Search NASA⌕ Search

SEARCH · Search NASA

Results for “segmented mirrors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

The James Webb Space Telescope (JWST)

The James Webb Space Telescope (JWST) is a large aperture, cryogenic, infrared-optimized space observatory under construction by NASA for launch later this decade. The European and Canadian Space Agencies are mission partners. JWST will find and study the first galaxies that formed in the early universe and peer through dusty clouds to see star and planet formation at high spatial resolution. The breakthrough capabilities of JWST will enable new studies of star formation and evolution in the Milky Way, including the Galactic Center, nearby galaxies, and the early universe. JWST will have a segmented primary mirror, approximately 6.5 meters in diameter, and will be diffraction-limited at 2 microns. The JWST observatory will be placed in a L2 orbit by an Ariane 5 launch vehicle provided by ESA. The observatory is designed for a 5- year prime science mission, with consumables for 10 years of science operations.

Sonneborn, George↗

The James Webb Space Telescope: Science and Mission Status

The James Webb Space Telescope (JWST) is a large aperture, cryogenic, infrared-optimized space observatory under construction by NASA for launch later this decade. The European and Canadian Space Agencies are mission partners. JWST will find and study the first galaxies that formed in the early universe and peer through dusty clouds to see star and planet formation at high spatial resolution. The breakthrough capabilities of JWST will enable new studies of star formation and evolution in the Milky Way, including the Galactic Center, nearby galaxies, and the early universe. JWST will have a segmented primary mirror, approximately 6.5 meters in diameter, and will be diffraction-limited at 2 microns. The JWST observatory will be placed in a L2 orbit by an Ariane 5 launch vehicle provided by ESA. The observatory is designed for a 5- year prime science mission, with consumables for 10 years of science operations.

Sonneborn, George↗

Building the James Webb Space Telescope

The James Webb Space Telescope is the scientific successor to the Hubble and Spitzer Space Telescopes. It will be a large (6.6m) cold (50K) telescope launched into orbit around the second Earth-Sun Lagrange point. It is a partnership of NASA with the European and Canadian Space Agencies. JWST will make progress In almost every area of astronomy, from the first galaxies to form in the early universe to exoplanets and Solar System objects. Webb will have four instruments: The Near-Infrared Camera, the Near-Infrared multi-object Spectrograph, and the Near-Infrared Imager and Slitless Spectrograph will cover the wavelength range 0.6 to 5 microns, while the Mid-Infrared Instrument will do both imaging and spectroscopy from 5 to 28.5 microns. The observatory Is confirmed for launch in 2018; the design is complete and it is in its construction phase. Innovations that make JWST possible include large-area low-noise infrared detectors, cryogenic ASICs, a MEMS micro-shutter array providing multi-object spectroscopy, a non-redundant mask for interferometric coronagraphy and diffraction-limited segmented beryllium mirrors with active wavefront sensing and control. Recent progress includes the completion of the mirrors, the delivery of the first flight instruments and the start of the integration and test phase.

Gardner, Jonathan P.↗

Studies of Supernovae, SNR, and Dust with the James Webb Space Telescope

The james Webb Space Telescope (JWST) will provide breakthrough capabilities for the study of supernovae and supernova remnants, as well as many other science objectives. JWST is a large aperture, cryogenic, infrared-optimized general purpose space observatory under construction by NASA, ESA, and CSA for launch in 2018. The JWST instrumentation will provide imaging, coronagraphy, and spectroscopy between 6000A to 29 microns. This spectral region contains many atomic, molecular, and particulate diagnostics that are especially relevant for the study of dust formation. The spectroscopic capabilities include velocity resolution down to approx. 100 km/sec, a near-IR multi-object spectrograph with a approx. 3x3 arcmin field of view array of approx. 250,000 addressable shutters, and near-IR and mid-IR approx. 3x3 arcsec integral field units. The JWST telescope will have a 6.5m-diameter segmented primary mirror and will be diffraction-limited at 2 microns (PSF FWHM - 0.07 arcsec). The imaging and spectroscopic sensitivities will be about 100x lower than previous capabilities in the near- and mid-IR. The JWST observatory will be placed in a L2 orbit by an Ariane 5 launch vehicle provided by ESA. The JWST telescope and instruments will be passively cooled to approx. 40K by a sunshield that will be unfolded after launch. The sunshield geometry limits the JWST pointing on the sky to be between 85 deg and 135 deg from the Sun. The observatory is designed for a 5-year prime science mission, with consumables for 10 years of science operations, and a Target of Opportunity response time of 48 hours.

Sonneborn, George↗

James Webb Space Telescope: Large Deployable Cryogenic Telescope in Space

The James Webb Space Telescope (JWST) is an infrared space telescope designed to explore four major science themes: first light and reionization, the assembly of galaxies, the birth of stars and protoplanetary systems, and planetary systems and origins of life. JWST is a segmented architecture telescope with an aperture of 6.6 m. It will operate at cryogenic temperature (40 K), achieved via passive cooling, in an orbit about the Earth-Sun second Lagrange point (L2). Passive cooling is facilitated by means of a large sunshield that provides thermal isolation and protection from direct illumination from the Sun. The large size of the telescope and spacecraft systems require that they are stowed for launch in a configuration that fits the Ariane 5 fairing, and then deployed after launch. Routine wavefront sensing and control measurements are used to achieve phasing of the segmented primary mirror and initial alignment of the telescope. A suite of instruments will provide the capability to observe over a spectral range from 0.6- to 27-micron wavelengths with imaging and spectroscopic configurations. An overview is presented of the architecture and selected optical design features of JWST are described

Lightsey, Paul A.↗

Shack-Hartmann Phasing of Segmented Telescopes: Systematic Effects from Lenslet Arrays

The segments in the Keck telescopes are routinely phased using a Shack-Hartmann wavefront sensor with sub-apertures that span adjacent segments. However, one potential limitation to the absolute accuracy of this technique is that it relies on a lenslet array (or a single lens plus a prism array) to form the subimages. These optics have the potential to introduce wavefront errors and stray reflections at the subaperture level that will bias the phasing measurement. We present laboratory data to quantify this effect, using measured errors from Keck and two other lenslet arrays. In addition, as part of the design of the Thirty Meter Telescope Alignment and Phasing System we present a preliminary investigation of a lenslet-free approach that relies on Fresnel diffraction to form the subimages at the CCD. Such a technique has several advantages, including the elimination of lenslet aberrations.

segmented mirrors↗

Demonstrating Broadband Billion-to-One Contrast with the Visible Nulling Coronagraph

The key to broadband operation of the Visible Nulling Coronagraph (VNC) is achieving a condition of quasi- achromatic destructive interference between combined beams. Here we present efforts towards meeting this goal using Fresnel rhombs in each interferometric arm as orthogonally aligned half wave phase retarders. The milestone goal of the demonstration is to achieve 1 × 10−9 contrast at 2/D over a 40 nm bandpass centered at 633 nm. Rhombs have been designed and fabricated, and a multi-step approach to alignment using coarse positioners for each rhomb and pair has been developed to get within range of piezo stages used for fine positioning. The previously demonstrated narrowband VNC sensing and control approach that uses a segmented deformable mirror is being adapted to broadband to include fine positioning of the piezo-mounted rhombs, all demonstrated in a low-pressure environment.

Visible Nulling Coronagraph (VNC)↗

Augmented Method to Improve Thermal Data for the Figure Drift Thermal Distortion Predictions of the JWST OTIS Cryogenic Vacuum Test

The JWST Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and is scheduled for launch in 2018. The JWST OTE, including the 18 segment primary mirror, secondary mirror, and the Aft Optics Subsystem (AOS) are designed to be passively cooled and operate near 45K. These optical elements are supported by a complex composite backplane structure. As a part of the structural distortion model validation efforts, a series of tests are planned during the cryogenic vacuum test of the fully integrated flight hardware at NASA JSC Chamber A. The successful ends to the thermal-distortion phases are heavily dependent on the accurate temperature knowledge of the OTE structural members. However, the current temperature sensor allocations during the cryo-vac test may not have sufficient fidelity to provide accurate knowledge of the temperature distributions within the composite structure. A method based on an inverse distance relationship among the sensors and thermal model nodes was developed to improve the thermal data provided for the nanometer scale WaveFront Error (WFE) predictions. The Linear Distance Weighted Interpolation (LDWI) method was developed to augment the thermal model predictions based on the sparse sensor information. This paper will encompass the development of the LDWI method using the test data from the earlier pathfinder cryo-vac tests, and the results of the notional and as tested WFE predictions from the structural finite element model cases to characterize the accuracies of this LDWI method.

Thermal Modeling↗

Optical Budgeting for LUVOIR

Future large astronomical telescopes in space will have architectures that will have complex and demanding requirements to meet the science goals. The Large UV/Optical/IR Surveyor (LUVOIR) mission concept being assessed by the NASA/Goddard Space Flight Center is expected to be 8 to 16 meters in diameter, have a segmented primary mirror, active control, and be diffraction limited at a wavelength of 500 nanometers. The optical stability is expected to be in the picometer range for minutes to hours. Architecture studies to support the NASA Science and Technology Definition teams (STDTs) are underway to evaluate systems performance. A wave front error budget has been developed to help define the technology needs and assess performance. The budget includes both spatial and temporal domain aspects for the active, adaptive and passive elements in the optical design.

space telescopes↗

On-Orbit Thermal Performance of a Submillimeter Telescope Primary Reflector Panel

A detailed thermal analysis has been performed for a panel of a segmented primary mirror which is closest to the high side of the telescope sunshade. This panel was selected because the spatial temperature distribution was expected to be the worst. The JPL90-10 primary reflector panel configuration was investigated because of its superior figure error performance in ground-based testing.

SMILS↗

Toward a NASA Deep Space Optical Communications System

As discussed at SpaceOps in 2016, we expect the data rates from deep space missions to increase approximately one order of magnitude per decade for the next 50 years. The first order of magnitude improvement will come from existing plans for radio frequency (RF) communications including enhancements to both spacecraft and Deep Space Network (DSN) facilities. The next two orders of magnitude are predicted to come from the introduction of deep space optical communications. Studies indicate that optical receive apertures of between 8m12m are desired. The large cost of dedicated receive telescopes makes this method unrealistic – at least in the near-term. The cost of large optical ground terminals is driven primarily by the cost of the optics and by the cost of a stable structure for the telescope. We propose a novel hybrid design in which existing DSN 34m beam waveguide (BWG) radio antennas can be modified to include an 8m equivalent optical primary. By utilizing a low-cost segmented spherical mirror optical design, pioneered by the optical astronomical community, and by exploiting the already existing extremely stable large radio aperture structures in the DSN, we can minimize both of these cost drivers for implementing large optical communications ground terminals. Two collocated hybrid RF/optical antennas could be arrayed to synthesize the performance of an 11.3m receive aperture to support more capable or more distant space missions or used separately to communicate with two optical spacecraft simultaneously. NASA is in the midst of building six new 34m BWG antennas in the DSN. The final two are planned to be built at the DSN Goldstone, California and Canberra complexes. We are now investigating building these last two antennas as RF/optical hybrids. By delaying their operational dates by two years, we would be able to add the 8m optical receive capability for these two antennas while fitting within existing budgetary constraints. This paper describes the hybrid antenna design, the technical challenges being addressed, and plan for using this concept, together with ongoing work on optical flight terminals, to infuse operation optical communications into deep space missions.

Cornwell, Donald M.↗

HabEx Lite: a Starshade-only Habitable Exoplanet Imager Alternative

The HabEx mission concept is intended to directly image planetary systems around nearby stars, and to perform a wide range of general astrophysics and solar system observations. Its main goal is the discovery and characterization of Earthlike exoplanets through high-contrast imaging and spectroscopy. The baseline HabEx concept would use both a coronagraph and a starshade for exoplanet science. We describe an alternative, “HabEx Lite” concept, which would use a starshade (only) for exoplanet science. The benefit is lower cost: by deleting the complex coronagraph instrument; by lowering observatory mass; by relaxing tolerances and stability requirements; by permitting use of a compact on-axis telescope design; by use of a smaller launch vehicle. The scientific penalty of this lower cost option is a smaller number of detected exoplanets of all types, including exoEarth candidates, and a smaller fraction of exoplanets with measured orbits. Our approach uses a non-deployed segmented primary mirror, whose manufacture is within current capabilities.

Stark, Chris↗

Status of the James Webb Space Telescope Mission

The James Webb Space Telescope ( Webb) is the largest space telescope realized to-date, with a 6.5 m segmented primary mirror that must be folded to fit within its Ariane 5 launcher fairing. This infrared telescope is passively cooled using a five-layer sunshield that will keep the optical telescope and its four science instruments in the shade throughout the lifetime of the mission in an L2 orbit. Webb's science instruments include near- and mid­ infrared imagers and spectrometers that cover the spectral range from 0.6-28.5 µm. The Webb mission has a long history with numerous first of its kind technology developments, ground support equipment innovations, and algorithmic characterization advances. This conference proceeding summarizes the technical progress over the past two years, from the Spacecraft Element environmental testing to the Observatory integration and testing, and the final Observatory test plans leading up to launch, on-orbit commissioning, and science operations.

Michael W McElwain↗

The James Webb Space Telescope Mission Status

The James Webb Space Telescope (Webb) is a large, infrared space telescope that recently completed its on-orbit commissioning activities and will now embark on the first year of approved science. Its architecture includes many first-of-its-kind innovations for space, including a segmented primary mirror that is 6.6 m in diameter and a 5-layer sunshield used to passively cool the telescope and its four science instruments. Although Webb had an extensive test program, the system-level performance often relied on predictions based on integrated modeling, using conservative factors for the model uncertainties and primarily focusing on evaluating the performance requirements at end of life. A set of commissioning activities were designed for a system-level characterization of the performance. This proceeding will provide the status of the mission, including a discussion of the major events, on-orbit system performance, and early science highlights.

Michael McElwain↗

Obtaining cryogenic molecular transport data for analysis

The James Webb Space Telescope (JWST) has a primary mirror, made of 18 segments, and a secondary mirror (SM) that are used to direct the light of desired targets. While on orbit, the secondary mirror assembly (SMA) was stowed for approximately 10 days and was subject to molecular contamination outgassing from the cavity of the secondary mirror support structure (SMSS) in-board hinge (IBH) which contains cables, motors, resolvers, and coatings. The main concern during this period before SMA deployment is the accumulation of ice due to the lack of a heater on the SMA. The temperature differentials between the IBH surfaces and SMA could cause redistribution of contaminants. To address this concern, single layer insulation (SLI) was used to create adequate venting and path redirection of outgassing from the IBH. Two separate thermal vacuum tests were performed to quantify this contamination: one Z307 ASTM E 1559 materials test of the radiator paint used on the motor of the IBH and a separate test on a primary mirror backplane assembly (PMBA) qualification engineering test unit (ETU) of the IBH. These tests approximately followed the predicted SMA pre-deployment thermal environment. To quantify source rates in case of a leak, the motor and resolver sides were separated and quartz crystal microbalances (QCM) were used to measure the deposition of water. The SLI redesign and implementation and outgassing measurements to understand leak effects from the IBH were essential to mitigate the deposition of contamination on the SMA.

James Webb Space Telescope, contamination, cleanro↗