Search NASA⌕ Search

SEARCH · Search NASA

Results for “02 - PETROLEUM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

STS-87 Day 02 Highlights

On this second day of the STS-87 mission, the flight crew, Cmdr. Kevin R. Kregel, Pilot Steven W. Lindsey, Mission Specialists Winston E. Scott, Kalpana Chawla, and Takao Doi, and Payload Specialist Leonid K. Kadenyuk are seen conducting experiments involving the effect of weightlessness on materials and fluids. They also work with an experiment to study Earth's protective ozone layers.

Source record↗

STS-89 Day 02 Highlights

On this second day of the STS-89 mission, the flight crew, Cmdr. Terrence W. Wilcutt, Pilot Frank Edwards, and Mission Specialists Michael P. Anderson, James F. Reilly, Bonnie J. Dunbar, Salizhan Shakirovich Sharipov, David A. Wolf and Andrew S.W. Thomas, take time from their schedule to discuss with radio station KNX of Los Angeles the STS-89 mission and Thomas' transfer to the Mir Space Station.

Source record↗

STS-90 Day 02 Highlights

On this second day of the STS-90 mission, the flight crew, Cmdr. Richard A. Searfoss, Pilot Scott D. Altman, and Mission Specialists Richard M. Linnehan, Dafydd Rhys Williams and Kathryn P. Hire, and Payload Specialists Jay C. Buckey and James A. Pawelczyk activate the Bioreactor Demonstration Experiment, an investigation that grows cell tissue cultures in weightlessness. The device, making its fourth shuttle flight, has the capability to grow more perfect tissue samples in weightlessness than can be achieved on Earth. Cell samples in the bioreactor experiment aboard Columbia include renal tissue and bone marrow, both samples being evaluated for the ability to produce substances useful in a variety of medical treatments on Earth.

Source record↗

STS-95 Day 02 Highlights

On this second day of the STS-95 mission, the flight crew, Cmdr. Curtis L. Brown, Pilot Steven W. Lindsey, Mission Specialists Scott E. Parazynski, Stephen K. Robinson, and Pedro Duque, and Payload Specialists Chiaki Mukai and John H. Glenn, are seen preparing a glovebox device in the middeck area of Discovery, an enclosed research facility that will support numerous science investigations throughout the mission. Payload Specialist John Glenn, activates the Microgravity Encapsulation Process experiment (MEPS). This experiment will study the formation of capsules containing two kinds of anti-tumor drugs that could be delivered directly to solid tumors with applications for future chemotherapy treatments and the pharmaceutical industry.

Source record↗

STS-88 Day 02 Highlights

On this second day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev are awakened with the song "Get Ready" by the Temptations. Ross and Newman perform a checkout of the SAFER or Simplified Aid for EVA Rescue unit. SAFER is a mini maneuvering system that can provide self-rescue capability for a spacewalker if they inadvertently become separated from the spacecraft during a spacewalk. The crew then downlinks video taken inside the crew cabin during their ascent to orbit.

Source record↗

STS-96 FD Highlights and Crew Activities Report: Flight Day 02

On this second day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen preparing for the docking with the International Space Station (Unity and Zarya modules). Ochoa and Payette open the tunnel and hatches leading to the SPACEHAB module in the payload bay. Payette and Tokarev place equipment in the module to create space in Discovery's cabin. Jernigan, Barry, Payette and Husband test three spacesuits. Ochoa and Payette also test a 50-foot robot arm. And Jernigan and Ochoa extend the outer ring of Discovery's Orbiter Docking System.

Source record↗

The Outbursts and Orbit of the Accreting Pulsar GS 1843 - 02 = 2S 1845 - 024

We present observations of a series of 10 outbursts of pulsed hard X-ray flux from the transient 10.6 mHz accreting pulsar GS 1843-02, using the Burst and Transient Source Experiment on the Compton Gamma Ray Observatory. These outbursts occurred regularly every 242 days, coincident with the ephemeris of the periodic transient GRO J1849-03, which has recently been identified with the SAS 3 source 2S 1845-024. Our pulsed detection provides the first clear identification of GS 1843-02 with 2S 1845-024. We present a pulse timing analysis that shows that the 2S 1845-024 outbursts occur near the periastron passage of the neutron star's highly eccentric (e = 0.88 +/- 0.01) 242.18 +/- 0.01 day period binary orbit about a high-mass (M(sub c) greater than 7 solar mass) companion. The orbit and transient outburst pattern strongly suggest that the pulsar is in a binary system with a Be star. Our observations show a long-term spin-up trend, with most of the spin-up occurring during the outbursts. From the measured spin-up rates and inferred luminosities we conclude that an accretion disk is present during the outbursts.

Finger, Mark H.↗

STS-101 Crew Activity Report Flight Day 02 Highlights

The primary mission objective for STS-101 was to deliver supplies to the International Space Station, perform a space walk, and reboost the station from 230 statute miles to 250 statute miles. The commander of this mission was, James D. Haslsell. The crew was Scott J. Horowitz, the pilot, and mission specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev. This videotape shows the activities of the second day of the flight. On this day the shuttle crew checked the equipment in preparation for rendezvous with the International Space Station. This video shows the astronauts entering the SpaceHab, where the supplies bound for the space station are stored. There are also views of the robotic arm, which will be used during the spacewalk to maneuver Williams and Voss between Atlantis and the station.

Source record↗

National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

Source record↗

Deep Space 1 flight experience: adventures on an ion drive (AAS 02-072)

This paper provides a brief overview of the DSI attitude control subsystem, shares a few lessons-learned, and describes some of the many daunting challenges faced by our tiny flight team during the course of the mission. Special focus will be given to the nuances of flying a spacecraft with ion propulsion, our nick-of-time rewrite of the attitude determination software after the failure of the on-board star tracker in late 1999, and DSl's subsequent successful flyby of comet Borrelly on September 22, 2001.

SEP ion propulsion DS1 flight experience↗

Evolution of Regolith Feed Systems for Lunar ISRU 02 Production Plants

The In-Situ Resource Utilization (ISRU) project of the NASA Constellation Program, Exploration Technology Development Program (ETDP) has been engaged in the design and testing of various Lunar ISRU O2 production plant prototypes that can extract chemically bound oxygen from the minerals in the lunar regolith. This work demands that lunar regolith (or simulants) shall be introduced into the O2 production plant from a holding bin or hopper and subsequently expelled from the ISRU O2 production plant for disposal. This sub-system is called the Regolith Feed System (RFS) which exists in a variety of configurations depending on the O2 production plant oxygen being used (e.g. Hydrogen Reduction, Carbothermal, Molten Oxide Electrolysis). Each configuration may use a different technology and in addition it is desirable to have heat recuperation from the spent hot regolith as an integral part of the RFS. This paper addresses the various RFS and heat recuperation technologies and system configurations that have been developed under the NASA ISRU project since 2007. In addition current design solutions and lessons learned from reduced gravity flight testing will be discussed.

Mueller, Robert P.↗

Fifteen-minute Extravehicular Activity Prebreathe Protocol Using NASA's Exploration Atmosphere (8.2 psia/ 34% 02)

A TBDM DCS probability model based on an existing biophysical model of inert gas bubble growth provides significant prediction and goodness-of-fit with 84 cases of DCS in 668 human altitude exposures. 2. Model predictions suggest that 15-minute O2 prebreathe protocols used in conjunction with suit ports and an 8.2 psi, 34% O2, 66% N2 atmosphere may enable rapid EVA capability for future exploration missions with the risk of DCS ≤ 12%.  EVA could begin immediately at 6.0 psi, with crewmembers decreasing suit pressure to 4.3 psi after completing the 15-minute in-suit prebreathe. 3. Model predictions suggest that intermittent recompression during exploration EVA may reduce decompression stress by 1.8% to 2.3% for 6 hours of total EVA time. Savings in gas consumables and crew time may be accumulated by abbreviating the EVA suit N2 purge to 2 minutes (20% N2) compared with 8 minutes (5% N2) at the expense of an increase in estimated decompression risk of up to 2.4% for an 8-hour EVA.  Increased DCS risk could be offset by IR or by spending additional time at 6 psi at the beginning of the EVA.  Savings of 0.48 lb of gas and 6 minutes per person per EVA corresponds to more than 31 hours of crew time and 1800 lb of gas and tankage under the Constellation lunar architecture. 6. Further research is needed to characterize and optimize breathing mixtures and intermittent recompression across the range of environments and operational conditions in which astronauts will live and work during future exploration missions. 7. Development of exploration prebreathe protocols will begin with definition of acceptable risk, followed by development of protocols based on models such as ours, and, ultimately, validation of protocols through ground trials before operational implementation.

Abercromby, Andrew F. J.↗