Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Uncertainty Quantification for Capacity Expansion Planning

This report quantifies the uncertainty in output decisions from a Capacity Expansion Planning (CEP) model. The need to understand how uncertainties within CEP models and modeling assumptions affect Quantities of Interest (QoIs) such as expansion and operating costs, as well as expansion decisions remains an ongoing challenge in scientific research and industrial operations. This area of research is particularly important for models which seek to capture how large networks will evolve and operate under increased sources of variable generation, i.e., higher penetration of renewable technologies such as solar and wind generators. Uncertainty quantification (UQ) of CEP models which estimate expansion costs and decisions, and production cost models which estimate operating costs and dispatch decisions, is a key focus of research at NREL. The Regional Energy Deployment System (ReEDS) represents a state-of-the-art CEP model and considers a range of possible grid evolutions in an attempt to identify key drivers, ramifications, and decisions which contribute to better informed investment and policy decisions. However, research to quantify how uncertainties and model assumptions, such as unit commitment (UC), within ReEDS may be affecting its outputs remains challenging due to to size and complexity of the model

24 POWER TRANSMISSION AND DISTRIBUTION↗

Representative Period Selection for Robust Capacity Expansion Planning in Low-carbon Grids

With the increasing urgency to decarbonize power systems, while mitigating extreme events, capacity expansion models can play a vital role in reliably planning the expansion of power systems and facilitating the integration of renewable energy sources. Optimizing capacity expansion generally involves selecting surrogate representative days from forecasts of load and the generation profiles of variable renewable energy resources. To properly select those representative days, we propose a novel input-based approach in combination with the k-means clustering algorithm that utilize three unique operational inputs: load shedding, renewable curtailment, and transmission congestion. The proposed method allows for more robust and cost-effective capacity planning. The method is validated using a capacity expansion model and a production cost model based on California Independent System Operator (CAISO)'s decarbonization goals, and results in reduced costs and drastically lower load shedding.

Anderson, Osten P.↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems

This paper proposes a new optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. The model optimizes both investment decisions (e.g., size, location, and time to install, retire and decommission facilities) and operation decisions (e.g., on/off status, operating capacity, and expected power output). It is also able to optimize reserve systems (or backup systems), as well as the main systems, to improve power systems reliability. An impact of operational strategies of generators (i.e., participating in electricity production vs. remaining as idle units during operation) on power systems reliability is considered. Probability of equipment failures and capacity failure states are used to rigorously estimate the power systems reliability depending on design and operation strategies. The optimization model is formulated with Generalized Disjunctive Programming (GDP), which is reformulated as a mixed-integer linear programming (MILP) model using the Hull relaxation. Two reliability-related penalties, such as downtime penalty and unmet demand penalty, are included in the objective function to maximize reliability while minimizing the total net present cost. Furthermore, a bilevel decomposition with tailored cuts is developed to reduce computational times of the multi-scale optimization model. The effectiveness of the proposed model is shown by comparing the results with the results obtained from the expansion planning models that do not explicitly consider reliability. In conclusion, we also show that the proposed bilevel decomposition is computationally efficient for solving large scale problems through 5-years and 10-years planning case studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Capacity Expansion Planning for LA Basin: the Role of Energy Storage

The paper evaluates the deployment of energy storage to support equitable energy outcomes and the clean energy transition in the Los Angeles Basin (LAB). The deployment of energy storage is considered in a 10 zone capacity expansion planning model from 2022-2045. The model is based on the California Public Utility Commission’s 7 zone RESOLVE model but has been modified to give greater spatial granularity in the LAB area by addig 3 new zones representing the Eastern Los Angeles, Western Los Angeles and the El Nido subzones. Three different scenarios are studied in this work; a base case with no natural gas retirements in the LAB, and two cases exploring extreme natural gas retirements, where the 8GW of natural gas belonging to the LAB are retired by 2045. Study results indicate that storage can play a significant role in helping the LAB meeting its energy requirements. However, when considering extreme retirement scenarios, either new generation (such as solar) or capacity (such as new import capacity via transmission lines) will likely be needed to serve projected system loads.

Maloney, Patrick R.↗

Powered By CADET

The Capacity Expansion Decision Support for Distribution Networks (CADET) is a Python-based library and framework for creating electrical distribution system capacity planning tools for cost-effective, reliable power delivery. It enables the creation of modular, scalable, and extensible distribution capacity planning tools by providing a high-level optimization interface, parameter and options data managers, optimization constraint and objective libraries, generalized nomenclature, a system for tracking and modifying distribution network changes, optimization solution validation, and other capabilities. This webinar will describe 1) the motivation for creating CADET, 2) key designs, and 3) several use cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

STREAM: A technology planning and capacity expansion model for the industrial sector

The Strategic Technology Roadmapping and Energy, Environmental, and Economic Analysis Model—STREAM—is an optimization-based modeling tool and analysis framework to assist with strategic planning and technology investments of the industrial sector. This open-source framework is written in Julia using the JuMP package, which enables users to model future “pathways” for incumbent and future production technologies, costs, fuels and energy carriers, and energy and non-energy environmental impacts from industries as they transform in pursuit of a robust and competitive manufacturing sector. The model starts with an initial stock of industrial production technologies and assets at a facility level and then determines pathways that minimize cost, subject to an array of possible constraints on demand, market shares, environmental flows, and other exogenously specified operational considerations such as capacity utilization rates or regional energy costs. Key features of the framework include flexibility to model a wide range of industries and industrial technologies/processes at varying levels of granularity, ability to perform parametric sensitivity analyses, and ability to visualize model results using visualization objects.

capacity expansion↗

Stochastic Generation Capacity Expansion Planning with Approximate Dynamic Programming

Failing to consider the many long-term uncertainties that affect the performance of a power generation portfolio can result in suboptimal generation expansion plans. Further, traditional deterministic approaches can omit flexible plans that are able to adapt to future events. In this paper, we explore the use of approximate dynamic programming (ADP) to create forward-looking generation expansion plans. A case study is included with three sequential decision periods; three generation technologies; and four uncertainties: demand growth, natural gas prices, renewable portfolio standards, and the adoption of customer-driven solar generation. The flexible plans found through ADP show a 3 % reduction in total expected cost when compared to myopic planning heuristics while circumventing the computational burdens that accompany high-dimensional dynamic programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗