Search NASA⌕ Search

SEARCH · Search NASA

Results for “Building information modeling (BIM)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

22 records · Page 2

Robotics for HVAC applications: A critical review and future perspectives

Recent advances in artificial intelligence (AI), enhanced computational capabilities, and innovations in sensors and hardware have driven the increasing development and application of robots in heating, ventilation, and air conditioning (HVAC) systems. We selected and reviewed 101 studies published between 2005 and 2025, sourced from IEEE Xplore, Scopus, Web of Science, and the ACM Digital Library. To analyze these works, we developed a five-dimensional analytical framework (morphology, sensing, navigation, task execution, and system integration), inspired by the Springer Handbook of Robotics and tailored specifically for robotic applications in HVAC. Based on the reviewed studies, six distinct tasks spanning the entire HVAC lifecycle have been identified. Among the six tasks, inspection and maintenance dominate (59 %), followed by indoor monitoring and auditing (21 %), whereas leakage detection, comfort support, and installation/retrofit remain less explored. To address the identified gaps, this review proposes future research directions including investigating robot-aware HVAC design principles, developing multimodal HVAC sensing and data fusion techniques, enhancing robot training and hardware capabilities, and expanding robotic applications beyond Maintenance and Operations (M&O). The findings from this review inform future robotics research for HVAC applications and ultimately enhance system affordability, energy efficiency, resilience or reliability, and occupant environmental comfort. Moreover, it seeks to inspire researchers to explore the intersections of robotics, computer science, building science, and HVAC engineering fostering advancements in this multidisciplinary field.

AI↗

Building Operation Model (Morpheus) for Dallas Fort Worth Airport (CRADA CRD-19-16301 Final Report)

The primary objective of this project was to leverage digital twin technology to enhance the design and operation of DFW Airport terminals and their associated energy systems. To achieve this, Morpheus, a building digital twin, was developed to guide improvements in airport operations, specifically targeting reductions in peak power demand and overall energy consumption.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Multidisciplinary concurrent optimization framework for multi-phase building design process

Modern day building design projects require multidisciplinary expertise from architects and engineers across various phases of the design (conceptual, preliminary, and detailed) and construction processes. The Architecture Engineering and Construction (AEC) community has recently shifted gears toward leveraging design optimization techniques to make well-informed decisions in the design of buildings. However, most of the building design optimization efforts are either multidisciplinary optimization confined to just a specific design phase (conceptual/preliminary/detailed) or single disciplinary optimization (structural/thermal/daylighting/energy) spanning across multiple phases. Complexity in changing the optimization setup as the design progresses through subsequent phases, interoperability issues between modeling and physics-based analysis tools used at later stages, and the lack of an appropriate level of design detail to get meaningful results from these sophisticated analysis tools are few challenges that limit multi-phase multidisciplinary design optimization (MDO) in the AEC field. Here this paper proposes a computational building design platform leveraging concurrent engineering techniques such as interactive problem structuring, simulation-based optimization using meta models for energy and daylighting (machine learning based) and tradespace visualization. The proposed multi-phase concurrent MDO framework is demonstrated by using it to design and optimize a sample office building for energy and daylighting objectives across multiple phases. Furthermore, limitations of the proposed framework and future avenues of research are listed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗