Search NASA⌕ Search

SEARCH · Search NASA

Results for “ADMS Test Bed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

33 records · Page 2

SolarExPert: Large-Scale OPF, DSSE and HIL

This presentation, part of the ADMS Test Bed Webinar Series, discusses how to accelerate industry adoption of ADMS to improve normal operations with high levels of distributed energy resources (DERs) and improve resilience and reliability.

ADMS↗

A Framework to Demonstrate a DNP3 Interface With a CIM-Based Data Integration Platform: Preprint

The contemporary electrical grid is characterized by its complexity and abundance of data. A control-rich environment supported by information and communication technologies within an Advanced Distribution Management System (ADMS) presents a viable and cost-effective option for utility companies aiming to implement advanced real-time analytical schemes for monitoring and remotely controlling distribution feeders. Modular platform-based approaches to distribution operations require a structured framework for acquiring field device measurements, performing analytics, converting the setpoint to the correct protocol, and sending it on the appropriate communications network to the field devices. We present the development and deployment of an application service to integrate an open-source standardsbased platform with an ADMS test bed with field devices using the Distributed Network Protocol (DNP3) for data exchange. The step-by-step procedure for establishing the DNP3-Master service on an open-source distribution platform is outlined, comprehensively explaining the Master setup process. Moreover, sample use case results highlight the capabilities of the DNP3- Master service setup. Results demonstrate the scalability and configurability of the DNP3-Master service, making it adaptable for integration with other relevant applications, thus providing potential opportunities for real-world field trials and real-time assessments.

ADMS↗

Architecture Design and Validation for Autonomous Energy Systems

The architecture presentation discusses the requirement grid architecture design to integrate AES capabilities. Three NREL projects that cover control, communication, and operation architectures are discussed as reference AES implementations. Testing platforms and capabilities such as ADMS test bed are introduced to validate AES solutions and developed architectures.

architecture design↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS-based on real-time optimal power flow-controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources: Preprint

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS—based on real-time optimal power flow—controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

61 RADIATION PROTECTION AND DOSIMETRY↗

Using an Advanced Distribution Management System Test Bed to Evaluate the Impact of Model Quality on Volt/VAR Optimization: Preprint

In this paper, we present a test bed for evaluating existing and future advanced distribution management system (ADMS) applications in a realistic laboratory setting, including other utility management systems and field equipment. We present an example of using it to evaluate the impact of the ADMS network model quality on a Volt/VAR optimization (VVO) application. The test bed integrates a commercial ADMS with a real-time simulation model of a utility distribution feeder. Representative power and controller hardware are integrated through hardware-in-the-loop (HIL) techniques. The performance of the ADMS VVO application is also evaluated for different levels of measurement density. Initial results indicate that a higher model quality achieves the highest possible energy savings while avoiding voltage violations, whereas a lower model quality results in increased energy savings but at the expense of more voltage violations.

ADMS↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900-MHz LTE network↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications: Preprint

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900 MHz LTE network↗

A Data-Driven Voltage Control Strategy for Distribution Grids With Distributed Energy Resources

Traditionally, distribution system control approaches have been model-based. The deployment of advanced metering infrastructure has provided electric utilities with the capability of data-driven control with real-time measurements. The shift from model-based to data-driven control represents a significant advancement in the management of distribution systems, offering a more adaptive approach to system control because of the ability to dynamically adapt to changing conditions without the need for system modeling. Here, in this paper, a behavioral data-driven control method is developed to provide voltage regulation to an actual distribution system by controlling the legacy devices and distributed energy resource (DER) assets. The studied distribution system has a load tap changer and three capacitor banks as the legacy devices and photovoltaic systems as the DERs. The performance of the proposed control algorithm is validated using a laboratory test bed setup considering multiple scenarios. The results show that the proposed control achieved 99% voltage regulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗