Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

RELAP5-3D Modeling of High Temperature Test Facility (HTTF)

HTTF at Oregon State University (OSU) Reference: General Atomics? modular high-temperature gas-cooled reactor Helium cooled, electrically heated Prismatic graphite blocks in the core and reflectors Alumina ceramic blocks are used to simulate the core and top and bottom reflectors One-fourth scale in length and diameter Most of the coolant channels in the core are full scale Lower pressure compared to the prototype reactor Over 500 instruments Designed primarily to investigate depressurized conduction cooldown (DCC) transients

97 MATHEMATICS AND COMPUTING↗

In-vacuum sensors for the beamline components of the ITER neutral beam test facility

Embedded sensors have been designed for installation on the components of the MITICA beamline, the prototype ITER neutral beam injector (Megavolt ITER Injector and Concept Advancement), to derive characteristics of the particle beam and to monitor the component conditions during operation for protection and thermal control. Along the beamline, the components interacting with the particle beam are the neutralizer, the residual ion dump, and the calorimeter. The design and the positioning of sensors on each component have been developed considering the expected beam-surface interaction including non-ideal and off-normal conditions. The arrangement of the following instrumentation is presented: thermal sensors, strain gages, electrostatic probes including secondary emission detectors, grounding shunt for electrical currents, and accelerometers.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Scanning electron microscopy examination of a Fast Flux Test Facility irradiated U-10Zr fuel cross section clad with HT-9

Observations from a scanning electron microscopy examination of irradiated U-10Zr fuel are presented. The sample studied had a local burnup of 5.7 atom percent and a local inner cladding temperature of 615°C. This examination by electron microscopy has concentrated on producing data relevant to facilitating a better understanding of Zr redistribution in irradiated U-10Zr fuel and on a better understanding of the complex microstructure present in fuel cladding chemical interaction (FCCI) layers. The presented zirconium redistribution data supplements the existing literature by providing a data set at these particular local conditions. In addition to FCCI layers that are readily visible in optical microscopy, this examination has revealed lanthanide degradation of the cladding by what appears to be a grain boundary facilitated pathway. Precipitates of fission produced Pd-lanthanide compounds were observed in the fuel. Furthermore, precipitated regions with elevated Mo and elevated W content were also observed in the HT-9 cladding of this sample.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RF pulse shape control in the compact linear collider test facility

The Compact Linear Collider (CLIC) is a study for an electron–positron machine aiming at accelerating and colliding particles at the next energy frontier. The CLIC concept is based on the novel two-beam acceleration scheme, where a high-current low-energy drive beam generates RF in series of power extraction and transfer structures accelerating the low-current main beam. To compensate for the transient beam-loading and meet the energy spread specification requirements for the main linac, the RF pulse shape must be carefully optimized. This was recently modelled by varying the drive beam phase switch times in the sub-harmonic buncher so that, when combined, the drive beam modulation translates into the required voltage modulation of the accelerating pulse. In this paper, the control over the RF pulse shape with the phase switches, that is crucial for the success of the developed compensation model, is studied. The results on the experimental verification of this control method are presented and a good agreement with the numerical predictions is demonstrated. Implications for the CLIC beam-loading compensation model are also discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

LLRF design for the HINS-SRF test facility at Fermilab

The High Intensity Neutrino Source (HINS) R&D program requires super conducting single spoke resonators operating at 325 MHz (SSR1). After coupler installation, these cavities are tested at the HINS-SRF facility at Fermilab. The LLRF requirements for these tests include support for continuous wave and pulsed mode operations, with the ability to track the resonance frequency of the tested cavity. Real-time measurement of the cavity loaded Q and Q{sub 0} are implemented using gradient decay techniques, allowing for Q{sub 0} versus E{sub acc} plots. A real time cavity simulator was also developed to test the LLRF system and verify its functionality.

43 PARTICLE ACCELERATORS↗

A Cryogenic RF Material Testing Facility at SLAC

The authors have developed an X-band SRF testing system using a high-Q copper cavity with an interchangeable flat bottom for the testing of different materials. By measuring the Q of the cavity, the system is capable to characterize the quenching magnetic field of the superconducting samples at different power level and temperature, as well as the surface resistivity. This paper presents the most recent development of the system and testing results.

43 PARTICLE ACCELERATORS↗

HiRadMat at CERN SPS - A test facility with high intensity beam pulses to material samples

HiRadMat (High Irradiation to Materials) is a facility at CERN designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies (e.g. vacuum windows, shock tests on high power targets, collimators) can be tested. The beam parameters (SPS 440 GeV protons with a pulse energy of up to 3.4 MJ, or alternatively lead/argon ions at the proton equivalent energy) can be tuned to match the needs of each experiment. It is a test area designed to perform single pulse experiments to evaluate the effect of high-intensity pulsed beams on materials in a dedicated environment, excluding long-time irradiation studies. The facility is designed for a 10{sup 16} maximum number of protons per year, in order to limit the activation to acceptable levels for human intervention. This paper will demonstrate the possibilities for research using this facility and showing examples of upcoming experiments scheduled in the beam period 2014/2015. (authors)

43 PARTICLE ACCELERATORS↗

The Transient Reactor Test Facility (TREAT)

TREAT operated from 1959-1994, later refurbished & resumed operation in 2017 to support fuel safety testing Zircaloy-clad graphite/fuel blocks comprise core Virtually any power history possible within ~2000 MJ core transient energy capacity From milliseconds to minutes: Pulses, Ramps, LOCA Fuel motion monitoring system “hodoscope” observes fast neutrons emitted from specimens to track fuel relocation in real time Reactor also can be a neutron source to adjacent radiography facility Experiment vehicle does everything else Safety containment, specimen environment, and instrumentation

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design of a Test Facility to Investigate Fundamental Na-CO 2 Interactions in Compact Heat Exchangers

One of the key objectives of the SFR R&D program is to develop and demonstrate innovative cost reduction and performance enhancing technologies for SFRs. The supercritical carbon dioxide (S-CO 2 ) Brayton cycle power converter system has been identified as one such innovation that could contribute to meeting this objective. One appealing feature of this system is the small footprint that the hardware requires, which is in part due to the use of Printed Circuit Heat Exchangers (PCHEs) as the secondary (Na-to-CO 2 ) heat exchanger as well as the recuperator and cooler modules. Although PCHEs have a high degree of structural integrity, the potential for leak(s) to develop between the sodium and CO2 coolant channels in the secondary heat exchanger cannot be ruled out, leading to discharge of high pressure CO 2 into the secondary coolant circuit. Due to the robustness of the PCHE design, catastrophic failure leading to gas jet blowdown into the secondary sodium loop is not deemed to be a likely scenario. Rather, small crack(s) (or micro-leaks) may develop in which CO 2 will bleed into the secondary system at a relatively low rate and chemically react with the sodium. The primary focus of the current work is to develop an experiment capability to investigate reaction characteristics under micro-leak conditions. This report summarizes the progress that was made towards meeting this objective this fiscal year. In particular, the facility scaling rationale was developed, and on that basis, the detailed facility design and operating procedures were completed. Based on the design work, fabrication drawings for the three primary system components (i.e., test vessel, dump tank, and separator/vapor trap) were generated and submitted to an outside vendor (i.e., Ability Engineering Technology in South Holland, IL) for fabrication. Fabrication of these components was also completed this year. Plans are to have the facility assembled by the midpoint of FY11 and to begin shakedown testing at that time.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Initial Neutronics Analyses for HEU to LEU Fuel Conversion of the Transient Reactor Test Facility (TREAT) at the Idaho National Laboratory

The purpose of the TREAT reactor is to generate large transient neutron pulses in test samples without over-heating the core to simulate fuel assembly accident conditions. The power transients in the present HEU core are inherently self-limiting such that the core prevents itself from overheating even in the event of a reactivity insertion accident. The objective of this study was to support the assessment of the feasibility of the TREAT core conversion based on the present reactor performance metrics and the technical specifications of the HEU core. The LEU fuel assembly studied had the same overall design, materials (UO 2 particles finely dispersed in graphite) and impurities content as the HEU fuel assembly. The Monte Carlo N–Particle code (MCNP) and the point kinetics code TREKIN were used in the analyses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Upgrade of Core Conduction Cooldown Test Facility Control System

The CCCTF was designed and installed at ORNL in the 1990s for high-temperature gas-cooled reactor accident simulation. It is located within a modular hot cell housed in the IFEL facility. In 2008 and 2009, modifications were made to the CCCTF in preparation for AGR safety testing. A new airlock was designed and installed to better support periodic exchange of the fission product deposition cups while maintaining the fuel at safety test temperature, and modifications were made to add routines to the existing user interface software for computer-controlled automation of the He sweep gas flow and liquid nitrogen supply to the 85Kr cold traps. However, the furnace control hardware and software remained essentially unchanged. At the conclusion of the AGR-1 and AGR-2 PIE campaigns, continued use of the CCCTF was in question because of the gradual obsolescence of the hardware and software used to control the furnace and ancillary systems that make up the CCCTF. Therefore, an effort was undertaken to replace all the obsolete components with new hardware and update the software to increase system reliability and ensure this capability’s maintenance for future research and fuel qualification efforts. The modifications included creating a new National Instruments (NI) LabVIEW-based control system with a graphical user interface (GUI).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring Helium Cryogen Usage with iFix Software at IB1 Test Facility

At the IB1 facility of the Applied Physics and Superconducting Technology Directorate within the Cryogenic Division at Fermilab, Liquid Helium is essential to the testing activities. The test stands require large amounts of Helium to test the thermal and superconducting cavities and magnets. The Liquid Helium that enters the test stand is monitored through a series of valves and controls to determine the start and stop for monitoring time. There are 3 phases of cryogen usage that must be considered for each stand, cooldown, warming and overnight mode. With a new system in place, cold hour tracking will be more objective and precise within each test stand ensuring better calculations for User s fees which are charged to various groups that employ the facility and aid replenishment of Helium and continual operation at IB1.

Trillo, Angelica↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The NML cryogenic plant cools two individually cryostated superconducting radio frequency (SRF) capture cavities and one prototype ILC cryomodule with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. The cryogenic plant is composed of two nitrogen precooled Tevatron satellite refrigerators, two Mycom 2016C compressors, a cryogenic distribution system, a Frick purifier compressor, two charcoal bed adsorber purifiers, and a liquid ring vacuum pump with a roots booster. The SRF cavities are immersed in a 2.0 K liquid helium bath, shielded with a 5 K gaseous helium shield and a liquid nitrogen cooled thermal shield. Since 2019, this R&D accelerator complex has gone through four science runs with an average duration of 12 months. Operational experience for each run, availability metrics, performance data and common outages are presented in this paper.

Wallace, Timothy [Fermilab] (ORCID:000900051589302↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The New Muon Laboratory (NML) cools two individually cryostated superconducting radio frequency (SRF) capture cavities (CC) and one prototype ILC cryomodule (CM) with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. Since 2019, this R&D accelerator complex has gone through four science runs.

Wallace, T. [Fermilab]↗

A New Facility for Testing Superconducting Solenoid Magnets with Large Fringe Fields at Fermilab

Testing superconducting solenoid with no iron flux return can be problematic for a magnet test facility due to the large magnetic fringe fields generated. These large external fields can interfere with the operation of equipment while precautions must be taken for personnel supporting the test. The magnetic forces between the solenoid under test and the external infrastructure must also be taken under consideration. A new test facility has been designed and built at Fermilab specifically for testing superconducting magnets with large external fringe fields. This paper discusses the test stand design, capabilities, and details of the instrumentation and controls with data from the first solenoid tested in this facility: the Muon Ionization Cooling Experiment (MICE) coupling coil.

43 PARTICLE ACCELERATORS↗

Flexible Residential Test Facility: Impact of Infiltration and Ventilation on Measured Heating Season Energy and Moisture Levels

Two identical laboratory homes designed to model existing Florida building stock were sealed and tested to 2.5 ACH50. Then, one was made leaky with 70% leakage through the attic and 30% through windows, to a tested value of 9 ACH50. Reduced energy use was measured in the tighter home (2.5 ACH50) in the range of 15% to 16.5% relative to the leaky (9 ACH50) home. Internal moisture loads resulted in higher dew points inside the tight home than the leaky home. Window condensation and mold growth occurred inside the tight home. Even cutting internal moisture gains in half to 6.05 lbs/day, the dew point of the tight home was more than 15 degrees F higher than the outside dry bulb temperature. The homes have single pane glass representative of older Central Florida homes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Functional and operational requirements document : building 1012, Battery and Energy Storage Device Test Facility, Sandia National Laboratories, New Mexico.

This report provides an overview of information, prior studies, and analyses relevant to the development of functional and operational requirements for electrochemical testing of batteries and energy storage devices carried out by Sandia Organization 2546, Advanced Power Sources R&D. Electrochemical operations for this group are scheduled to transition from Sandia Building 894 to a new Building located in Sandia TA-II referred to as Building 1012. This report also provides background on select design considerations and identifies the Safety Goals, Stakeholder Objectives, and Design Objectives required by the Sandia Design Team to develop the Performance Criteria necessary to the design of Building 1012. This document recognizes the Architecture-Engineering (A-E) Team as the primary design entity. Where safety considerations are identified, suggestions are provided to provide context for the corresponding operational requirement(s).

25 ENERGY STORAGE↗