Search NASA⌕ Search

SEARCH · Search NASA

Results for “Battery Energy Storage System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Battery Energy Storage System Evaluation Method

This report describes development of an effort to assess Battery Energy Storage System (BESS) performance that the US DOE Federal Energy Management Program (FEMP) and others can employ to evaluate performance of deployed BESS or solar photovoltaic (PV) +BESS systems. The proposed method is based on actual battery charge and discharge metered data to be collected from BESS systems provided by federal agencies participating in the FEMP's performance assessment initiatives. Long-term (e.g., at least one year) time series (e.g., hourly) charge and discharge data are analyzed to provide approximate estimates of key performance indicators (KPIs).

25 ENERGY STORAGE↗

Resilient and Cost-Effective Hybrid Li-Ion Battery Energy Storage System for Sites with Solar Generation and Electric Vehicle (EV) Charging (CRADA Final Report, CRD-19-00799)

The batteries of an energy storage system designed for multiple use-cases are traditionally selected to withstand the highest rate at which a battery is discharged relative to its maximum capacity (C-rate) and cycling requirements of the most intense use-case. However, this is not cost-effective given that the price of the batteries is strongly correlated to C-rate and cyclability. We propose to establish design guidelines for a hybrid energy storage system and test an edge controller that uses high-power and high-energy batteries for high- cyclability use cases such as frequency regulation and electric vehicle (EV) charging and low-cost batteries for low-power and low-cyclability use cases such as summer peak loads. The three main objectives of this proposal are (i) establishing sizing guidelines for such a hybrid storage system, (ii) installing a hybrid storage system in the Energy Systems Integration Facility (ESIF) sized based on those guidelines, and (iii) testing an edge controller specific for the system through hardware tests.

14 SOLAR ENERGY↗

West Africa Battery Energy Storage Systems (BESS) Capacity Building - Discussion of BESS Tariffs: Payment Structures and Case Studies [Slides]

Battery Energy Storage Systems (BESS) are emerging as critical assets for enhancing grid reliability, integrating renewable energy, and enabling system flexibility. Yet, the regulatory and financial frameworks that determine how BESS projects are compensated vary widely across jurisdictions. This presentation explores international case studies - from Honduras, Costa Rica, Chile, South Africa, Mexico, and Brazil - to illustrate how tariff design and payment structures are evolving to support large-scale BESS deployment. The cases highlight a range of ownership and revenue models, including cost-of-service mechanisms, energy and capacity payments, and market-based arbitrage, as well as hybrid approaches under development. The discussion will examine key challenges such as defining remuneration for ancillary services, addressing double charging, and accounting for efficiency losses and degradation over time. By comparing experiences across markets, the presentation identifies emerging best practices for valuing BESS and designing tariffs that align technical performance with economic incentives, providing insights for regulators, utilities, and policymakers pursuing storage integration.

25 ENERGY STORAGE↗

Optimal sizing of battery energy storage systems for peak shaving and demand response using a degradation-aware Bayesian Optimization-Mixed-Integer Linear Programming framework

The increasing integration of renewable energy and rising electricity demand highlight the importance of battery energy storage systems for peak shaving and demand response. Unlike prior approaches that overlook operational impacts on degradation, this study proposes a Bayesian Optimization–Mixed Integer Linear Programming framework for optimal battery energy storage system sizing. In this framework, Mixed Integer Linear Programming determines short-term scheduling while a calibrated electrochemical model iteratively evaluates degradation. The central hypothesis is that the framework can efficiently identify optimal sizes that yield realistic and economically robust outcomes. The method is tested across three scenarios: peak shaving, peak shaving with energy-reduction demand response, and peak shaving with power-reduction demand response. Results show that the framework converge to the optimum within 20 iterations out of 150 possible sizes. Under baseline conditions, the framework consistently selects the smallest feasible system, minimizing unnecessary degradation costs from oversized storage. Sensitivity analyses reveal that larger systems are favored as demand rates or incentives increase. Comparisons of demand response programs indicate that power-reduction demand response offers greater economic benefits than energy-reduction demand response, although demand savings from peak shaving remain the dominant contributor to overall performance. This study demonstrates that the proposed framework balances computational tractability with degradation fidelity, identifies critical economic thresholds for investment, and offers a practical, flexible tool to guide industrial stakeholders in cost-effective battery energy storage system deployment.

Batteries↗

Hierarchical Control of Distributed Battery Energy Storage Systems in a DC Microgrid

Contents - NASA Future Power Systems - DC Microgrid with Distributed Battery Energy Storage - A simplified gateway power system - Droop Control (Primary Control) - Distributed battery units, droop control, and load sharing characteristics - Simulation results - Three-Level Hierarchical Control of Distributed Battery Units During Eclipse - Secondary Control - Objective and definition of unit control error - Implementation of secondary control - Simulation results - Tertiary Control - Schedule BU current sharing with the objective of equal SoC - Simulation results•Conclusions

Jing Zhang↗

Rapid Detection of Anomalies in Battery Energy Storage System Data

Data analytics is pivotal in assessing the technical characteristics and performance of Battery Energy Storage Systems (BESS), underpinning BESS modeling, optimization, and control. However, raw datasets frequently harbor anomalies from measurement errors and equipment malfunctions, impacting BESS reliability and analysis accuracy To address the challenge, this paper presents a novel methodology for the rapid detection of anomalous charge or discharge cycles within BESS operational data, expediting the cleaning process while ensuring data integrity. We’ve collected diverse and comprehensive real-world BESS operational datasets in collaboration with the Electric Power Research Institute and multiple Washington State utilities. These datasets serve dual roles: enabling comprehensive data exploration and analysis for understanding underlying challenges and method development, while also acting as a vital validation resource, demonstrating practical effectiveness. The proposed method detects anomalies and aids in their resolution, improving system performance characterization precision. It also reveals recurring data anomaly sources, offering insights for data collection and handling enhancement. Practitioners can gain valuable insights from the identified anomalous cycles in the real-world datasets along with the investigative process for root cause analyses and essential data cleaning steps.

Crawford, Aladsair J.↗

Africa Battery Energy Storage Systems (BESS) Capacity Building Utility-Scale Storage: BESS Valuation, Tariffs, and Remuneration [Slides]

Utility-scale Battery Energy Storage Systems (BESS) are key to enhancing grid reliability, integrating renewable energy, and providing operational flexibility. Designing effective valuation, remuneration, and tariff frameworks is essential to ensure both system benefits and financial viability for developers. This presentation outlines a structured methodology for evaluating BESS projects, covering policy and legal considerations, cost and revenue analysis, benchmarking, financial sensitivity, and risk assessment, while ensuring alignment with public interest. It also explores valuation of multiple storage services - bulk energy, ancillary services, and infrastructure support - and monetization strategies through capacity payments, energy tariffs, tolling, arbitrage, and non-wires alternative payments. Technical factors, including round-trip efficiency, degradation, and storage duration, are integrated into financial and operational modeling to quantify both system-wide and project-level benefits. Through case studies and simulation-based approaches, this framework provides regulators, utilities, and developers with practical guidance for tariff design, payment structures, and investment decisions, maximizing the economic and societal value of BESS deployment.

25 ENERGY STORAGE↗

Distributed Optimal Power Management for Battery Energy Storage Systems: A Novel Accelerated Tracking ADMM Approach

Optimal power management (OPM) is critical for large-scale battery energy storage systems. Today’s methods often require formidable computational effort due to the design based on centralized numerical optimization. Thus, this paper investigates computationally distributed OPM where the agents based on the cells communicate over a network to cooperatively solve the OPM problem. We propose an accelerated tracking alternating direction method of multipliers (ADMM) algorithm to solve the distributed OPM. The proposed algorithm embeds dynamic average consensus and Nesterov’s acceleration technique in the ADMM algorithm. Not only is the proposed algorithm fully distributed without a need for fusion or aggregating nodes, but it also accelerates convergence. The paper formulates the OPM in a model predictive control framework where it seeks to regulate the charging/discharging power of each battery cell to minimize the total power losses and promote balanced use of the constituent cells while complying with the safety constraints. The paper provides ample simulation results to demonstrate the effectiveness and advantages of the proposed distributed OPM in terms of computation and convergence.

Farakhor, Amir↗

Analysis of degradation in residential battery energy storage systems for rate-based use-cases

This article examines the impact of residential battery energy storage (BES) systems' operational modes on the life (i.e. usable energy capacity) of the battery under several climatic conditions and battery chemistries. The sharp increase in residential BES installations has been a result of decreasing costs of batteries, increase in rate structures motivated applications such as solar self-consumption and time-of-use energy management, and customers purchasing these systems for backup power. While these different modes of operations provide a combination of increased bill savings, reliability of supply, and energy sustainability to the customer, their operational characteristics vary significantly between use-cases. Functional life of BES systems is known to be strongly dependent on their operating conditions. In this article, we analyze the operation of residential BES systems under different rate-based use-cases, for different battery chemistries and cell designs, and under different environmental conditions. This is conducted by simulating the control of BES operations using rate-based cycling algorithms and analyzing the prognosis of multiple battery lifetime models that consider complex nonlinear dependencies of operational stress factors such as state-of-charge, depth-of-discharge, and temperature on degradation. Significant variations in battery life are observed owing to the differences in characteristics of the uses-cases coupled with environmental conditions and battery chemistries. Such differences lead to the conclusion that choice of residential BES technologies and chemistries should account for their intended use-cases.

25 ENERGY STORAGE↗

Snohomish Public Utility District MESA 2: An Assessment of Flow Battery Energy Storage System Technical Performance

This report investigates the technical performance of the 2.2 MW, 8 MWh MESA 2 advanced vanadium flow battery energy storage system (FBESS), consisting of four 0.55 MW, 2 MWh strings, based on a number of baseline and use case tests. The FBESS is located at the Everett, Washington substation and owned by SnoPUD. The FBESS was procured by SnoPUD with matching funds by the Washington Clean Energy. Baseline tests were intended to assess the general technical capability of the FBESS (e.g., stored energy capacity, ramp rate performance, ability to track varying charge/discharge commands, direct current (DC) battery internal resistance). Use case tests were used to examine the performance of the FBESS while engaged in specific grid services (e.g., arbitrage, power factor correction). The project measured and/or calculated parameters that are important for understanding FBESS performance when subjected to actual field operation for achieving economic benefits, e.g., round trip efficiency (RTE) with and without rest, with and without auxiliary loads, auxiliary power consumption, signal command tracking, temperature trends during operation, parasitic power loss unaccounted by auxiliary load during rest, and state of charge (SOC) excursions. These baseline and use case parameters were analyzed using recorded test results. In addition, the results and lessons presented herein are also beneficial for any task or effort that needs technical assessment on similar and different types of FBESS based on technical specifications and/or field deployment results, since the assessment methodology remains the same.

25 ENERGY STORAGE↗

Battery Energy Storage System (BESS) Licensing and Permitting [Slides]

This presentation provides an overview of the licensing, permitting, and regulatory frameworks governing Battery Energy Storage Systems (BESS) across multiple international contexts. It outlines foundational permitting considerations - including safety standards, siting requirements, regulatory and environmental obligations, and interconnection processes - alongside typical pathways for installation, approval, and inspection. The presentation summarizes key technical standards such as NFPA 855 and IEEE guidelines, and emphasizes best practices for safe and effective deployment. A series of detailed case studies from South Africa, Chile, Mexico, Brazil, Costa Rica, Honduras, and the Dominican Republic illustrates how different countries structure approval authority, evaluate environmental impacts, and integrate BESS into national grid systems. The deck concludes with insights on emerging challenges, including evolving regulatory frameworks, financial viability, and the need for pricing mechanisms that accurately value storage services.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hierarchical Control of Distributed Battery Energy Storage System in a DC Microgrid

This paper presents a novel hierarchical control approach of a DC microgrid (DCMG) which is supplied by a distributed battery energy storage system (BESS). With this approach, all battery units distributed in the BESS can be controlled to discharge with accurate current sharing and state-of-charge (SoC) balancing. Similar to other hierarchical control approaches used in DCMGs, this approach consists of three levels: (1) primary control, (2) secondary control and (3) tertiary control. This work includes defining a unit control error (UCE) at the secondary control level and evaluating current sharing weights at tertiary control level. A centralized controller at secondary control level is designed to detect the UCEs of each battery unit, and to restore the average voltage of a DCMG and control battery current sharing simultaneously. The distributed battery units share the load current in a DCMG based on weights. These weights are evaluated at the tertiary control level based on battery SoCs. The approach’s effectiveness was confirmed in digital simulation tests with the same simulation model as used in the NASA AMPS Modular Hardware Emulator.

Jing Zhang↗

Evaluating Impacts of Battery Energy Storage System Functionalities on Distribution Systems Using Power Hardware in-the-Loop Simulation: Preprint

In this paper, we present results from a power hardware-in-the-loop (PHIL) simulation that was performed to test and demonstrate the impact of a battery energy storage system (BESS) on a distribution feeder. The PHIL platform includes a simulated distribution grid in a real-time digital simulator (RTDS), AC and DC power amplifiers, and a battery inverter as the device under test. Guidelines of specific procedures to set up a PHIL platform are provided on how to set up a PHIL platform to evaluate the impact of grid integrated systems. Accelerated time-series PHIL simulations of peak shaving and Volt/Var functionalities were performed using a 540 kVA BESS. These experimental results illustrate how PHIL simulations can be used to evaluate the impact of BESS functionalities on the distribution grid prior to installation in the field.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling & Analysis of a Small Hydropower Plant and Battery Energy Storage System Connected as a Microgrid

Puget Sound Energy (PSE) is a utility with headquarters in Bellevue, WA that provides electric and gas service to customers in many regions of western Washington State. PSE is undertaking the implementation of a battery energy storage system pilot project in Glacier, WA, a small town located in the North Cascade Mountains near Mt. Baker Ski Area. Glacier experiences power outages that are both somewhat frequent and lengthy (roughly 2.8 outages per year with a duration of 7.5 hours average). The primary cause of the outages is faults on a long 55 kV transmission line that serves the town of Glacier from the Kendall substation. This approximately 10-mile long line is shown in the upper left of Figure 1 below. The Kendall-Glacier transmission line extends through an area of heavy forest with few reasonable options for increasing the line’s reliability. The substation in Glacier (also shown on figure below) serves over 1000 customers that are mostly residential but includes over 50 small businesses. The town has approximately 250 year-round residents, and a peak in visitors during the winter ski season when storms are also more likely to cause power outages. Figure 1: Proposed Microgrid in Glacier, WA Given the reliability challenges in Glacier, PSE is assessing the feasibility of a 2MW/4.4MWh battery energy storage system (BESS) that would allow for improved reliability. The BESS would also allow for the ability to investigate other applications for utility-scale energy 5 storage. This energy storage system is being considered for operation in “planned islanding” and “microgrid” mode. “Planned islanding” indicates use of the BESS to provide power to part or potentially all of the load in the town of Glacier during an outage. “Microgrid” indicates utilization (during an outage) of the BESS in parallel with Nooksack Falls Hydroelectric Power Plant, a small (nameplate 1.5 MW/2000 HP) hydro power plant less than 10 miles from the town of Glacier. Nooksack is a run-of river small hydro generation plant with a gross head of 226 ft. The site has a 5-foot diameter penstock which enters the powerhouse and goes into a pelton turbine with six runners on one shaft. It was originally constructed by Stone & Webster in 1906, which makes it the second oldest operating power generation facility in Western Washington. It was placed on the National Register of Historic places in December of 1988. The plant operated until 1997 when a fire destroyed the generator. The project continued operations in 2003 after the replacement of the generator and other updates.

13 HYDRO ENERGY↗