RAN system will be transitioned into other acoustic research programs at NASA Glenn Research Center.

Shook, Tony D.↗