Search NASA⌕ Search

SEARCH · Search NASA

Results for “2026”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

STS-47 Space Shuttle mission report

The STS-47 Space Shuttle Program Mission Report provides a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle main engine (SSME) subsystem performance during the fiftieth Space Shuttle Program flight and the second flight of the Orbiter Vehicle Endeavour (OV-105). In addition to the Endeavour vehicle, the flight vehicle consisted of the following: an ET which was designated ET-45 (LWT-38); three SSME's which were serial numbers 2026, 2022, and 2029 and were located in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-053. The lightweight/redesigned RSRM that was installed in the left SRB was designated 360L026A, and the RSRM that was installed in the right SRB was 360W026B. The primary objective of the STS-47 flight was to successfully perform the planned operations of the Spacelab-J (SL-J) payload (containing 43 experiments--of which 34 were provided by the Japanese National Space Development Agency (NASDA)). The secondary objectives of this flight were to perform the operations of the Israeli Space Agency Investigation About Hornets (ISAIAH) payload, the Solid Surface Combustion Experiment (SSCE), the Shuttle Amateur Radio Experiment-2 (SAREX-2), and the Get-Away Special (GAS) payloads. The Ultraviolet Plume Instrument (UVPI) was flown as a payload of opportunity.

Fricke, Robert W., Jr.↗

STS-42 Space Shuttle mission report

The STS-42 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-fifth flight of the Space Shuttle Program and the fourteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Discovery vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-52 (LWT-45); three Space Shuttle main engines (SSME's), which were serial numbers 2026, 2022, and 2027 in positions 1, 2, and 3, respectively; and two Solid Rocket Boosters (SRB's) designated as BI-048. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each one of the SRB's were designated as 360L020A for the left SRM and 360Q020B for the right SRM. The primary objective of the STS-42 mission was to complete the objectives of the first International Microgravity Laboratory (IML-1). Secondary objectives were to perform all operations necessary to support the requirements of the following: Gelation of Sols: Applied Microgravity Research (GOSAMR); Student Experiment 81-09 (Convection in Zero Gravity); Student Experiment 83-02 (Capillary Rise of Liquid Through Granular Porous Media); the Investigation into Polymer Membrane Processing (IPMP); the Radiation Monitoring Equipment-3 (RME-3); and Get-Away Special (GAS) payloads carried on the GAS Beam Assembly.

Fricke, Robert W.↗

Model atmospheres - Tool for identifying interstellar features

Model atmosphere parameters are derived for 14 early A stars with rotation velocities, from optical spectra, in excess of 80 km/s. The models are compared with IUE observations of the stars in regions where interstellar lines are expected. In general, with the assumption of solar abundances, excellent fits are obtained in regions longward of 2580 A, and accurate interstellar equivalent widths can be derived using models to establish the continuum. The fits are poorer at shorter wavelengths, particularly at 2026-2062 A, where the stellar model parameters seem inadequate. Features indicating mass flows are evident in stars with known infrared excesses. In gamma TrA, variability in the Mg II lines is seen over the 5-year interval of these data, and also over timescales as short as 26 days. The present technique should be useful in systematic studies of episodic mass flows in A stars and for stellar abundance studies, as well as interstellar features.

Frisch, P. C.↗

STS-68 Space Shuttle mission report

The STS-68 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the sixty-fifth flight of the Space Shuttle Program and the seventh flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-65; three SSMEs that were designated as serial numbers 2028, 2033, and 2026 in positions 1, 2, and 3, respectively; and two SRBs that were designated BI-067. The RSRMs that were installed in each SRB were designated as 360W040A for the left SRB and 360W040B for the right SRB. The primary objective of this flight was to successfully perform the operations of the Space Radar Laboratory-2 (SRL-2). The secondary objectives of the flight were to perform the operations of the Chromosome and Plant Cell Division in Space (CHROMEX), the Commercial Protein Crystal Growth (CPCG), the Biological Research in Canisters (BRIC), the Cosmic Radiation Effects and Activation Monitor (CREAM), the Military Application of Ship Tracks (MAST), and five Get-Away Special (GAS) payloads.

Fricke, Robert W., Jr.↗

STS-74 Space Shuttle Mission Report

The STS-74 Space Shuttle Program Mission Report summarizes the Payload activities as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the seventy-third flight of the Space Shuttle Program, the forty-eighth flight since the return-to-flight, and the fifteenth flight of the Orbiter Atlantis (OV-104). In addition to the Orbiter, the flight vehicle consisted of an ET that was designated ET-74; three Phase 11 SSME's that were designated as serial numbers 2012, 2026, and 2032 in positions 1, 2, and 3, respectively; and two SRB's that were designated BI-076. The RSRM's, designated RSRM-51, were installed in each SRB and the individual RSRM's were designated as 360TO51 A for the left SRB, and 360TO51 B for the right SRB. The primary objectives of this flight were to rendezvous and dock with the Mir Space Station and perform life sciences investigations. The Russian Docking Module (DM) was berthed onto the Orbiter Docking System (ODS) using the Remote Manipulator System (RMS), and the Orbiter docked to the Mir with the DM. When separating from the Mir, the Orbiter undocked, leaving the DM attached to the Mir. The two solar arrays, mounted on the DM, were delivered for future Russian installation to the Mir. The secondary objectives of the flight were to perform the operations necessary to fulfill the requirements of the GLO experiment (GLO-4)/Photogrammetric Appendage Structural Dynamics Experiment Payload (PASDE) (GPP), the IMAX Cargo Bay Camera (ICBC), and the Shuttle Amateur Radio Experiment-2 (SAREX-2). Appendix A lists the sources of data, both formal and informal, that were used to prepare this report. Appendix B provides the definition of acronyms and abbreviations used throughout the report. All times during the flight are given in Greenwich mean time (GMT)) and mission elapsed time (MET).

Fricke, Robert W., Jr.↗

NASA's Asteroid Redirect Mission (ARM)

Mission Description and Objectives: NASA's Asteroid Redirect Mission (ARM) consists of two mission segments: 1) the Asteroid Redirect Robotic Mission (ARRM), a robotic mission to visit a large (greater than approximately 100 meters diameter) near-Earth asteroid (NEA), collect a multi-ton boulder from its surface along with regolith samples, and return the asteroidal material to a stable orbit around the Moon; and 2) the Asteroid Redirect Crewed Mission (ARCM), in which astronauts will explore and investigate the boulder and return to Earth with samples. The ARRM is currently planned to launch at the end of 2021 and the ARCM is scheduled for late 2026.

Abell, P. A.↗

Sensitivity of the Asteroid Redirect Robotic Mission (ARRM) to Launch Date and Asteroid Stay Time

National Aeronautics and Space Administrations (NASAs) proposed Asteroid Redirect Mission (ARM) is being designed to robotically capture and then redirect an asteroidal boulder into a stable orbit in the vicinity of the moon, where astronauts would be able to visit and study it. The current reference trajectory for the robotic portion, ARRM, assumes a launch on a Delta-IV H in the end of the calendar year 2021, with a return for astronaut operations in cislunar space in 2026. The current baseline design allocates 245 days of stay time at the asteroid for operations and boulder collection. This paper outlines analysis completed by the ARRM mission design team to understand the sensitivity of the reference trajectory to launch date and asteroid stay time.

asteroid↗

Sensitivity of the Asteroid Redirect Robotic Mission (ARRM) to Launch Date and Asteroid Stay Time

National Aeronautics and Space Administrations (NASAs) proposed Asteroid Redirect Mission (ARM) is being designed to robotically capture and then redirect an asteroidal boulder mass into a stable orbit in the vicinity of the moon, where astronauts would be able to visit and study it. The current reference trajectory for the robotic portion, ARRM, assumes a launch on a Delta IV H in the end of the calendar year 2021, with a return for astronaut operations in cislunar space in 2026. The current baseline design allocates 245 days of stay time at the asteroid for operations and boulder collection. This paper outlines analysis completed by the ARRM mission design team to understand the sensitivity of the reference trajectory to launch date and asteroid stay time.

trajectory analysis↗

Preliminary Analysis of Ground-based Orbit Determination Accuracy for the Wide Field Infrared Survey Telescope (WFIRST)

The Wide Field Infrared Survey Telescope is a 2.4-meter telescope planned for launch to the Sun-Earth L2 point in 2026. This paper details a preliminary study of the achievable accuracy for WFIRST from ground-based orbit determination routines. The analysis here is divided into two segments. First, a linear covariance analysis of early mission and routine operations provides an estimate of the tracking schedule required to meet mission requirements. Second, a simulated operations scenario gives insight into the expected behavior of a daily Extended Kalman Filter orbit estimate over the first mission year given a variety of potential momentum unloading schemes.

Estimation↗

Preliminary Analysis of Ground-Based Orbit Determination Accuracy for the Wide Field Infrared Survey Telescope (WFIRST)

The Wide Field Infrared Survey Telescope is a 2.4-meter telescope planned for launch to the Sun-Earth L2 point in 2026. This paper details a preliminary study of the achievable accuracy for WFIRST from ground-based orbit determination routines. The analysis here is divided into two segments. First, a linear covariance analysis of early mission and routine operations provides an estimate of the tracking schedule required to meet mission requirements. Second, a simulated operations'' scenario gives insight into the expected behavior of a daily Extended Kalman Filter orbit estimate over the first mission year given a variety of potential momentum unloading schemes.

Libration Point↗

Synergies Between the Kepler, K2 and TESS Missions with the PLATO Mission (Revised)

Two transit survey missions will have been flown by NASA prior to the launch of ESA's PLATO Mission in 2026, laying the groundwork for exoplanet discovery via the transit method. The Kepler Mission, which launched in 2009, collected data on its 100+ square degree field of view for four years before failure of a reaction wheel ended its primary mission. The results from Kepler include 2300+ confirmed or validated exoplanets, 2200+ planetary candidates, 2100+ eclipsing binaries. Kepler also revolutionized the field of asteroseismology by measuring the pressure mode oscillations of over 15000 solar-like stars spanning the lifecycle of such stars from hydrogen-burning dwarfs to helium-burning red giants. The re-purposed Kepler Mission, dubbed K2, continues to observe fields of view in and near the ecliptic plane for 80 days each, significantly broadening the scope of the astrophysical investigations as well as discovering an additional 156 exoplanets to date. The TESS mission will launch in 2017 to conduct an all-sky survey for small exoplanets orbiting stars 10X closer and 100X brighter than Kepler exoplanet host stars, allowing for far greater follow-up and characterization of their masses as well as their sizes for at least 50 small planets. Future assets such as James Webb Space Telescope, and ground-based assets such as ESOs Very Large Telescope (VLT) array, the Exremely Large Telescope (ELT), and the Thirty Meter Telescope (TMT) will be able to characterize the atmospheric composition and properties of these small planets. TESS will observe each 24 X 96 field of view for 30 days and thereby cover first the southern and then the northern hemisphere over 13 pointings during each year of the primary mission. The pole-most camera will observe the James Webb continuous viewing zone for one year in each hemisphere, permitting much longer period planets to be detected in this region. The PLATO mission will seek to detect habitable Earth-like planets with an instrument composed of 26 small telescopes in several 2232 square deg FOVs with a range of observation durations over a mission lifetime of up to eight years. This paper summarizes the findings of the KeplerK2 missions, previews the likely results from the TESS mission, and explores the lessons learned and to be learned from these prior missions that can be incorporated into the observation and data reduction strategy for the PLATO Mission so as to maximize the science return.

exoplanet detection↗

Kilopower: Small and Affordable Fission Power Systems for Space

The Nuclear Systems Kilopower Project was initiated by NASA's Space Technology Mission Directorate Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Nuclear Systems Kilopower Project centerpiece is the Kilopower Reactor Using Stirling Technology (KRUSTY) test, which consists of the development and testing of a fission ground technology demonstrator of a 1 kWe-class fission power system. The technologies to be developed and validated by KRUSTY are extensible to space fission power systems from 1 to 10 kWe, which can enable higher power future potential deep space science missions, as well as modular surface fission power systems for exploration. The Kilopower Project is cofounded by NASA and the Department of Energy National Nuclear Security Administration (NNSA).KRUSTY include the reactor core, heat pipes to transfer the heat from the core to the power conversion system, and the power conversion system. Los Alamos National Laboratory leads the design of the reactor, and the Y-12 National Security Complex is fabricating it. NASA Glenn Research Center (GRC) has designed, built, and demonstrated the balance of plant heat transfer and power conversion portions of the KRUSTY experiment. NASA MSFC developed an electrical reactor simulator for non-nuclear testing, and the design of the reflector and shielding for nuclear testing. In 2016, an electrically heated non-fissionable Depleted Uranium (DU) core was tested at GRC in a configuration identical to the planned nuclear test. Once the reactor core has been fabricated and shipped to the Device Assembly Facility at the NNSAs Nevada National Security Site, the KRUSTY nuclear experiment will be assembled and tested. Completion of the KRUSTY experiment will validate the readiness of 1 to 10 kWe space fission technology for NASAs future requirements for sunlight-independent space power. An early opportunity for demonstration of In-Situ Resource Utilization (ISRU) capability on the surface of Mars is currently being considered for 2026 launch. Since a space fission system is the leading option for power generation for the first Mars human outpost, a smaller version of a planetary surface fission power system could be built to power the ISRU demonstration and ensure its end-to-end validity. Planning is underway to start the hardware development of this subscale flight demonstrator in 2018.

Space nuclear power↗

NEOShield: Design of a Gravity Tractor Demonstration Mission

The Mission Design Division at NASA Ames Research Center has begun a program to develop mission designs for planetary defense. Here we present a mission design for a gravity tractor demonstration mission completed in collaboration with the European NEOShield consortium.We conducted a trade study to identify suitable target NEOs to demonstrate GT deflection, and identified 5 known asteroids with diameters between 100m and 500m that have been well studied in the past: 2000 FJ10, 2001 QC34, 2002 DU3, 2001 JV1 and 1998 VO. We selected 2000 FJ10 as the most suitable target to meet the requirements of a GT demonstration mission.Our GT demonstration spacecraft is based on an ESPA ring main structure and solar electric propulsion (SEP, see Figure 1). The power budget is 4 kW and the spacecraft has an initial wet mass of 1,150 kg. The spacecraft would launch in the 3rd quarter of 2026 aboard a Falcon 9, arriving at 2000 FJ10 in early 2029 after an unpowered Mars gravity assist in 2027. The spacecraft mass at asteroid arrival would be 1,100 kg.

Faber, N. T.↗

A Permanent Human Lunar Surface Presence Enabled by a CLV Class JUMP Lander

There are compelling advantages of a human presence on the surface of the Moon, as evidenced partly by the preponderance of lunar surface architectures that have existed throughout NASA, industry, and academia since the Apollo program. This paper specifically advocates and illustrates an example of a permanent human lunar surface presence enabled by a commercial launch vehicle (CLV) class Joinable Undercarriage to Maximize Payload (JUMP) lunar lander. The paper will discuss purposes for such a surface presence, including SPD-1 fulfillment, global collaboration, US industry advancement, US government leadership in spaceflight, a Mars dress rehearsal, Mars collaborative exploration, and lunar village development. An architectural description will be presented, including site selection, primary elements, and surface configuration. Element and lander allocation to CLV and Space Launch System (SLS) rockets will be discussed in terms of launch vehicle selection philosophy and allocation to specific launch manifests. This will enable a presentation of a lunar campaign spanning the period from 2026 to 2056. In conclusion, various aspects of the architecture will be suggested for further study.

Howard, Robert L., Jr.↗

The Feasibility of Directly Imaging Nearby Cold Jovian Planets with MIRI/JWST

The upcoming launch of the James Webb Space Telescope (JWST) will dramatically increase our understanding of exoplanets, particularly through direct imaging. Microlensing and radial velocity surveys indicate that some M dwarfs host long-period giant planets. Some of these planets will likely be just a few parsecs away and a few astronomical units from their host stars, a parameter space that cannot be probed by existing high-contrast imagers. We studied whether the coronagraphs on the Mid-infrared Instrument on JWST can detect Jovian-type planets around nearby M dwarfs. For a sample of 27 very nearby M dwarfs, we simulated a sample of Saturn–Jupiter-mass planets with three atmospheric configurations and three orbital separations, observed in three different filters. We found that the f1550c 15.5 μm filter is best suited for detecting Jupiter-like planets. Jupiter-like planets with patchy cloud cover, 2 au from their star, are detectable at 15.5 μm around 14 stars in our sample, while Jupiters with clearer atmospheres are detectable around all stars in the sample. Saturns were most detectable at 10.65 and 11.4 μm (f1065c and f1140c filters), but only with cloud-free atmospheres and within 3 pc (six stars). Surveying all 27 stars would take <170 hr of JWST integration time, or just a few hours for a shorter survey of the most favorable targets. There is one potentially detectable known planet in our sample: GJ 832 b. Observations aimed at detecting this planet should occur in 2024–2026, when the planet is maximally separated from the star.

Jonathan Brande↗

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

Concept for a Far-infrared Outgoing Radiation Closure Experiment – Antarctica (FORCE-A)

The next decade promises to be an incredibly exciting time in climate science. There are two new space flight missions, PREFIRE and FORUM, that will open the far-infrared spectrum to direct, accurate observations for the first time. PREFIRE is planned to operate between 2022 and 2024 and FORUM will launch in late 2025 or early 2026. The TICFIRE instrument is also a candidate for the NASA A-CCP mission to be launched in the 2028 timeframe. A key focus of these missions and instruments is improved understanding of polar climates. In support of these missions we present a concept for a radiative closure experiment to be conducted in Antarctica during the PREFIRE mission lifetime and then again during the operational FORUM and TICFIRE/A-CCP missions. The main component of the campaigns would be a long-duration balloon flight launched from McMurdo Station with the potential of 1-2 months aloft. Candidate balloon flight instrumentation includes a far-IR Fourier transform spectrometer and far-IR radiometers. Ground based instrumentation includes zenith viewing infrared and far-infrared spectrometers, lidars, and microwave radiometers. The objective of the FORCE-A campaign is to demonstrate radiative closure in the infrared with the multiple campaign instruments combined with the numerous relevant satellite instruments that pass overhead every 30 minutes (AIRS, CrIS, IASI, MODIS, VIIRS, CERES, BBR, Libera). The campaign will serve to advance radiation sciences as well as to provide the means for validation of the new far-infrared observations.

Martin G Mlynczak↗

Increasing Activity in T CrB Suggests Nova Eruption Is Impending

Estimates of the accretion rate in symbiotic recurrent novae (RNe) often fall short of theoretical expectations by orders of magnitude. This apparent discrepancy can be resolved if the accumulation of mass by the white dwarf(WD)is highly sporadic, and most observations are performed during low states. Here we use a re-analysis of archival data from the Digital Access to a Sky Century @Harvard survey to argue that the most recent nova eruption in symbiotic RN T CrB, in 1946, occurred during—and was therefore triggered by—a transient accretion high state. Based on similarities in the optical light curve around 1946 and the time of the prior eruption, in 1866,we suggest that the WD in T CrB accumulates most of the fuel needed to ignite the thermonuclear runaways (TNRs) during accretion high states. A natural origin for such states is dwarf-nova like accretion-disk instabilities, which are expected in the presumably large disks in symbiotic binaries. The timing of the TNRs in symbiotic RNe could thus be set by the stability properties of their accretion disks. T CrB is in the midst of an accretion high state like the ones we posit led to the past two nova eruptions. Combined with the approach of the time at which a TNR would be expected based on the 80 yr interval between the prior two novae (2026 ± 3), the current accretion high state increases the likelihood of a TNR occurring in T CrB in the next few years.

Gerardo J M Luna↗