Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Missions/Planning Panel

A panel discussion was held to develop a viewpoint of space power technology needs and state of readiness for future mission scenarios. Among the points made in the discussion, it was agreed that missions, particularly the far term ones, do serve to drive technology; however, as the missions become nearer term, issues of schedule and cost severely limit the willingness to accept risk. There are, in fact, no rewards to a mission manager for introducing new technology. Mission downscaling is the usual response to technology limitations. All panelists agreed that there exists a serious gap between when technologists feel their job is done and what mission managers need for decision. Typically a two to three year engineering development gap exists. It is essential to take technologies to the engineering model level and conduct a flight demonstration to close this gap. All agreed that increased effort should be made to achieve stronger interactions between planners and technologists and that workshops like the present one are a step in the right direction. Technologists need mission credibility and vice versa.

Fordyce, J. S.↗

Research needs for a commercial passenger tiltrotor

The National Aeronautics and Space Administration (NASA) recently completed a series of contracts and studies that examined the technology needs for a tiltrotor aircraft in commercial service as well as military missions. The commercial needs arise out of market-driven requirements that include vertiport location and design, passenger comfort levels and competitive costs. The military needs are derived from time-sensitive missions and combat effectiveness. In response to these results, NASA has decided to address the commercial needs first, recognizing that there will be eventual payoff to military missions as well. Research goals were explored in acoustics, flight dynamics, human factors and displays, dynamics and loads, propulsion, safety, and configuration design. The paper describes the development of these goals from the market requirements and the implications for possible research activities. The aircraft issues that were addressed include number of blades, advanced blade planforms, steep approach requirements and pilot-cockpit interface for civil operations.

Unger, George↗

Technology and Innovation Roadmap

This Technology and Innovation Roadmap outlines the Hanford Tank Waste Operations & Closure, LLC (H2C) strategic approach for advancing the Hanford Tank Waste Treatment Mission (HTWTM) through technology development. Our focus is on addressing technology needs that address risks, enhance efficiency, ensure worker safety, and uphold environmental standards. This Roadmap identifies key technology initiatives essential for the successful completion of the Hanford Site tank waste cleanup. Updated annually, it incorporates insights from the U.S. Department of Energy (DOE), the Integrated Tank Disposition Contractor (ITDC) H2C, recognized national lab experts, and fieldwork specialists. The Roadmap includes approximately 100 technology elements, each detailed in Technology Element Description Summaries (TEDS) and summarized in catalog sheets. These elements are crucial for aligning technology development activities with mission objectives across the HTWTM. With the initiation of the Direct-Feed Low-Activity Waste (DFLAW) program and the operation of the Tank Side Cesium Removal (TSCR) system, our focus now shifts to the support of scaled up production in East Area; applying similar and exploring new treatment alternatives to West Area Tank Waste; and advancing retrieval, delivery and treatment technologies for waste managed as high-level waste (HLW) across the Hanford tank farms. This transition is reflected in the technology and maturation (TM&E) charts, which highlight the evolving technology priorities. This document serves as a guide for navigating the challenges and opportunities in technology development at the Hanford Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Materials and Manufacturing Technologies (AMMT) 2025 Roadmap

The mission of the Advanced Materials and Manufacturing Technologies (AMMT) program is to accelerate the development, qualification, demonstration, and deployment of advanced materials and manufacturing technologies in support of the United States (US) leadership in a broad range of nuclear energy applications. The vision of the AMMT program is the expansion of reliable and economical nuclear energy enabled by advanced materials and manufacturing technologies. Four major goals were set to realize the mission and vision of the AMMT program, including: (1) develop advanced materials and manufacturing technologies that have cross-reactor applications, (2) establish and demonstrate a rapid qualification framework that supports diverse materials and manufacturing technology needs, (3) evaluate materials performance in a range of nuclear environments, and (4) accelerate commercialization of new technologies through technology maturation. The program is designed to deliver solutions that support a wide range of reactor technologies.

36 MATERIALS SCIENCE↗

An engineering research and technology program for an evolving, multi-decade Mission to Planet Earth

A study is presented that examines the technological needs of future systems, surveys current and planned activities and highlights significant accomplishments in the research and technology program of the multidecade Mission to Planet Earth (MTPE). Consideration is given to recent program redirection in MTPE, the initiation of the high performance computing and communications program and the potential impact on the technology programs. The technology set is divided into three subsets covering information, observation, and infrastructure technologies.

Sadin, Stanley R.↗

Nuclear electric propulsion for planetary science missions: NASA technology program planning

This paper presents the status of technology program planning to develop those Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies with significant development heritage: ion electric propulsion and the SP-100 space nuclear power technologies. Detailed plans are presented for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities.

Doherty, Michael P.↗

Design Consideration on the ACTS T1-VSAT

The Advanced Communications Technology Satellite (ACTS) was developed by NASA as an experimental platform to demonstrate to industry the high risk technologies need for the next generation of communication satellites. The ACTS contains many state-of-the-art technologies including time division multiple accessing, adaptive error correction coding, multiple electronically steerable hopping beam antennas, spectrally efficient SMSK modulation, demand assignment multiple access protocol and on-board baseband circuit switching. An integral part of this testbed is the ACTS T1-very small aperture terminal (VSAT). The requirements imposed on the T1-VSAT demanded numerous design tradeoffs; balancing risk, cost, and implementation. Some of these considerations include: the method used for determining link quality, the development of a low cost and reliable Ka-band high power amplifier, the integration and testing environment for use in development and production and the low cost signal processing solution to high rate burst data. This paper discusses the tradeoffs considered in the selected implementation and the results obtained over the past two years of operation. Recommendations for improvements are also included.

Lilley, Richard D.↗

High End Computing Technologies for Earth Science Applications: Trends, Challenges, and Innovations

Earth science applications of the future will stress the capabilities of even the highest performance supercomputers in the areas of raw compute power, mass storage management, and software environments. These NASA mission critical problems demand usable multi-petaflops and exabyte-scale systems to fully realize their science goals. With an exciting vision of the technologies needed, NASA has established a comprehensive program of advanced research in computer architecture, software tools, and device technology to ensure that, in partnership with US industry, it can meet these demanding requirements with reliable, cost effective, and usable ultra-scale systems. NASA will exploit, explore, and influence emerging high end computing architectures and technologies to accelerate the next generation of engineering, operations, and discovery processes for NASA Enterprises. This article captures this vision and describes the concepts, accomplishments, and the potential payoff of the key thrusts that will help meet the computational challenges in Earth science applications.

Parks, John↗

Future Interagency Range and Spaceport Technologies (FIRST) Formulation Products: 1. Transformational Spaceport and Range Concept of Operations. 2. F.I.R.S.T. Business Case Analysis

The Baseline Report captures range and spaceport capabilities at five sites: KSC, CCAFS, VAFB, Wallops, and Kodiak. The Baseline depicts a future state that relies on existing technology, planned upgrades, and straight-line recapitalization at these sites projected through 2030. The report presents an inventory of current spaceport and range capabilities at these five sites. The baseline is the first part of analyzing a business case for a set of capabilities designed to transform U.S. ground and space launch operations toward a single, integrated national "system" of space transportation systems. The second part of the business case compares current capabilities with technologies needed to support the integrated national "system". The final part, a return on investment analysis, identifies the technologies that best lead to the integrated national system and reduce recurring costs..Numerous data sources were used to define and describe the baseline spaceport and range by identifying major systems and elements and describing capabilities, limitations, and capabilities

Source record↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan details the strategy, mission, scope, and goals—both near-term and long-term—along with the structure and organization of nuclear fuels and materials research, development, and demonstration (RD&D) activities within the Fuel Cycle Technologies (FCT) program. The FCT program, tasked by the U.S. Department of Energy (DOE), employs a science-based approach to advance fuel technologies. This approach integrates theory, experiments, and multi-scale modeling and simulation (M&S) to develop a predictive understanding of fuel fabrication processes and fuel/cladding performance under irradiation, moving beyond traditional empirical methods. The long-term goals of the AFC are guided by the AFC Strategic Plan and align with the DOE Office of Nuclear Energy (NE) Roadmap [1], which outlines a multi-decade vision for demonstrating and qualifying advanced fuel forms to support diverse fuel cycle options. Near-term goals focus on enhancing accident tolerant fuels (ATF) for Light Water Reactors (LWR), a significant challenge that demands balancing immediate objectives with ongoing progress toward advanced reactor missions. Accelerating the traditional fuel qualification process to meet ATF objectives is another critical challenge. A detailed set of 5-year goals, summarized below, has been developed in line with the overarching science-based fuel development approach: • Advanced LWR Fuel Technologies: By 2027, support the development of advanced LWR fuel technologies with improved performance and enhanced accident tolerance. This includes high burnup (HBu), low enriched uranium (LEU)+, coated cladding, and doped fuel, aimed at complementing industry-led significant LWR uprates and plant refurbishments. • Tristructural Isotropic (TRISO) Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Metal Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Molten Salt Fuel: By 2027, deploy a robust program that enables fuel salt qualification technologies needed to support fuel salt research and development (R&D), focusing on emergent needs to derisk fuel salt production and utilization in advanced reactors. • Long-Term ATF: Develop fuel technologies that enable significant power uprates (~50%) in refurbished or new LWRs while optimizing fissile material utilization and waste disposal. The 5-year milestones in the AFC Execution Plan are contingent on an assumed budget. This Execution Plan will be updated annually to reflect actual funding profiles as budget guidance becomes available, ensuring milestones are adjusted accordingly. In summary, the AFC Execution Plan presents a comprehensive strategy to advance nuclear fuel technologies through a science-based approach, addressing both near-term and long-term goals while adapting to funding realities.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solar Electric Propulsion

The National Aeronautics and Space Administration's New Millennium Program (NMP) is a space flight technology demonstration program that will validate the technologies needed to carry out the Earth and space science missions NASA envisions for the 21(sup st) century. The program is employing an innovative decision-making process to select the specific technologies that will be flight validated. First, NMP has articulated NASA's vision of science exploration for the next century, then it has defined the capabilities needed to execute that vision, and finally it will select and demonstrate the revolutionary technologies that provide those capabilities, thus enabling the science vision.

New Millennium New Millennium Program NMP space fl↗

Black Holes, Worm Holes, and Future Space Propulsion

NASA has begun examining the technologies needed for an Interstellar Mission. In 1998, a NASA Interstellar Mission Workshop was held at the California Institute of Technology to examine the technologies required. Since then, a spectrum of research efforts to support such a mission has been underway, including many advanced and futuristic space propulsion concepts which are being explored. The study of black holes and wormholes may provide some of the breakthrough physics needed to travel to the stars. The first black hole, CYGXI, was discovered in 1972 in the constellation Cygnus X-1. In 1993, a black hole was found in the center of our Milky Way Galaxy. In 1994, the black hole GRO J1655-40 was discovered by the NASA Marshall Space Flight center using the Gamma Ray Observatory. Today, we believe we have found evidence to support the existence of 19 black holes, but our universe may contain several thousands. This paper discusses the dead star states - - both stable and unstable, white dwarfs, neutron stars, pulsars, quasars, the basic features and types of black holes: nonspinning, nonspinning with charge, spinning, and Hawking's mini black holes. The search for black holes, gravitational waves, and Laser Interferometer Gravitational Wave Observatory (LIGO) are reviewed. Finally, concepts of black hole powered space vehicles and wormhole concepts for rapid interstellar travel are discussed in relation to the NASA Interstellar Mission.

Barret, Chris↗

EM-Enhanced HyPOR Loop for Fast Fusion Cycles

Vacuum pumps are the heart of a fusion energy facility – fusion power cannot be generated without them. Nevertheless, the vacuum technology needed to operate a viable fuel cycle for a compact fusion power plant does not exist. Commercial vacuum technology offers the best solution to this challenge, but a pump oil recycling and detritiation system is necessary. Conventional oil detritiation processes have only been developed to deal with legacy waste and are too slow and destructive to the oil. Further, post hoc detritiation strategies are intrinsically inefficient. Our approach is to rethink the challenge holistically by designing the pumping fluid and tritium extraction system in an integrated manner to achieve an innovative solution. By selecting an oil for the specific task of pumping tritium and then designing our catalytic system to selectively target the tritium-bearing functional groups, an effective detritiation system (hydrocarbon pump oil recycling, HyPOR, loop) for fusion power plants can be obtained. The project demonstrated a HyPOR loop process that can selectively remove heavier hydrogen isotopes from pump oil, reaching the target of 99.5 % removal, with an uptake of less than 0.01% of tritium throughput, while also purifying the oil of radiation-induced damage. The recycled oil retained its pumping characteristics over 7 recycles and gamma irradiation over 30 MGy. By meeting these targets, the project enable a reduction in pump operational costs from $\$$14.5M/year to $\$$103k/year (>140× reduction), reducing pump electric power consumption from 2.8 MW to 0.25 MW (>10× reduction), and reducing in-process tritium inventory from 2.03 kg to 0.48 kg (>4× reduction).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

High-Purity Aluminum Magnet Technology for Advanced Space Transportation Systems

Basic research on advanced plasma-based propulsion systems is routinely focused on plasmadynamics, performance, and efficiency aspects while relegating the development of critical enabling technologies, such as flight-weight magnets, to follow-on development work. Unfortunately, the low technology readiness levels (TRLs) associated with critical enabling technologies tend to be perceived as an indicator of high technical risk, and this, in turn, hampers the acceptance of advanced system architectures for flight development. Consequently, there is growing recognition that applied research on the critical enabling technologies needs to be conducted hand in hand with basic research activities. The development of flight-weight magnet technology, for example, is one area of applied research having broad crosscutting applications to a number of advanced propulsion system architectures. Therefore, NASA Marshall Space Flight Center, Louisiana State University (LSU), and the National High Magnetic Field Laboratory (NHMFL) have initiated an applied research project aimed at advancing the TRL of flight-weight magnets. This Technical Publication reports on the group's initial effort to demonstrate the feasibility of cryogenic high-purity aluminum magnet technology and describes the design, construction, and testing of a 6-in-diameter by 12-in-long aluminum solenoid magnet. The coil was constructed in the machine shop of the Department of Physics and Astronomy at LSU and testing was conducted in NHMFL facilities at Florida State University and at Los Alamos National Laboratory. The solenoid magnet was first wound, reinforced, potted in high thermal conductivity epoxy, and bench tested in the LSU laboratories. A cryogenic container for operation at 77 K was also constructed and mated to the solenoid. The coil was then taken to NHMFL facilities in Tallahassee, FL. where its magnetoresistance was measured in a 77 K environment under steady magnetic fields as high as 10 T. In addition, the temperature dependence of the coil's resistance was measured from 77 to 300 K. Following this series of tests, the coil was transported to NHMFL facilities in Los Alamos, NM, and pulsed to 2 T using an existing capacitor bank pulse generator. The coil was completely successful in producing the desired field without damage to the windings.

Goodrich, R. G.↗

Technology Investment Agendas to Expand Human Space Futures

The paper develops four alternative core-technology advancement specifications, one for each of the four strategic goal options for government investment in human space flight. Already discussed in the literature, these are: Explore Mars; Settle the Moon; accelerate commercial development of Space Passenger Travel; and enable industrial scale-up of Space Solar Power for Earth. In the case of the Explore Mars goal, the paper starts with the contemporary NASA accounting of ?55 Mars-enabling technologies. The analysis decomposes that technology agenda into technologies applicable only to the Explore Mars goal, versus those applicable more broadly to the other three options. Salient technology needs of all four options are then elaborated to a comparable level of detail. The comparison differentiates how technologies or major developments that may seem the same at the level of budget lines or headlines (e.g., heavy-lift Earth launch) would in fact diverge widely if developed in the service of one or another of the HSF goals. The paper concludes that the explicit choice of human space flight goal matters greatly; an expensive portfolio of challenging technologies would not only enable a particular option, it would foreclose the others. Technologies essential to enable human exploration of Mars cannot prepare interchangeably for alternative futures; they would not allow us to choose later to Settle the Moon, unleash robust growth of Space Passenger Travel industries, or help the transition to a post-petroleum future with Space Solar Power for Earth. The paper concludes that a decades-long decision in the U.S.--whether made consciously or by default--to focus technology investment toward achieving human exploration of Mars someday would effectively preclude the alternative goals in our lifetime.

human space flight↗

Marshall Space Flight Center Research and Technology Report 2019

Today, our calling to explore is greater than ever before, and here at Marshall Space Flight Center—we make human deep space exploration possible. A key goal for Artemis is demonstrating and perfecting capabilities on the Moon for technologies needed for humans to get to Mars. This year’s report features 10 of the Agency’s 16 Technology Areas, and I am proud of Marshall’s role in creating solutions for so many of these daunting technical challenges. Many of these projects will lead to sustainable in-space architecture for human space exploration that will allow us to travel to the Moon, on to Mars, and beyond. Others are developing new scientific instruments capable of providing an unprecedented glimpse into our universe. NASA has led the charge in space exploration for more than six decades, and through the Artemis program we will help build on our work in low Earth orbit and pave the way to the Moon and Mars. At Marshall, we leverage the skills and interest of the international community to conduct scientific research, develop and demonstrate technology, and train international crews to operate further from Earth for longer periods of time than ever before— first at the lunar surface, then on to our next giant leap, human exploration of Mars. While each project in this report seeks to advance new technology and challenge conventions, it is important to recognize the diversity of activities and people supporting our mission. This report not only showcases the Center’s capabilities and our partnerships, it also highlights the progress our people have achieved in the past year. These scientists, researchers and innovators are why Marshall and NASA will continue to be a leader in innovation, exploration, and discovery for years to come.

Dankanich, John W.↗

The future of very large subsonic transports

The Very Large Subsonic Transport (VLST) is a multi-use commercial passenger, commercial cargo, and military airlifter roughly 50% larger than the current Lockheed C-5 and Boeing 747. Due to the large size and cost of the VLST, it is unlikely that the commercial market can support more than one aircraft production line, while declining defense budgets will not support a dedicated military VLST. A successful VLST must therefore meet airline requirements for more passenger and cargo capacity on congested routes into slot-limited airports and also provide a cost effective heavy airlift capacity to support the overseas deployment of US military forces. A successful VLST must satisfy three key missions: commercial passenger service with nominal seating capacity at a minimum of 650 passengers with a range capability of 7,000 to 10,000 miles; commercial air cargo service for containerized cargo to support global manufacturing of high value added products, 'just-in-time' parts delivery, and the general globalization of trade; and military airlift with adequate capacity to load current weapon systems, with minimal break-down, over global ranges (7,000 to 10,000 miles) required to reach the operational theater without need of overseas bases and midair refueling. The development of the VLST poses some technical issues specific to large aircraft, but also key technologies applicable to a wide range of subsonic transport aircraft. Key issues and technologies unique to the VLST include: large composite structures; dynamic control of a large, flexible structure; aircraft noise requirements for aircraft over 850,000 pounds; and increased aircraft separation due to increased wake vortex generation. Other issues, while not unique to the VLST, will critically impact the ability to build an efficient and affordable aircraft include: active control systems: Fly-By-Light/Power-By-Wire (FBL/PBW); high lift systems; flight deck associate systems; laminar flow; emergency egress; and modular design. The VLST will encounter severe restrictions on weight, ground flotation, span, length, and door height to operate at current airports/bases, gates, and cargo loading systems. One option under consideration is for a sea-based VLST, either a conventional seaplane or Wing-In-Ground effect (WIG) vehicle, which would allow greater operational flexibility, while introducing other design challenges such as water impact loads and salt-water corrosion. Lockheed Martin is currently developing a floatplane version of the C-130 Hercules which will provide experience with a modern sea-based aircraft. In addition to its own ongoing research activities, Lockheed Martin is also participating in the NASA Advanced Subsonic Technology, High Speed Research (HSR), and other programs which address some of the technologies needed for the VLST. The VLST will require NASA and US aerospace companies to work together to develop new capabilities and technologies for make the VLST a viable part of transportation beyond 2000.

Justice, R. Steven↗

Information data systems for a global change technology initiative architecture trade study

The Global Change Technology Initiative (GCTI) was established to develop technology which will enable use of satellite systems of Earth observations on a global scale, enable use of the observations to predictively model Earth's changes, and provide scientists, government, business, and industry with quick access to the resulting information. At LaRC, a GCTI Architecture Trade Study was undertaken to develop and evaluate the architectural implications to meet the requirements of the global change studies and the eventual implementation of a global change system. The output of the trade study are recommended technologies for the GCTI. That portion of the study concerned with the information data system is documented. The information data system for an earth global change modeling system can be very extensive and beyond affordability in terms of today's costs. Therefore, an incremental approach to gaining a system is most likely. An options approach to levels of capability versus needed technologies was developed. The primary drivers of the requirements for the information data system evaluation were the needed science products, the science measurements, the spacecraft orbits, the instruments configurations, and the spacecraft configurations and their attendant architectures. The science products requirements were not studied here; however, some consideration of the product needs were included in the evaluation results. The information data system technology items were identified from the viewpoint of the desirable overall information system characteristics.

Murray, Nicholas D.↗