Search NASA⌕ Search

SEARCH · Search NASA

Results for “time synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Fairness of channel access for non-time-critical traffic using the FDDI token ring protocol

The Fiber Distributed Data Interface (FDDI) is an ANSI draft proposed standard for a 100 megabit per second fiber optic token ring. FDDI supports two types of traffic, synchronous and asynchronous. Synchronous traffic is time critical traffic; stations are assigned guaranteed bandwidth to support their synchronous needs. Asynchronous traffic is lower priority and is sent only if time permits. It is proved analytically that the FDDI access protocol provides all stations on the ring with equal access to the channel to transmit asynchronous frames, regardless of the relative sizes of synchronous bandwidth allocations for individual stations. Analytic results are supported with data from simulation runs.

Johnson, M. J.↗

A Fault-Tolerant Clock Synchronization and Geometry Determination Protocol

A fault-tolerant distributed protocol (algorithm) is presented that achieves optimum timing precision (clock synchronization) among the nodes and, simultaneously, determines the network's geometry (shape) - locations and distances of the nodes relative to each other - in a wireless distributed system. This protocol is based on the assumption of initial coarse synchrony of nodes' local clocks. The proposed solution assumes no prior knowledge of the nodes' locations, the distances between the nodes, or network's geometry, but assumes an ordered geometry where nodes have unique identifiers. This protocol accommodates large variations in the communication latencies among the nodes; thus, it applies equally to both wireless and wired networks.

Malekpour, Mahyar R.↗

Effects of Gravity on Insect Circadian Rhythmicity

Circadian rhythms - endogenous daily rhythmic fluctuations in virtually all characteristics of life - are generated and coordinated by the circadian timing system (CTS). The CTS is synchronized to the external 24-hour day by time cues such as the light/dark cycle. In an environment without time cues, the length of an animal's day is determined by the period of its internal pacemaker (tau) and the animal is said to be free-running. All life on earth evolved under the solar day; the CTS exists as an adaptation that allows organisms to anticipate and to prepare for rhythmic environmental fluctuations. All life on earth also evolved under the force of earth's gravitational environment. While it is therefore not surprising that changes in the lighting environment affect the CTS, it is surprising that changes in the gravitational environment would do so. However, recent data from one of our laboratories using the brn-3.1 knockout mouse revealed that this model, which lacks the sensory receptor hair cells within the neurovestibular system, does not respond to exposure to a hyperdynamic environment in the same fashion as normal mice. The brn-3.1 mice did not show the expected suppression of circadian rhythmicity shown by control mice exposed to 2G. Exposure to altered ambient force environments affects the amplitude, mean and timing of circadian rhythms in species from unicellular organisms to man. In addition, there is a circadian influence on the homeostatic response to acute 2G acceleration and pulses of 2G can act as a time cue, synchronizing the CTS. This is of significance because maintenance of internal and external temporal coordination is critical for normal physiological and psychological function. Typically, during adaptation to an increased gravitational environment (+G), an initial acute reaction is followed by adaptation and, eventually, a new steady state (14-16), which can take weeks to months to establish. Until the development of space stations, exposure to microgravity was, of necessity, relatively short in duration. In early spaceflight experiments an organism's internal rhythms often expressed periods that were different from each other, even in the presence of a 24.0 hour light-dark cycle, suggesting that the organism was experiencing internal desynchronization (17, 18). In (micro)G, the body temperature rhythm was delayed with respect to other body rhythms and to the light-dark cycle in rhesus macaques (19) and man (20, 21). In the absence of a light-dark cycle, the circadian rhythm of spore formation persisted in Neurospora crassa, however, both the variability and average period of the rhythm increased (22). The beetle Trigonoscelis gigas, exhibited changes in period during and following 11-13 days in (micro)G (23, 24). Resynchronization of the urinary calcium rhythm following a 1800 phase shift of the LID cycle was retarded in rats exposed to (micro)G compared to 1G controls (25). With the development of the Russian Mir Space Station, long-term controlled microgravity exposure became possible. We recorded activity rhythms from black-bodied Tenebrionid beetles, Trigonoscelis gigas, in (micro)G (spaceflight). Each insect was housed individually within an activity monitor (26) and data (activity counts) were collected and stored in five-minute bins. Thirty-two individual activity monitors were housed within each of 2 experimental kits. The beetles within each kit were divided into two groups and the lighting was controlled separately for each group.

Hoban-Higgins, Tana M.↗

Ultra-Low Noise Laser and Optical Frequency Comb-Based Timing System for the Event Horizon Explorer (EHE) Mission

Very Long Baseline Interferometry (VLBI) requires a highly stable time reference and synchronization system to maintain coherence between observations recorded independently at multiple stations – for example, the array of ground-based radio telescopes that comprise the Event Horizon Telescope (EHT). Instability in the time reference or inaccuracy in the synchronization impacts phase conference and reduces the performance of the VLBI system. For space-based telescopes like the Event Horizon Explorer (EHE) mission, the precision timing system must meet the size, weight, and power (SWaP) constraints of the spacecraft platform and be capable of operating in the space environment. The EHE mission is a proposed extension to the EHT that can improve the angular and time resolution of observations by enabling longer interferometric baselines than are possible on the Earth and sampling a wide range of Fourier spatial frequencies throughout the orbital motion. In this effort, we demonstrate the performance of one option for the EHE mission: the use of a space-qualified, ultra-low noise laser developed as part of the Laser Interferometer Space Antenna (LISA) mission as the timing reference, and an optical frequency comb to transfer the stability of this laser to the microwave regime for instrumentation use. We describe the implementation of the microwave down-conversion, in which the LISA cavity-stabilized laser is locked to a self-referenced optical frequency comb to divide the optical frequency down to 100 MHz. The phase noise of the 100 MHz signal is measured and validated using a phase noise analyzer that is referenced to a separate laboratory ultra-stable laser system. We present the results of this experiment, which demonstrates that the performance of this system meets the EHE requirement: a relative frequency error of 1e-14 from 1 to 30 seconds.

Hannah Tomio↗

Nonlinear Whirl Response of a High-Speed Seal Test Rotor With Marginal and Extended Squeeze-Film Dampers

Synchronous and nonsynchronous whirl response analysis of a double overhung, high-speed seal test rotor with ball bearings supported in 5.84- and 12.7-mm-long, un-centered squeeze-film oil dampers is presented. Test performance with the original damper of length 5.84 mm was marginal, with nonsynchronous whirling at the overhung seal test disk and high amplitude synchronous response above 32,000 rpm near the drive spline section occurring. A system critical speed analysis of the drive system and the high-speed seal test rotor indicated that the first two critical speeds are associated with the seal test rotor. Nonlinear synchronous unbalance and time transient whirl studies were conducted on the seal test rotor with the original and extended damper lengths. With the original damper design, the nonlinear synchronous response showed that unbalance could cause damper lockup at 33,000 rpm. Alford cross-coupling forces were also included at the overhung seal test disk for the whirl analysis. Sub-synchronous whirling at the seal test disk was observed in the nonlinear time transient analysis. With the extended damper length of 12.7 mm, the sub-synchronous motion was eliminated and the rotor unbalance response was acceptable to 45,000 rpm with moderate rotor unbalance. However, with high rotor unbalance, damper lockup could still occur at 33,000 rpm, even with the extended squeeze-film dampers. Therefore, the test rotor must be reasonably balanced in order for the un-centered dampers to be effective.

Proctor, Margaret P.↗

Stability Analysis of a High-Speed Seal Test Rotor With Marginal and Extended Squeeze-Film Dampers: Theoretical and Experimental Results

A case study of a high-speed seal test rotor shows how rotor dynamic analysis can be used to diagnose the source of high vibrations and evaluate a proposed remedy. Experimental results are compared with the synchronous and non-synchronous whirl response analysis of a double overhung, high-speed seal test rotor with ball bearings supported in 5.84- and 12.7-mm-long, un-centered squeeze-film oil dampers. Test performance with the original damper of length 5.84 mm was marginal. Non-synchronous whirling occurred at the overhung seal test disk and there was a high amplitude synchronous response near the drive spline above 32,000 rpm. Nonlinear synchronous unbalance and time transient whirl studies were conducted on the seal test rotor with the original and extended damper lengths. With the original damper design, the nonlinear synchronous response showed that unbalance could cause damper lockup at 33,000 rpm. Alford cross-coupling forces were also included at the overhung seal test disk for the whirl analysis. Sub-synchronous whirling at the seal test disk was observed in the nonlinear time transient analysis. With the extended damper length of 12.7 mm, the sub-synchronous motion was eliminated and the rotor unbalance response was acceptable to 45,000 rpm with moderate rotor unbalance. Seal test rotor orbits and vibration levels with the extended squeeze film dampers showed smooth operation to 40,444 rpm.

Proctor, Margaret P.↗

Kennedy Space Center Timing and Countdown Interface to Kennedy Ground Control Subsystem

Kennedy Ground Control System (KGCS) engineers at the National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) are developing a time-tagging process to enable reconstruction of the events during a launch countdown. Such a process can be useful in the case of anomalies or other situations where it is necessary to know the exact time an event occurred. It is thus critical for the timing information to be accurate. KGCS will synchronize all items with Coordinated Universal Time (UTC) obtained from the Timing and Countdown (T&CD) organization. Network Time Protocol (NTP) is the protocol currently in place for synchronizing UTC. However, NTP has a peak error that is too high for today's standards. Precision Time Protocol (PTP) is a newer protocol with a much smaller peak error. The focus of this project has been to implement a PTP solution on the network to increase timing accuracy while introducing and configuring the implementation of a firewall between T&CD and the KGCS network.

Protocol↗

Error correction method and apparatus for electronic timepieces

A method and apparatus for correcting errors in an electronic digital timepiece that includes an oscillator which has a 2 in. frequency output, an n-stage frequency divider for reducing the oscillator output frequency to a time keeping frequency, and means for displaying the count of the time keeping frequency. In first and second embodiments of the invention the timepiece is synchronized with a time standard at the beginning of the period of time T. In the first embodiment of the invention the timepiece user observes E (the difference between the time standard and the timepiece time at the end of the period T) and then operates a switch to correct the time of the timepiece and to obtain a count for E. In the second embodiment of the invention, the user operates a switch at the beginning of T and at the end of T and a count for E is obtained electronically.

Davidson, J. R.↗

Solar Sail Optimal Orbit Transfers to Synchronous Orbits

A constant outward radial thrust acceleration can be used to reduce the radius of a circular orbit of specified period. Heliocentric circular orbits are designed to match the orbital period of Earth or Mars for various radial thrust accelerations and are defined as synchronous orbits. Minimum-time solar sail orbit transfers to these synchronous heliocentric orbits are presented.

Powers, Robert B.↗

Sample-Clock Phase-Control Feedback

To demodulate a communication signal, a receiver must recover and synchronize to the symbol timing of a received waveform. In a system that utilizes digital sampling, the fidelity of synchronization is limited by the time between the symbol boundary and closest sample time location. To reduce this error, one typically uses a sample clock in excess of the symbol rate in order to provide multiple samples per symbol, thereby lowering the error limit to a fraction of a symbol time. For systems with a large modulation bandwidth, the required sample clock rate is prohibitive due to current technological barriers and processing complexity. With precise control of the phase of the sample clock, one can sample the received signal at times arbitrarily close to the symbol boundary, thus obviating the need, from a synchronization perspective, for multiple samples per symbol. Sample-clock phase-control feedback was developed for use in the demodulation of an optical communication signal, where multi-GHz modulation bandwidths would require prohibitively large sample clock frequencies for rates in excess of the symbol rate. A custom mixedsignal (RF/digital) offset phase-locked loop circuit was developed to control the phase of the 6.4-GHz clock that samples the photon-counting detector output. The offset phase-locked loop is driven by a feedback mechanism that continuously corrects for variation in the symbol time due to motion between the transmitter and receiver as well as oscillator instability. This innovation will allow significant improvements in receiver throughput; for example, the throughput of a pulse-position modulation (PPM) with 16 slots can increase from 188 Mb/s to 1.5 Gb/s.

Quirk, Kevin J.↗

Improving crop classification through attention to the timing of airborne radar acquisitions

Radar remote sensors may provide valuable input to crop classification procedures because of (1) their independence of weather conditions and solar illumination, and (2) their ability to respond to differences in crop type. Manual classification of multidate synthetic aperture radar (SAR) imagery resulted in an overall accuracy of 83 percent for corn, forest, grain, and 'other' cover types. Forests and corn fields were identified with accuracies approaching or exceeding 90 percent. Grain fields and 'other' fields were often confused with each other, resulting in classification accuracies of 51 and 66 percent, respectively. The 83 percent correct classification represents a 10 percent improvement when compared to similar SAR data for the same area collected at alternate time periods in 1978. These results demonstrate that improvements in crop classification accuracy can be achieved with SAR data by synchronizing data collection times with crop growth stages in order to maximize differences in the geometric and dielectric properties of the cover types of interest.

Brisco, B.↗

Low Pressure Flame Blowoff from the Forward Stagnation Region of a Blunt-Nosed Cast PMMA Cylinder in Axial Mixed Convective Flow

Low-pressure blowoff experiments were conducted with a stagnation flame stabilized on the forward tip of cast PMMA rods in a vertical wind tunnel. Pressure, forced flow velocity, gravity, and ambient oxygen concentration were varied. Stagnation flame blowoff is determined from a time-stamped video recording of the test. The blowoff pressure is determined from test section pressure transducer data that is synchronized with the time stamp. The forced flow velocity is also determined from the choked flow orifice pressure. Most of the tests were performed in normal gravity, but a handful of microgravity tests were also conducted to determine the influence of buoyant flow velocity on the blowoff limits. The blowoff limits are found to have a linear dependence between the partial pressure of oxygen and the total pressure, regardless of forced flow velocity and gravity level. The flow velocity (forced and/or buoyant) affects the blowoff pressure through the critical Damkohler number residence time, which dictates the partial pressure of oxygen at blowoff. This is because the critical stretch rate increases linearly with increasing pressure at low pressure (sub-atmospheric pressures) since a second-order overall reaction rate with two-body reactions dominates in this pressure range.

flammability↗

Real-Time Testbed for Smart Grid Recloser Controller

The growing need for a low voltage recloser has become apparent due to the rise in requirements for a smart grid. This includes more detailed management of power flow forward (towards load) and backward (towards generation), source synchronization in real time, more indepth fault responses, and the use of green energy. The SEL-651R-2 relay is a device that can manage these needs, especially in fault response and synchronization, and is commonly used in systems called microgrids. Microgrids are distribution level systems that are able to operate separated from the main grid, are typically installed much closer to the load(s), and are fed by distributed energy resources (DERs), such as wind, solar or diesel generators. The SEL-651R-2 is normally used in the field with presets operative settings, but the Western Michigan University (WMU) Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology (WMU InterEnergy Center) wished to test this device in its range of capabilities for microgrid application. A Hardware-In-the-Loop (HIL) testbed was implemented and used through the Real Time Digital Simulator (RTDS) using the RSCAD software to test the SEL-651R-2's use cases and functions. The testbed includes a microgrid with interconnection to a larger main grid, and the relay is meant to control the recloser at the point of common coupling (PCC) between the main grid and microgrid. The testbed shows how basic protections, reclosing, and synchronization checks function when handling faults that affect both the microgrid and the main grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Precision time distribution within a deep space communications complex

The Precision Time Distribution System (PTDS) at the Golstone Deep Space Communications Complex is a practical application of existing technology to the solution of a local problem. The problem was to synchronize four station timing systems to a master source with a relative accuracy consistently and significantly better than 10 microseconds. The solution involved combining a precision timing source, an automatic error detection assembly and a microwave distribution network into an operational system. Upon activation of the completed PTDS two years ago, synchronization accuracy at Goldstone (two station relative) was improved by an order of magnitude. It is felt that the validation of the PTDS mechanization is now completed. Other facilities which have site dispersion and synchronization accuracy requirements similar to Goldstone may find the PTDS mechanization useful in solving their problem. At present, the two station relative synchronization accuracy at Goldstone is better than one microsecond.

Curtright, J. B.↗

Distributed simulation using a real-time shared memory network

The Advanced Control Technology Branch of the NASA Lewis Research Center performs research in the area of advanced digital controls for aeronautic and space propulsion systems. This work requires the real-time implementation of both control software and complex dynamical models of the propulsion system. We are implementing these systems in a distributed, multi-vendor computer environment. Therefore, a need exists for real-time communication and synchronization between the distributed multi-vendor computers. A shared memory network is a potential solution which offers several advantages over other real-time communication approaches. A candidate shared memory network was tested for basic performance. The shared memory network was then used to implement a distributed simulation of a ramjet engine. The accuracy and execution time of the distributed simulation was measured and compared to the performance of the non-partitioned simulation. The ease of partitioning the simulation, the minimal time required to develop for communication between the processors and the resulting execution time all indicate that the shared memory network is a real-time communication technique worthy of serious consideration.

Simon, Donald L.↗

Demonstrating a Realistic IP Mission Prototype

Flight software and hardware and realistic space communications environments were elements of recent demonstrations of the Internet Protocol (IP) mission concept in the lab. The Operating Missions as Nodes on the Internet (OMNI) Project and the Flight Software Branch at NASA/GSFC collaborated to build the prototype of a representative space mission that employed unmodified off-the-shelf Internet protocols and technologies for end-to-end communications between the spacecraft/instruments and the ground system/users. The realistic elements used in the prototype included an RF communications link simulator and components of the TRIANA mission flight software and ground support system. A web-enabled camera connected to the spacecraft computer via an Ethernet LAN represented an on-board instrument creating image data. In addition to the protocols at the link layer (HDLC), transport layer (UDP, TCP), and network (IP) layer, a reliable file delivery protocol (MDP) at the application layer enabled reliable data delivery both to and from the spacecraft. The standard Network Time Protocol (NTP) performed on-board clock synchronization with a ground time standard. The demonstrations of the prototype mission illustrated some of the advantages of using Internet standards and technologies for space missions, but also helped identify issues that must be addressed. These issues include applicability to embedded real-time systems on flight-qualified hardware, range of applicability of TCP, and liability for and maintenance of commercial off-the-shelf (COTS) products. The NASA Earth Science Technology Office (ESTO) funded the collaboration to build and demonstrate the prototype IP mission.

Rash, James↗

Computerized processing of data from Interkosmos-7 and Interkosmos-8 satellite experiments

Computerized data processing problems are analyzed using telemetry data received from Intercosmos-7 and Intercosmos-8 satellites. Problems related to the restoration of measurement data in the form of piecewise continuous and smooth calibrated functions of time and problems encountered in the scientific interpretation of the experimental results are considered. Curve smoothing is discussed in the case of distinct assignments of calibration levels, synchronization, and synchronization checks over time. A proposal is presented for checking a piecewise linear function providing a simple method for the elimination of isolated values due to channel failures and the separation of individual intervals.

Pfau, H.↗

Communication overhead on the Intel Paragon, IBM SP2 and Meiko CS-2

Interprocessor communication overhead is a crucial measure of the power of parallel computing systems-its impact can severely limit the performance of parallel programs. This report presents measurements of communication overhead on three contemporary commercial multicomputer systems: the Intel Paragon, the IBM SP2 and the Meiko CS-2. In each case the time to communicate between processors is presented as a function of message length. The time for global synchronization and memory access is discussed. The performance of these machines in emulating hypercubes and executing random pairwise exchanges is also investigated. It is shown that the interprocessor communication time depends heavily on the specific communication pattern required. These observations contradict the commonly held belief that communication overhead on contemporary machines is independent of the placement of tasks on processors. The information presented in this report permits the evaluation of the efficiency of parallel algorithm implementations against standard baselines.

Bokhari, Shahid H.↗