At least 37 records · Page 2

Demonstration of Power System Black Start with Hydropower Generator and Battery Energy Storage: Preprint

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a blackstart- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFMcontrolled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Formulations and Valid Inequalities for Optimal Black Start Allocation in Power Systems

The restoration of a power system after a blackout starts around units with enhanced technical capabilities, referred to as black start units (BSUs). We examine the planning problem of optimally allocating these units on the grid subject to a budget constraint. We present a mixed integer programming model based on current literature in power systems. Binary variables are associated with the allocation of BSUs and with the energization state of buses, branches, and generators of the power system over a time horizon. We extract a substructure of the feasible region which imposes the requirement that each island that appears during the restoration process must have at least one operational generator. We discuss three equivalent reformulations for this requirement. We introduce a family of exponentially many, polynomially separable, valid inequalities to strengthen the formulation. Under simplifying assumptions, we show that the convex hull of the feasible region is a full-dimensional polyhedron, and prove that some of the constraints we introduced are facet-defining. We perform experiments to examine the difference in strength between the formulations as well as the computational times to solve the problem to near optimality for synthetic instances of the IEEE-39, IEEE-118, Illinois-200, WECC-225, IEEE-300, South Carolina-500, and Texas-2000 power systems. We illustrate a use case of the model. We conclude by suggesting extensions of the current work for future research.

Black Start Allocation↗

Optimal Control for Fast Frequency Response and Black-Start using Embedded Storages with Grid-Forming Control

The grid-forming inverter is regarded as the solution for integrating high levels of renewable resources into future power systems. Ensuring the stable operation of grids necessitates that grid-forming inverters offer fast frequency response. This report introduces an optimal control method that coordinates the embedded storage within the grid-forming control model with conventional synchronous generators. The optimized active power reference for the embedded storage is generated using receding horizon optimization control, aiming to keep the center of inertia frequency within acceptable limits. The effectiveness of the proposed control is verified through testing in the IEEE 39-bus system. In addition, with grid-forming capability, we will also investigate the application of using mobile embedded storages as black-start units to provide cranking power to energize non-blackstart generators in a black-start process.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Recovery Coordinated with (Non-)Black-Start Generators

Power restoration is an urgent task after a black-out, and recovery efficiency is critical when quantifying system resilience. Multiple elements should be considered to restore the power system quickly and safely. This paper proposes a recovery model to solve a direct-current optimal power flow (DCOPF) based on mixed-integer linear programming (MILP). Since most of the generators cannot start independently, the interaction between black-start (BS) and non-black-start (NBS) generators must be modeled appropriately. The energization status of the NBS is coordinated with the recovery status of transmission lines, and both of them are modeled as binary variables. Also, only after an NBS unit receives the cranking power through connected transmission lines, will it be allowed to participate in the following system dispatch. The amount of cranking power is estimated as a fixed proportion to the maximum generation capacity. The proposed model is validated on several test systems, as well as a 1393-bus representation system of the Puerto Rican electric power grid. Test results demonstrate how the recovery of NBS units and damaged transmission lines can be optimized, resulting in an efficient and well-coordinated recovery procedure.

Zhao, Meng↗

Enhancing Grid Resilience with HIVE: Decentralized V2G Coordination for Black Starts

This paper proposes the HIVE (Harmonized Integration of Vehicle Energy for Grid Support) model, a novel game-theoretic framework for decentralized coordination of electrified vehicles to enable black start and load restoration during grid outages. In the absence of a central controller, HIVE employs a cooperative game to model vehicle interactions, allowing autonomous decision-making while admitting to a Nash equilibrium for grid restoration. The framework addresses the heterogeneity of vehicles and their operational constraints, selecting a lead vehicle for grid-forming and coordinating grid-following vehicles to support prioritized loads. Applied to a hospital blackout scenario, HIVE demonstrates robust performance in forming an islanded microgrid and sustaining critical loads under varying vehicle availability, state of charge, and power constraints. Simulation results highlight the model’s effectiveness in ensuring decentralized coordination of energy allocation and prioritizing loads, offering a scalable solution for resilient grid operations.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

A VSC-HVDC-Assisted Black-Start Strategy in Bulk Power Systems a Case Study in San Diego

With the worldwide growth in deploying high-voltage direct current (HVDC) transmission systems, their ability to facilitate black-start (BS) restoration has been a research topic of interest. In this context, voltage source converter (VSC)-HVDC is regarded as a BS resource, and this paper proposes a VSC-HVDC-assisted parallel BS restoration strategy in bulk power systems. The proposed strategy consists of two stages: 1) determination of the VSC and generator startup sequence and 2) load restoration simulation. In the first stage, the entire blackout system is sectionalized into multiple subsystems. Each subsystem includes a VSC-HVDC station or traditional BS unit, it independently determines its generator startup timeline and the energization timelines for buses and lines. The second stage involves load restoration, conceptualized as a modified unit commitment problem, with the timelines established in the first stage work as critical inputs. The proposed BS restoration strategy is tested on the San Diego power system to simulate the 2011 Southwest blackout. The simulation results validate the effectiveness of using VSC-HVDC links as a BS resource which not only speeds up the restoration process but also reduces both energy and economic losses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Idaho Falls Power Black Start Field Demonstration (Preliminary Outcomes Paper)

This April 2021 field demonstration builds upon a 2017 field demonstration in which it was determined IFP’s HPPs, on their own, can support islanded black start and operation up to 2.5 MW loading. Modeling and hardware-in-the-loop testing was used in the intervening period to design an energy storage solution, specifically using ultracapacitors, to reduce likelihood of generators tripping during the field demonstration. Overall, the 2021 field demonstration tested three different options for meeting IFP’s requirements: innovating the hydropower controls, synchronizing multiple HPPs on the system, and integrating an ultracapacitor energy storage system. This report documents the testing performed. Follow-on analysis will provide additional insights, for example, including a complete table of comparative results between the tests and scenarios. The analysis will also propose a refined design for an energy storage system to meet IFP’s grid islanded needs.

13 HYDRO ENERGY↗

PHIL Validation of Ultracapacitor Storage for Black Start Application

A deck of slides that present the modeling, and calibration to conduct PHIL test of ultracapacitor energy storage system. The PHIL test has been done while preparing for the black start field demonstration with Idaho Falls Power. Presentation is invited to the 6th International Workshop on Grid Simulator Testing of Wind Turbine Power Trains and Other Renewable Technologies.

13 HYDRO ENERGY↗

Investigating Oscillations in Bulb Turbine Plant During Islanded black start Operation

This paper investigates the frequency oscillatory behavior displayed by the bulb turbine-based run-of-river (ROR) hydropower system under islanded operation. These oscillations prevent higher loading of these generators (under islanded conditions) and hence reduce the black start capability of these generators. To investigate the problem, first, a transfer function model of the bulb-turbine system, sensitive to the effects of head variation, blade angle, and other non-linearities pertaining to turbine characteristics is derived. Next, by analyzing this transfer function model and through simulations, it is determined that system inertia along with other parameters could be responsible for these oscillations. Also, through simulations it is shown that the same ROR system’s behavior is different under islanded mode compared to grid-connected mode.

13 HYDRO ENERGY↗

Optimal Electric Grid Black Start Restoration Subject to Intentional Threats

Efficient restoration of the electric grid from significant disruptions – both natural and manmade – that lead to the grid entering a failed state is essential to maintaining resilience under a wide range of threats. Restoration follows a set of black start plans, allowing operators to select among these plans to meet the constraints imposed on the system by the disruption. Restoration objectives aim to restore power to a maximum number of customers in the shortest time. Current state-of-the-art for restoration modeling breaks the problem into multiple parts, assuming a known network state and full observability and control by grid operators. These assumptions are not guaranteed under some threats. This paper focuses on a novel integration of modeling and analysis capabilities to aid operators during restoration activities. A power flow-informed restoration framework, comprised of a restoration mixed-integer program informed by power flow models to identify restoration alternatives, interacts with a dynamic representation of the grid through a cognitive model of operator decision-making, to identify and prove an optimal restoration path. Application of this integrated approach is illustrated on exemplar systems. Validation of the restoration is performed for one of these exemplars using commercial solvers, and comparison is made between the steps and time involved in the commercial solver, and that required by the restoration optimization in and of itself, and by the operator model in acting on the restoration optimization output. Publications and proposals developed under this work, along with a path forward for additional expansion of the work, and summary of what was achieved, are also documented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Machine Learning–Adjusted WRF Forecasts to Support Wind Energy Needs in Black Start Operations

Abstract The push for increased capacity of renewable sources of electricity has led to the growth of wind-power generation, with a need for accurate forecasts of winds at hub height. Forecasts for these levels were uncommon until recently, and that, combined with the nocturnal collapse of the well-mixed boundary layer and daytime growth of the boundary layer through the levels important for energy generation, has contributed to errors in numerical modeling of wind generation resources. The present study explores several machine learning algorithms to both forecast and correct standard WRF Model forecasts of winds and temperature at hub height within wind turbine plants over several different time periods that are critical for the anticipation of potential blackouts and aiding in black start operations on the power grid. It was found that mean square error for day-2 wind forecasts from the WRF Model can be improved by over 90% with the use of a multioutput neural network, and that 60-min forecasts of WRF error, which can then be used to adjust forecasts, can be made with an LSTM with great accuracy. Nowcasting of temperature and wind speed over a 10-min period using an LSTM produced very low error and especially skillful forecasts of maximum and minimum values over the turbine plant area.

17 WIND ENERGY↗

Black start demonstrations of small hydropower plants with energy storage

The U.S. has at least 500 municipal, electric co-operative, and publicly owned utilities with hydropower plants. These are mostly grid-connected to support the national grid. However, due to small size (at most 10 MW) and low ramping capacity, many of these hydropower plants lack the capability to form local grids to provide backup power to critical loads (during grid outage) and rural areas. Energy storage, such as Li-Ion batteries or ultracapacitors, can be used to enable these capabilities. Because this technology is relatively new, proof-of-concept demonstrations are needed to de-risk the approach before it can be deployed at scale. Two field demonstrations have been performed to validate this approach, namely, a 375 kVA / 1.24 kWh ultracapacitor with Idaho Falls Power’s 3.6 MW Old Lower (OL), 8.9 MW Lower Bulb (LB), and 8.9 MW City Bulb (CB) hydropower plants; and a 250 kVA / 320 kWh Li-Ion battery with Fall River Electric Cooperative’s 5.5 MW Felt hydropower plant. The Idaho Falls Power demonstration showed the resilience benefits of hybridization, and the Fall River Electric demonstration showed what the minimal requirements are to retrofit a hydropower plant for black start. These demonstrations are funded by the U.S. Department of Energy Water Power Technologies Office HydroWIRES Initiative.

13 HYDRO ENERGY↗