Search NASA⌕ Search

SEARCH · Search NASA

Results for “ATD-2, IADS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

integrated arrival↗

Airspace Technology Demonstration 2 (ATD-2) Integrated Surface and Airspace Simulation - Experiment Plan

This presentation describes the objectives and high level setup for the human-in-the-loop simulation of the integrated surface and airsapce simulation of the ATD-2 Integrated Arrival, Departure, Surface (IADS) system. The purpose of the simulation is to evaluate the functionality of the IADS system, including tactical surface scheduler, negotiation of departure times for the flights under Traffic Management Initiatives (TMIs), and data exchange between ATC Tower and airline Ramp. The same presentation was presented to serve the experiment review prior to the simulation.

Surface↗

Insights Gained from the Ongoing Integrated Arrival/Departure/Surface (IADS) Traffic Flow Operational Prototype

The Insights Gained from the Ongoing Integrated Arrival/Departure/Surface (IADS) Traffic Flow Operational Prototype presentation will include a definition of the learning objectives for the audience, an overview/explanation of the ATD-2 project, an overview of the ATC/Operator data exchange and integration that is foundational for advanced surface capability, and a description of the ATC/Operator data exchange and integration research questions and insights. It will also give an overview of the overhead stream around CLT and a preview of the operational integration benefits, research questions, and insights related to the overhead stream. It will continue with a surface metering process flow overview, a description of local surface demand/capacity imbalance, the benefits of collaborative surface metering, the associated research questions and insights, and wrap up with the next steps planned for ATD-2.

collaborative operational environment↗

Airspace Technology Demonstration 2 (ATD-2) Technology Description Document (TDD)

This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration's (NASA) Airspace Technology Demonstration 2 (ATD-2) project, to be demonstrated beginning in 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA is developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research will be demonstrated at the CLT airport beginning in 2017. Phase 1 will provide the initial demonstration of the integrated system with strategic and tactical scheduling, tactical departure scheduling to an en route meter point, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.

integrated arrival↗

Airspace Technology Demonstration 2 (ATD-2) Integrated Surface and Airspace Simulation - Experiment Plan

This presentation describes the overview of the ATD-2 project and the integrated simulation of surface and airspace to evaluate the procedures of IADS system and evaluate surface metering capabilities via a high-fidelity human-in-the-loop simulation. Two HITL facilities, Future Flight Central (FFC) and Airspace Operations Laboratory (AOL), are integrated for simulating surface operations of the Charlotte-Douglas International Airport (CLT) and airspace in CLT TRACON and Washington Center.

ATD-2↗

Operational Impact of the Baseline Integrated Arrival, Departure, and Surface System Field Demonstration

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA and industry known as Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. The ATD-2 field demonstration is organized into three phases. Phase I illustrates a Baseline IADS demonstration and includes all components of ATD-2 running in operational environments. Subsequent phases will fuse together strategic scheduling components as well as take into account metroplex considerations. This paper describes the baseline IADS system that was deployed at the end of 2017 and is continuing to run as part of the ATD-2 demonstration taking place at Charlotte-Douglas International Airport (CLT). The primary areas of deployment and system use are in the CLT Air Traffic Control Tower, CLT TRACON, CLT American Airlines ramp tower, Washington Center facility and American Airlines Integration Operations Center (IOC). In addition to describing the functions and capabilities that are part of the baseline IADS system, this paper also provides metrics regarding operational use as well as initial benefits metrics. Benefit metrics continue to be collected and aggregated across the areas of system delay, throughput, taxi time, fuel burn savings, and emissions savings. Furthermore, benefits as a result of common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are described. The overall benefit of improved predictability and efficiency as a result of the baseline IADS system demonstration is also discussed.

operational system↗

Ramp Traffic Console (RTC) Capabilities and Use in Operational Environment (Part 1)

This presentation provides an overview of ramp traffic control (RTC) and ramp manager traffic console (RMTC) features of ATD-2 Integrated Arrival, Departure, and Surface (IADS) system and will discuss operational use cases that cover surface metering, notification and optional hold of APREQ (approval request/call for release), EDCT (expected departure clearance time), and ground stops.

Airline Ramp Decision Support↗

Tactical Surface Metering Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. The primary goal of the ATD-2 project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure and surface prediction, scheduling, and management systems. In the Phase 1 Baseline IADS Demonstration, the tactical surface scheduling capability and the user interfaces for ramp controllers and ramp traffic managers were implemented for ramp operations. The purpose of the tactical surface scheduling capability is to provide the airline ramp controller with aircraft pushback advisories that prevent surface congestion and to respond to surface and airspace constraints that become known over relatively short time horizons. For this purpose, the tactical surface metering tool first estimates the capacity of current and near-future runway resources from flight schedule and surveillance data. With demand forecasts and predicted taxi trajectories, this tool computes an efficient runway schedule of aircraft in the planning horizon based on their readiness, Earliest Off-Block Times (EOBTs), and a ration by schedule (RBS) rule. Details on the implementation of the Tactical Surface Metering tool will be provided in the full paper. Both pushback and recommended hold times advisories provided by this surface metering tool are shown on the user interfaces for the ramp controller and the ramp traffic manager, called Ramp Traffic Console (RTC) and Ramp Manager Traffic Console (RMTC), respectively. There is excess queue time in the system due to demand capacity imbalance, this time can be taken as a hold on the runway queue or at the gate and was referred to as the Metering Value. This metering value can be adjusted by the Ramp Manager in collaboration with Air Traffic Controller-Tower Traffic Management Coordinator (TMC). They selected a set of metering values as default values for the tool during human-in-the-loop simulation. As the metering value increases, there is a decrease in the gate hold and increase in the queue time at the runway. Procedures and Information needs related to managing the surface metering procedures were researched in the simulated environment. These procedures will be compared to the procedures adopted at Charlotte Douglas International Airport when the tools were deployed and adopted in November 2017 for one departure push bank per day. Feedback regarding initial issues, information needs such as the need to see EOBTs on the flight data tags and how they compare to scheduled times will also be discussed in the full paper. Initial results will be provided regarding the choice of the metering value and how it was adjusted on a daily basis and what procedures evolved will also be presented in the paper.

surface metering↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Air Traffic Management Demonstration 2 project is investigating Integrated Arrival-Departure-Surface (IADS) air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the IADS areas under study are departure release-time approval request (APREQ) traffic management initiatives. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations. It describes APREQ-compliance improvements observed as the ATD-2 electronic negotiation process has matured and discusses contributing factors.

call for release↗

On-Time Performance ASPM Non-Parametric Statistical Analysis

The purpose of this analysis is to provide a data-driven examination of two selected flight metrics, i.e., (1) total taxi-out time and (2) actual off time minus scheduled off block time. More specifically, Aviation System Performance Metrics (ASPM) data were analyzed to determine any possible differences in CLT (Charlotte Douglas International Airport) departure flights on these two metrics when comparing pre-IADS (Integrated Arrival, Departure, and Surface Operations) against post-IADS metering operations. This was originally presented to the ATD-2 (Airspace Technology Demonstration-2) Analytics team in August 2018.

tech transfer↗

Scheduling Improvements Following the Phase 1 Field Evaluation of the ATD-2 Integrated Arrival, Departure, and Surface Concept

NASA is conducting the Airspace Technology Demonstration-2 (ATD-2) to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system that extends traffic sequencing for the entire life-cycle of a flight from departure gate to arrival gate within multi-airport, metroplex environments. After development and testing in human-in-the-loop simulations, the IADS system was deployed to Charlotte Douglas International Airport for a three-year field evaluation. From the initial IADS concept development through the end of the Phase 1 field evaluation many lessons were learned with regards to the IADS scheduler. In this paper we describe how data from the Phase 1 field evaluation helped identify scheduler improvements and guided the implementation of refinements. The improvements in the IADS scheduler described in this paper are incorporated into the IADS Phase 2 scheduler enabling strategic Surface Metering Programs and will be evaluated during the field evaluation.

Airspace Technology Demonstration-2↗

Departure Approval Request Compliance Effects on Overhead Stream Insertion

Integrated Arrival-Departure-Surface (IADS) air traffic management relies on information sharing and integration between automation systems for efficiency, predictability, and throughput improvements throughout the National Airspace System (NAS). The NASA Airspace Technology Demonstration 2 (ATD-2) project supports this effort by integrating SWIM (System Wide Information Management) information and evaluating and refining potential TFDM (Terminal Flight Data Manager) functionality in a surface traffic management system fielded at Charlotte-Douglas International Airport (CLT). Among the IADS areas under study during ATD-2 is the use of electronically negotiated departure times for efficiently inserting flights into overhead traffic streams. Stream-insertion accuracy is important for reducing excessive vectoring that negatively impacts the NAS by increasing controller workload along with aircraft fuel burn and emissions. Departure-time approval requests (APREQs) provide center-approved departure times to allow for smooth stream insertion. In this presentation, TBFM (Time-Based Flow Management) and ATD-2 flight summary data are used to empirically show that APREQ compliance leads to improved stream insertion.

Overhead-Stream Insertion↗

Operational Characteristics Identification and Simulation Model Verification for Incheon International Airport

Incheon International Airport (ICN) is one of the hub airports in East Asia. Airport operations at ICN have been growing more than 5 percent per year in the past five years. According to the current airport expansion plan, a new passenger terminal will be added and the current cargo ramp will be expanded in 2018. This expansion project will bring 77 new stands without adding a new runway to the airport. Due to such continuous growth in airport operations and future expansion of the ramps, it will be highly likely that airport surface traffic will experience more congestion, and therefore, suffer from efficiency degradation. There is a growing awareness in aviation research community of need for strategic and tactical surface scheduling capabilities for efficient airport surface operations. Specific to ICN airport operations, a need for A-CDM (Airport - Collaborative Decision Making) or S-CDM (Surface - Collaborative Decision Making), and controller decision support tools for efficient air traffic management has arisen since several years ago. In the United States, there has been independent research efforts made by academia, industry, and government research organizations to enhance efficiency and predictability of surface operations at busy airports. Among these research activities, the Spot and Runway Departure Advisor (SARDA) developed and tested by National Aeronautics and Space Administration (NASA) is a decision support tool to provide tactical advisories to the controllers for efficient surface operations. The effectiveness of SARDA concept, was successfully verified through the human-in-the-loop (HITL) simulations for both spot release and runway operations advisories for ATC Tower controllers of Dallas-Fort Worth International Airport (DFW) in 2010 and 2012, and gate pushback advisories for the ramp controller of Charlotte-Douglas International Airport (CLT) in 2014. The SARDA concept for tactical surface scheduling is further enhanced and is being integrated into NASA's Airspace Technology Demonstration-2 (ATD-2) project for technology demonstration of Integrated Arrival-Departure-Surface (IADS) operations at CLT. This study is a part of the international research collaboration between KAIA (Korea Agency for Infrastructure Technology Advancement), KARI (Korea Aerospace Research Institute) and NASA, which is being conducted to validate the effectiveness of SARDA concept as a controller decision support tool for departure and surface management of ICN. This paper presents the preliminary results of the collaboration effort. It includes investigation of the operational environment of ICN, data analysis for identification of the operational characteristics of the airport, construction and verification of airport simulation model using Surface Operations Simulator and Scheduler (SOSS), NASA's fast-time simulation tool.

surface operations analysis↗

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface (IADS) Capabilities at Charlotte Douglas International Airport (CLT)

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

and Surface (IADS)↗

Identifying Key Issues and Potential Solutions for Integrated Arrival, Departure, Surface Operations by Surveying Stakeholder Preferences

NASA's Aeronautics Research Mission Directorate (ARMD) collaborates with the FAA and industry to provide concepts and technologies that enhance the transition to the next-generation air-traffic management system (NextGen). To facilitate this collaboration, ARMD has a series of Airspace Technology Demonstration (ATD) sub-projects that develop, demonstrate, and transitions NASA technologies and concepts for implementation in the National Airspace System (NAS). The second of these sub-projects, ATD-2, is focused on the potential benefits to NAS stakeholders of integrated arrival, departure, surface (IADS) operations. To determine the project objectives and assess the benefits of a potential solution, NASA surveyed NAS stakeholders to understand the existing issues in arrival, departure, and surface operations, and the perceived benefits of better integrating these operations. NASA surveyed a broad cross-section of stakeholders representing the airlines, airports, air-navigation service providers, and industry providers of NAS tools. The survey indicated that improving the predictability of flight times (schedules) could improve efficiency in arrival, departure, and surface operations. Stakeholders also mentioned the need for better strategic and tactical information on traffic constraints as well as better information sharing and a coupled collaborative planning process that allows stakeholders to coordinate IADS operations. To assess the impact of a potential solution, NASA sketched an initial departure scheduling concept and assessed its viability by surveying a select group of stakeholders for a second time. The objective of the departure scheduler was to enable flights to move continuously from gate to cruise with minimal interruption in a busy metroplex airspace environment using strategic and tactical scheduling enhanced by collaborative planning between airlines and service providers. The stakeholders agreed that this departure concept could improve schedule predictability and suggested several key attributes that were necessary to make the concept successful. The goals and objectives of the planned ATD-2 sub-project will incorporate the results of this stakeholder feedback.

integrated arrival/departure/surface operations↗

ATD-2 Update for TBFM/TFDM Ops Teams

This presentation was developed to update the TBFM/TFDM operational teams on ATD-2 Phase 2 progress and Phase 3 plans. It includes top-level compliance data and APREQ delay data, processes for data exchange between ATD-2 and TBFM and surface metering, and potential benefits of EOBTs.

ATD-2↗

Real Time Metrics and Analysis of Integrated Arrival, Departure, and Surface Operations

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA and industry known Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. As trajectory-based departure scheduling and collaborative decision making tools are introduced in order to reduce delays and uncertainties in taxi and climb operations across the National Airspace System, users of the tools across a number of roles benefit from a real time system that enables common situational awareness. A real time dashboard was developed to inform and present users notifications and integrated information regarding airport surface operations. The dashboard is a supplement to capabilities and tools that incorporate arrival, departure, and surface air-traffic operations concepts in a NextGen environment. In addition to shared situational awareness, the dashboard offers the ability to compute real time metrics and analysis to inform users about capacity, predictability, and efficiency of the system as a whole. This paper describes the architecture of the real time dashboard as well as an initial proposed set of metrics. The potential impact of the real time dashboard is studied at the site identified for initial deployment and demonstration in 2017: Charlotte-Douglas International Airport (CLT). The architecture of implementing such a tool as well as potential uses are presented for operations at CLT. Metrics computed in real time illustrate the opportunity to provide common situational awareness and inform users of system delay, throughput, taxi time, and airport capacity. In addition, common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are explored. The potential of the real time tool to inform users of the predictability and efficiency of using a trajectory-based departure scheduling system is also discussed.

integrated arrival departure surface operations↗

Operational Impact of the Baseline Integrated Arrival, Departure and Surface System Field Demonstration

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA (Federal Aviation Administration) and industry known Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. As trajectory-based departure scheduling and collaborative decision making tools are introduced in order to reduce delays and uncertainties in taxi and climb operations across the National Airspace System, users of the tools across a number of roles benefit from a real time system that enables common situational awareness. A real time dashboard was developed to inform and present users notifications and integrated information regarding airport surface operations. The dashboard is a supplement to capabilities and tools that incorporate arrival, departure, and surface air-traffic operations concepts in a NextGen environment. In addition to shared situational awareness, the dashboard offers the ability to compute real time metrics and analysis to inform users about capacity, predictability, and efficiency of the system as a whole. This paper describes the architecture of the real time dashboard as well as an initial proposed set of metrics. The potential impact of the real time dashboard is studied at the site identified for initial deployment and demonstration in 2017: Charlotte-Douglas International Airport (CLT). The architecture of implementing such a tool as well as potential uses are presented for operations at CLT. Metrics computed in real time illustrate the opportunity to provide common situational awareness and inform users of system delay, throughput, taxi time, and airport capacity. In addition, common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are explored. The potential of the real time tool to inform users of the predictability and efficiency of using a trajectory-based departure scheduling system is also discussed.

air traffic optimization↗