Search NASA⌕ Search

SEARCH · Search NASA

Results for “Artemis Accords”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

35 records · Page 2

Nightside Time Domain Electromagnetic Sounding with ARTEMIS: Challenges of Isolating Induction from the Lunar Interior

Electromagnetic sounding analyses THEMIS-ARTEMIS magnetic field data to isolate and identify induced magnetic fields to determine the electrical conductivity of the lunar interior. The transfer function method uses two observations one near the Moon and one far from lunar effects. We focus on induction within the nightside wake cavity performing a visual inspection in the time domain. Large transients are naturally occurring and can excite telluric currents within conducting layers within the lunar interior according to the skin depth of the signal. Time windows within wake passes with one probe close and the other far have been identified within 10 years of ARTEMIS data. We discuss initial conclusions and challenges of isolating interior induction within the lunar plasma environment.

Moons↗

Human Landing System (HLS) Program Non-Design Driver Lunar Environments

The purpose of this white paper is to provide a source of information on lunar environments which, according to scientific and engineering consensus, should not impact human-class spacecraft design. Additionally, comparisons are shown between the Apollo missions and Artemis mission parameters for solar lighting angles at the landing sites and plasma region exposure.

HLS↗

James Webb Space Telescope Fuel Slosh Estimation

The mitigation of fuel slosh in microgravity environments is a pressing matter for the control of both manned and unmanned spacecraft. Recent work has investigated negative mass modeling of fuel slosh using Lie Group SE(3) . This paper applies Lie group SE(3) to the full body problem of spacecraft dynamics to investigate attitude perturbations caused by fuel slosh aboard the James Webb Space Telescope (JWST). We develop a dynamical model to parse these perturbations from slew telemetry data via residuals analysis. This model uses a novel, N-body Runge-Kutta integrator in the special Euclidean group SE(3). The enhanced ability to validate fuel slosh models reduces settling time after slew operations and, accordingly, maximizes available science time.

GN&C↗

James Webb Space Telescope Fuel Slosh Estimation

The mitigation of fuel slosh in microgravity environments is a pressing matter for the control of both manned and unmanned spacecraft. This paper investigates the attitude perturbations caused by fuel slosh aboard the James Webb Space Telescope (JWST). We develop a dynamical model to parse these perturbations from slew telemetry data. This model uses special Euclidean group SE(3) as well as a novel, N-body variational integrator. The enhanced ability to validate fuel slosh models offers the reduction of settling time after slew operations and, accordingly, the maximization of available science time.

GN&C↗

Moon to Mars (M2M) Cross Program Utilization Payload Safety Process

It is the goal of Moon to Mars (M2M) to establish a single consolidated set of safety requirements and a safety review process for utilization payloads that will cross program vehicle hatches or operate externally on multiple program vehicles during transport or operation that satisfies Exploration Ground Systems (EGS), Orion, EVA, and Human Surface Mobility Program (EHP), Gateway (GW), and Human Landing System (HLS) programs. This document defines the Cross Program Utilization Payload (xPUP) safety review process for mission effectivity of Artemis III and beyond. This review process will help ensure protection of the overall Moon to Mars integrated system from potential hazards created by cross program payloads that either cross a program vehicle hatch or can interface with more than one M2M lunar exploration program vehicle. The process will identify payload hazards and controls that will protect ground personnel, flight crew, the integrated vehicle, ground equipment, or facilities. This process is also applicable to samples that cross hatches between vehicles including for return to Earth. The xPUP safety review process will be led by one of the M2M programs' integration safety panels, chosen on a per-payload basis. After the lead integration safety panel is determined, the common safety process is established, based on pre-determined criteria, which includes ad-hoc members from other stakeholder programs. Stakeholder programs are those that interface with the utilization payload in any way (e.g., operating on a lunar exploration vehicle or crossing program vehicle hatches). The xPUP will execute this safety review process for flight and ground utilization payload hardware design, its ground support equipment, and landing and recovery in accordance with the applicable safety requirements as specified in M2M-30043: Moon to Mars Cross Program Utilization Payload Safety Requirements. The xPUP safety process will follow the lead integration safety panel’s safety process requirements. Formal agreements will be communicated with the payload developer using the payload integration processes documented in M2M-30037, Artemis Payload Integration Implementation Plan.

payloads↗

Risk and Performance Assessment of Generic Mission Architectures: Showcasing the Artemis Mission

A has initiated a strong push to return face. In this work, we astronaut assess performance and risk for proposed mission architectures using a new Mission Architecture Risk Assessment (MARA) tool. The MARA tool can produce statistics about the availability of components and overall performance of the mission considering potential failures of any of its components. In a Monte Carlo approach, the tool repeats the mission simulation multiple times while a random generator lets modules fail according to their failure rates. The results provide statistically meaningful insights into the overall performance of the chosen architecture. A given mission architecture can be freely replicated in the tool, with the mission timeline and basic characteristics of employed mission modules (habitats, rovers, power generation units, etc.) specified in a configuration file. Crucially, failure rates for each module need to be known or estimated. The tool performs an event-driven simulation of the mission and accounts for random failure events. Failed modules can be repaired, which takes crew time but restores operations. In addition to tracking individual modules, MARA can assess the availability of predefined functions throughout the mission. For instance, the function of resource collection would require a rover to collect the resources, a power generation unit to charge the rover, and a resource processing module. Together, the modules that are required for a given function are called a functional group. Similarly, we can assess how much crew time is available to achieve a mission benefit (e.g. research, building a base, etc) as opposed to spending crew time on repairs. Here we employ the method on the proposed NASA Artemis mission. Artemis aims to return United States astronauts to the lunar surface by 2024. Results provide insights into mission failure probabilities, up- and downtime for individual modules and crew-time resources spent on the repair of failed modules. The tool also allows us to tweak the mission architecture in order to find setups that produce more favorable mission performance. As such, the tool can be an aid in improving the mission architect abling cost-benefit analysis for mission improvement.

Rumpf, Clemens M.↗

Space Biology Beyond LEO Instrumentation & Science Series Science Working Group 2022 Annual Report

Humans are poised to explore deep space: the realm of space beyond Earth's orbit. NASA will soon send humans back to the Moon with the Artemis program, and is developing programs to support crewed missions to Mars. Human exploration of such new environments demands fundamental research that can provide the knowledge necessary to ensure the safety of explorers and aid in the development of a sustainable presence in space. Accordingly, the Agency's Moon to Mars objectives1 include three goals in the area of Human Biological Sciences (HBS-1, -2, -3), with the aim to "Advance understanding of how biology responds to the environments of the Moon, Mars, and deep space to advance fundamental knowledge, support safe, productive human space missions and reduce risks for future exploration." Advancing this understanding is a task that is both complex-- comprising diverse organisms, processes, and methods-- and difficult-- because the very aspects of deep space that we strive to understand are the aspects that make it hard to conduct research in that environment. This report of the Beyond LEO Instrumentation & Science Series Science Working Group (BLISS-SWG) represents input from a group of scientists from diverse disciplines within the space biology research and engineering community on the nature of the science and technology that can be used to achieve those aims.

Space Biology↗

Evidence for retrograde lithospheric subduction on Venus

Annular moats and outer rises around large Venus coronas such as Artemis, Latona, and Eithinoha are similar in arcuate planform and topography to the trenches and outer rises of terrestrial subduction zones. On earth, trenches and outer rises are modeled as the flexural response of a thin elastic lithosphere to the bending moment of the subducted slab; this lithospheric flexure model also accounts for the trenches and outer rises outboard of the major coronas on Venus. Accordingly, it is proposed that retrograde lithospheric subduction may be occurring on the margins of the large Venus coronas while compensating back-arc extension is occurring in the expanding coronas interiors. Similar processes may be taking place at other deep arcuate trenches or chasmata on Venus such as those in the Dali-Diana chasmata area of aestern Aphrodite Terra.

Sandwell, David T.↗

Pargo Chasma and its relationship to global tectonics

Pargo Chasma was first identified on Pioneer Venus data as a 10,000 km long lineation extending from Atla Regio in the north terminating in the plains south of Phoebe Regio. More recent Magellan data have revealed this feature to be one of the longest chains of coronae so far identified on the planet. Stofan et al have identified 60 coronae and 2 related features associated with this chain; other estimates differ according to the classification scheme adopted, for example Head et al. identify only 29 coronae but 43 arachnoids in the same region. This highlights one of the major problems associated with the preliminary mapping of the Magellan data: there has been an emphasis on identifying particular features on Venus without a universally accepted scheme to classify those features. Nevertheless, Pargo Chasma is clearly identified as a major tectonic belt of global significance. Together with the Artemis-Atla-Beta tectonic zone and the Beta-Phoebe rift belt, Pargo Chasma defines a region on Venus with an unusually high concentration of tectonic and volcanic features. Thus, an understanding of the processes involved in the formation of Pargo Chasma may lend significant insight into the evolution of the region and the planet as a whole. I have produced a detailed 1 to 10 million scale map of Pargo Chasma and the surrounding area from preliminary USGS controlled mosaiced image maps of Venus constructed from Magellan data. In view of the problems highlighted above in relation the efforts already made at identifying a particular set of features I have mapped the region purely on the basis of the geomorphology visible in the magellan data without any attempt at identifying a particular set or class of features. Thus, the map produced distinguishes between areas of different brightness and texture. This has the advantage of highlighting the tectonic fabric of Pargo Chasma and clearly illustrates the close inter-relationship between individual coronae and the surrounding tectonic belts.

Ghail, R. C.↗

Enabling a Larger Deep Space Mission Suite: A Deep Space Network Queuing Antenna for Demand Access

The advent of deep space small spacecraft, as exemplified by the Mars Cubesat One (MarCO), Lunar Trailblazer, Janus, the Escape and Plasma Acceleration and Dynamics Explorers (EscaPADE), and the thirteen Artemis 1 missions, opens the possibility that a much larger number of deep space spacecraft may be launched over the next 10 years and beyond. While scientifically exciting, the prospect of a (much) larger mission suite raises significant challenges for the current approach to ground stations and mission operations. We have been investigating an integrated approach for ground stations and missions operations to enable new modes of operation while maintaining the capabilities of the current operational techniques. This integrated approach is built around three core capabilities: (1) A queuing antenna that enables monitoring the status of a much larger number of spacecraft, and allows spacecraft to transmit requests for telemetry with NASA’s Deep Space Network (DSN); (2) a flexible scheduling system that expands the current DSN scheduling services to enable allocating time on DSN antennas in near real-time; and (3) a cloud-based ground data system that can be spun up and down according to how tracks are assigned by the flexible scheduling system. We shall show that an 18 meter DSN queuing antenna equipped with cyrogenic receivers would enable use of the DSN Demand Access Service for small spacecraft throughout the inner Solar System, thus providing service to a large mission suite. We first discuss the architecture of the queuing antenna and its supporting systems, including, for instance, the service required to generate the schedule for the queueing antenna (which dictates how it slews to monitor multiple spacecraft in a day of operations). Next, we describe the signaling scheme used to encode a request, which is inherited from the already operational DSN Beacon Tone Service, and describe two alternative ways to detect the incoming tone at the ground station, one based on maximum likelihood estimation (MLE), and another one based on Fast-Fourier Transfer (FFT) processing. We then use these results to estimate the maximum range at which a request can be reliably detected as a function of the spacecraft and ground station communication capabilities. Finally, the last part of this part of this paper briefly describes the prototyping effort undertaken at Morehead State University (MSU) and JPL to demonstrate the viability of this new DSN demand access. In particular, we describe the suite of tests conducted using MSU’s 21 meter ground station to validate its use a queuing antenna.

Mattle, Emily↗

Early Assessments of Crew Timelines for the Lunar Surface Habitat

As NASA progresses towards sustained crewed space missions, crew timelines will become increasingly important to achieving mission goals. While it is desirable to spend as much time as possible during crewed space missions on science activities and experiments, there are a large number of activities that crew members must perform each day in order to maintain both crew and vehicle health and safety. The time available for science activities in space is highly dependent on mandatory tasks required for crew and vehicle health and safety. The different crewed activities need to be planned accordingly long before the start of a mission in order to optimize crew time for science. To begin assessing the potential crew time for available for science, an understanding of the requirements to maintain crew and vehicle health and safety is needed. These additional activities may include sleep, exercise, vehicle maintenance, logistics handling, crew personal time, as well as many other tasks. The remaining time outside of these required tasks, within a reasonable crew work schedule, can be dedicated to science operations. This paper will detail a collaborative effort to analyzing crew times for sustained spaceflight missions and how the results of that analysis are applied to the crew timeline for the proposed Lunar Surface Habitat (SH).To determine the crew time for all of these required activities, an analysis was conducted utilizing defined agency requirements and historical crewed mission data. Predicted crew activity times were integrated into a daily schedule in order to optimize the crew’s time during the mission. This methodology was utilized to produce expected crew timelines for NASA’s proposed Artemis Base Camp (ABC) missions. The current plans for the ABC contain two different sustained habitats, the Pressurized Rover (PR) and the Surface Habitat (SH). While the crew are separated between the two habitats, the timelines for each element are dependent on the other element’s operations, so the two element timelines are formed in conjunction with one another. The results described in this paper, however, will focus solely on the crew timeline in the SH. This paper will explain the methodology behind predicting the required crew time spent in the SH for each activity, and the process of incorporating these predicted crew times into a coherent schedule.

Crew Time↗

Mission Analysis, Operations, and Navigation Toolkit Environment (Monte) Version 040

Monte is a software set designed for use in mission design and spacecraft navigation operations. The system can process measurement data, design optimal trajectories and maneuvers, and do orbit determination, all in one application. For the first time, a single software set can be used for mission design and navigation operations. This eliminates problems due to different models and fidelities used in legacy mission design and navigation software. The unique features of Monte 040 include a blowdown thruster model for GRAIL (Gravity Recovery and Interior Laboratory) with associated pressure models, as well as an updated, optimalsearch capability (COSMIC) that facilitated mission design for ARTEMIS. Existing legacy software lacked the capabilities necessary for these two missions. There is also a mean orbital element propagator and an osculating to mean element converter that allows long-term orbital stability analysis for the first time in compiled code. The optimized trajectory search tool COSMIC allows users to place constraints and controls on their searches without any restrictions. Constraints may be user-defined and depend on trajectory information either forward or backwards in time. In addition, a long-term orbit stability analysis tool (morbiter) existed previously as a set of scripts on top of Monte. Monte is becoming the primary tool for navigation operations, a core competency at JPL. The mission design capabilities in Monte are becoming mature enough for use in project proposals as well as post-phase A mission design. Monte has three distinct advantages over existing software. First, it is being developed in a modern paradigm: object- oriented C++ and Python. Second, the software has been developed as a toolkit, which allows users to customize their own applications and allows the development team to implement requirements quickly, efficiently, and with minimal bugs. Finally, the software is managed in accordance with the CMMI (Capability Maturity Model Integration), where it has been ap praised at maturity level 3.

Sunseri, Richard F.↗

Risk-Reduction Autonomy Implementation to Enable NASA Artemis Missions

To achieve NASA’s Artemis program mission objectives a high level of autonomy that is ubiquitous throughout the systems that are being developed will be necessary. The autonomous systems of Artemis will require a distributed autonomy capability, with autonomous systems organized functionally in a hierarchical architecture, where systems at higher levels of the hierarchy have authority over systems at lower levels. The challenge of developing autonomy technologies and Concepts of Operations (ConOps) for Artemis has been undertaken by the NASA Gateway Working Group. This group has developed requirements, architectures, ConOps, and interface control documents (ICDs), in the context of a hierarchical distributed architecture that includes the following: a Vehicle System Manager (VSM) that autonomously manages the entire Gateway; Module System Managers (MSMs) that autonomously manage each module; and System Managers (SMs) that autonomously manage systems within a module (i.e. ECLSS). A substantially high level of autonomy needs to be achieved by each element of the hierarchy (VSM, MSM, SM) to meet requirements for uncrewed operations; this includes conditions that will have minimal and/or delayed ground intervention (i.e. requirements for sustainability for months of operation without crew or ground support). To advance an implementation of this autonomy design (Gateway Autonomy Design – GAD), a collaboration was established between the Autonomous Systems Laboratory (ASL) at NASA Stennis Space Center and Lockheed Martin. The objectives of this partnership were the following: (1) to implement autonomy at the VSM, MSM, and SM levels; (2) to implement communications among a VSM, 2 MSMs, ORION (a visiting vehicle somewhat equivalent to a module) and 1 SM (a power system), and (3) test autonomous operations with representative use cases. A SM backed by a high-fidelity simulation was created to facilitate demonstrations of use cases that originated in a system of a module. Communication between the VSM and MSMs was implemented according to Concepts of Operations and Interface Control Documents (ICDs). Demonstrations were conducted to address nominal and off-nominal operations and multi-module interactions with the VSM. Additionally, user interfaces were created to provide awareness about ongoing processes and results while enhancing the demonstration. Demonstrations included the following use cases: (1) Orion as visiting vehicle registers with VSM; (2) VSM reschedules a module’s timelines when another module’s MSM task fails; and (3) a module’s Power System Manager (PSM) demonstration that included component failure diagnostics, tracing component failure to effected components, which in turn, reports failure information up to the VSM for acknowledgement and display. This paper will describe the detailed technology and autonomous systems developed, and the integrated multi-module demonstrations conducted. Also, challenges that must be met to fully implement the GAD defined by Gateway will be addressed.

Fernando Figueroa↗

Risk-Reduction Autonomy Implementation to Enable NASA Artemis Missions

To achieve NASA’s Artemis program mission objectives a high level of autonomy and ubiquitous autonomy throughout the systems that are being developed will be necessary. The autonomous systems of Artemis will require a distributed autonomy capability, with autonomous systems organized functionally in a hierarchical architecture, where systems at higher levels of the hierarchy have authority over systems at lower levels. The challenge of developing autonomy technologies and concepts of operations for Artemis has been undertaken by the NASA Gateway Working Group. This group has developed requirements, architectures, concepts of operations, and interface control documents, in the context of a hierarchical distributed architecture that includes the following: a Vehicle System Manager (VSM) that autonomously manages the entire Gateway; Module System Managers (MSMs) that autonomously manage each module; and System Managers (SMs) that autonomously manage systems within a module(i.e. ECLSS).A substantially high level of autonomy needs to be achieved by each element of the hierarchy (VSM, MSM, SM)to meet requirements for uncrewed operations; this includes conditions that will have minimal and/or delayed ground intervention (i.e. requirements for sustainability for months of operation without crew or ground support). To advance an implementation of this autonomy design (Gateway Autonomy Design –GAD), a collaboration was established between the Autonomous Systems Laboratory (ASL) at NASA Stennis Space Center and Lockheed Martin. The objectives of this partnership were the following: (1)to implement autonomy at the VSM, MSM, and SM levels;(2) to implement communications among a VSM, 2 MSMs, ORION (a visiting vehicle somewhat equivalent to a module) and 1 SM (a power system), and (3) test autonomous operations with representative use cases. A SM backed by a high-fidelity simulation was created to facilitate demonstrations of use cases that originated in a system of a module. Communication between the VSM and MSMs was implemented according to Concepts of Operations and Interface Control Documents (ICDs). Demonstrations were conducted to address nominal and off-nominal operations and multi-module interactions with VSM. Additionally, user interfaces were created to provide awareness about ongoing processes and results while enhancing the demonstration. Demonstrations included the following use cases: (1)Orion as visiting vehicle registers with VSM;(2) VSM reschedules a module’s timelines when another module’s MSM task fails; and (3) a module’s Power System Manager (PSM) standalone demonstration that included component failure diagnostics, tracing component failure to effected components, which in turn, reports failure information up to the VSM for acknowledgement and display. This paper will describe the detailed technology and autonomous systems developed, and the integrated multi-module demonstrations conducted. Also, challenges that must be met to fully implement the GAD defined by Gateway will be addressed.

Autonomous Systems↗

Kinematic Sensors Evaluation for Spaceflight Exercise Data Collections

INTRODUCTION: On the International Space Station (ISS), exercise feedback from astronauts is very important to diagnose and mitigate any form-related injuries and ensure efficacious exercise prescriptions and systems. Going forward, exploration exercise efforts seek to gain further quantitative data of human and system performance. Currently, methods of collecting in-flight exercise data on the ISS are limited to marker-based motion capture (MoCap) where astronauts must wear reflective markers over their clothes and specialized cameras are used. The main objective of this work was to investigate the following alternative tracking options: markerless video-based MoCap and inertial measurement units (IMUs). These were compared against traditional marker-based MoCap to evaluate kinematic accuracy and inform feasible methods for future exercise data collections on the ISS, especially in support of future Vibration Isolation and Stabilization (VIS) system development. METHODS: Three test subjects performed a variety of flight-like resistance and aerobic exercises using the Miniature Exercise Device (MED-2), Concept-2 rowing ergometer, barbell mockup, bench (e.g., for bench press, hip thruster, and cycling), and a custom structure for dips. These were intended also to represent exercises which could be performed on the multi-modality European Enhanced Exploration Exercise Device (E4D) [1]. The marker-based MoCap data, collected through a 16-camera OptiTrack MoCap system, was regarded as the gold standard to compare the data against. Passive markers were affixed to each subject according to a modified full body Plug-in Gait marker set [2] with 46 total markers. The markerless MoCap data was collected using two GoPro Hero7 cameras and one GoPro Hero11 camera. For the IMU data, a full body set of 17 Xsens DOTs were placed on the subject: 10 upper body and 7 lower body IMUs. Biomechanical modeling and evaluation was conducted through OpenSim [3] (MoCap), OpenSense [4] (IMU), OpenCap [5] (markerless), ENABLE [6] (markerless), and other modeling software. Secondary objectives included comparing the volume of equipment, reducing mass and crew set-up time. RESULTS AND DISCUSSION: While there were issues with initial processing for the IMUs and markerless MoCap, the results aided in the understanding of each sensor, developing end-to-end processes, and identifying future needs. Some observed concerns with the markerless MoCap approaches included being cognizant of a cluttered background, number of people in field of view, camera number and placement. Some challenges with the IMUs included possible sliding, early deactivation possibly due to exercise pose, and large quantity sensor synchronization. Overall, the markerless MoCap option may be the preferred method of data collection and processing as it provides a solution for certain IMU shortcomings and may be least in equipment volume, upmass, and crew setup time. CONCLUSIONS: While this work was mainly focused on ISS data collection, these sensor data along with continued evaluation and development efforts will help to establish best methods for exercise data collection on Gateway, for other Artemis missions, and beyond. Details on the latest end-to-end processing of the data and results will be presented, along with lessons learned and recommended sensor selection and methods.

S. Faragalla↗

Kinematic Sensors Evaluation for Spaceflight Exercise Data Collections

INTRODUCTION: On the International Space Station (ISS), exercise feedback from astronauts is very important to diagnose and mitigate any form-related injuries and ensure efficacious exercise prescriptions and systems. Going forward, exploration exercise efforts seek to gain further quantitative data of human and system performance. Currently, methods of collecting in-flight exercise data on the ISS are limited to marker-based motion capture (MoCap) where astronauts must wear reflective markers over their clothes and specialized cameras are used. The main objective of this work was to investigate the following alternative tracking options: markerless video-based MoCap and inertial measurement units (IMUs). These were compared against traditional marker-based MoCap to evaluate kinematic accuracy and inform feasible methods for future exercise data collections on the ISS, especially in support of future Vibration Isolation and Stabilization (VIS) system development. METHODS: Three test subjects performed a variety of flight-like resistance and aerobic exercises using the Miniature Exercise Device (MED-2), Concept-2 rowing ergometer, barbell mockup, bench (e.g., for bench press, hip thruster, and cycling), and a custom structure for dips. These were intended also to represent exercises which could be performed on the multi-modality European Enhanced Exploration Exercise Device (E4D) [1]. The marker-based MoCap data, collected through a 16-camera OptiTrack MoCap system, was regarded as the gold standard to compare the data against. Passive markers were affixed to each subject according to a modified full body Plug-in Gait marker set [2] with 46 total markers. The markerless MoCap data was collected using two GoPro Hero7 cameras and one GoPro Hero11 camera. For the IMU data, a full body set of 17 Xsens DOTs were placed on the subject: 10 upper body and 7 lower body IMUs. Biomechanical modeling and evaluation was conducted through OpenSim [3] (MoCap), OpenSense [4] (IMU), OpenCap [5] (markerless), ENABLE [6] (markerless), and other modeling software. Secondary objectives included comparing the volume of equipment, reducing mass and crew set-up time. RESULTS AND DISCUSSION: While there were issues with initial processing for the IMUs and markerless MoCap, the results aided in the understanding of each sensor, developing end-to-end processes, and identifying future needs. Some observed concerns with the markerless MoCap approaches included being cognizant of a cluttered background, number of people in field of view, camera number and placement. Some challenges with the IMUs included possible sliding, early deactivation possibly due to exercise pose, and large quantity sensor synchronization. Overall, the markerless MoCap option may be the preferred method of data collection and processing as it provides a solution for certain IMU shortcomings and may be least in equipment volume, upmass, and crew setup time. CONCLUSIONS: While this work was mainly focused on ISS data collection, these sensor data along with continued evaluation and development efforts will help to establish best methods for exercise data collection on Gateway, for other Artemis missions, and beyond. Details on the latest end-to-end processing of the data and results will be presented, along with lessons learned and recommended sensor selection and methods.

S Faragalla↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗