Integrated Demand Management: The FCA Balancing Algorithm

The Collaborative Trajectory Options Program (CTOP) is a new NextGen function that resides within the FAA’s Traffic Flow Management System (TFMS) software. CTOP was designed to be used in the United States’ national airspace to control the distribution of air traffic demand, both temporally and geographically, through a set of Flow Constrained Areas (FCAs). Each FCA is assigned capacity values that represent an estimated upper limit of manageable demand, and CTOP controls to that capacity by using Expect Departure Clearance Time (EDCT) air traffic control clearances, and/or rerouting flights to an alternate FCA or out of the CTOP completely. CTOP’s decisions about which control options best meet system and user needs are based on the Trajectory Options Set (TOS) submitted by airline operators for each flight. The FCA Balancing Algorithm (FBA) described in this document is a proposed decision support capability that generates CTOP capacity entries for FCAs controlling traffic to a common downstream constraint. The FBA provides an equitable distribution of impact, and addresses the added complexity of assigning FCA capacity values for this specific type of use case, greatly simplifying the FAA air traffic manager’s task.

IDM↗

Integrated Demand Management: Concepts and Procedures

This report provides a comprehensive description of the Integrated Demand Management concept. Motivation: NASA’s Integrated Demand Management (IDM) research explores the idea that, under certain conditions, time-based flow management (TBFM) arrival operations can benefit from the coordinated use of a strategic traffic management initiative (TMI) to “precondition” the inbound demand. The research was motivated by the observation that TBFM was usually turned off during convective weather, even in facilities where it was routinely used. Our hypothesis was that strategic adjustments to the inbound traffic so that it provided a better match to the off-nominal changes in capacity observed during these conditions could enable TBFM scheduling to continue to provide effective support for arrival traffic management. Concept: IDM proposes that a TMI (e.g., a Collaborative Trajectory Options Program, or CTOP) be used to adjust the rate and/or geographic distribution across flows of the traffic inbound to a high-demand, TBFM-managed airport before that traffic reaches the TBFM planning horizon. After this strategic preconditioning, TBFM can then tactically fine-tune the demand to deliver a well-managed, orderly feed to the destination airport. Coordinated use of these two flow management capabilities is intended to improve system performance in terms of: • Equity of ground delay assignment, avoiding excessive ground delay for TBFM-scheduled departures, without penalizing longer flights; • Throughput, by distributing traffic to maximize use of available capacity; • Predictability for operators, providing advance notice about the impact on individual flights; • Increased flexibility, supporting operator mitigation strategies such as slot swapping or trajectory options; • Efficiency of flight operations, using ground delay more effectively and reducing airborne delay. The operational description in this document highlights how the IDM concept builds upon already existing tools and procedures, and also indicates where tool enhancements could facilitate conduct of IDM operations. However, enhanced tools are not a requirement for concept introduction. In fact, initial deployment that focused on training procedures and rationale for coordinated use of TFMS and TBFM, without changes to existing tools, might be a simpler way to introduce and to familiarize traffic managers with the idea of preconditioning. The concept and procedures described in this document can hopefully provide useful guidance for introduction of IDM into field operations..

IDM↗

Integrated Demand Management: CTOP User Interface Enhancements

NASA's Integrated Demand Management research activity developed a concept for a novel use of the FAA's Collaborative Trajectory Options Program (CTOP) decision support software to support a particular type of traffic management use case. The research team used an emulation of CTOP software to prototype and test the concept, and developed several enhancements to the CTOP user interface that were well received by the stakeholder community. This document provides a detailed description of these enhancements and their operation that could be used to support their incorporation into the official CTOP software.

IDM↗

Integrated Demand Management (IDM): Concept of Operations

NASA's Integrated Demand Management research activity developed a concept for a novel use of the FAA's Collaborative Trajectory Options Program (CTOP) decision support software to support airspace capacity-limited arrival operations involving Time Based Flow Management (TBFM). This document provides a detailed, graphical description of the concept.

IDM↗

Integrated Demand Management Findings from March 2018 Simulation: Demonstrating Benefits of Submitting Multiple Trajectory Options

This presentation provides a summary of August 2017 Newark airport simulation, with focus on impact of varying Trajectory Options Set (TOS) "participation levels" (i.e., the percentage of flights that submit TOSs), as well as the results from March 2018 LaGuardia simulation with Flow Evaluation Team, which focused on benefits to individual carriers of participation. During the study, we demonstrated that both the participating and non-participating airlines benefited when TOSs but that the participating airlines benefited most and the improvement seen by participants was greatest when overall participation was lower.

New York↗

Integrated Demand Management (IDM) Project Overview

Overview of NASA Integrated Demand Management (IDM) research into synchronized use of strategic and tactical air traffic management systems describes the initial motivation for the research, summary description of key experiments conducted between 2016 and the present, collaboration with outside partners and stakeholders, and the current status of the research.

Integrated Demand Management↗

Overview of Key Saturn Probe Mission Trades

Ongoing studies, performed at NASA/JPL over the past two years in support of NASA's SSE Roadmap activities, proved the feasibility of a NF class Saturn probe mission. I. This proposed mission could also provide a good opportunity for international collaboration with the proposed Cosmic Vision KRONOS mission: a) With ESA contributed probes (descent modules) on a NASA lead mission; b) Early 2017 launch could be a good programmatic option for ESA-CV/NASA-NF. II. A number of mission architectures could be suitable for this mission: a) Probe Relay based architecture with short flight time (approx. 6.3-7 years); b) DTE probe telecom based architecture with long flight time (-11 years), and low probe data rate, but with the probes decoupled from the carrier, allowing for polar trajectories I orbiter. This option may need technology development for telecom; c) Orbiter would likely impact mission cost over flyby, but would provide significantly higher science return. The Saturn probes mission is expected to be identified in NASA's New Frontiers AO. Thus, further studies are recommended to refine the most suitable architecture. International collaboration is started through the KRONOS proposal work; further collaborated studies will follow once KRONOS is selected in October under ESA's Cosmic Vision Program.

probes↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗

A Collaborative Analysis Tool for Thermal Protection Systems for Single Stage to Orbit Launch Vehicles

Presented is a design tool and process that connects several disciplines which are needed in the complex and integrated design of high performance reusable single stage to orbit (SSTO) vehicles. Every system is linked to every other system and in the case of SSTO vehicles with air breathing propulsion, which is currently being studied by the National Aeronautics and Space Administration (NASA); the thermal protection system (TPS) is linked directly to almost every major system. The propulsion system pushes the vehicle to velocities on the order of 15 times the speed of sound in the atmosphere before pulling up to go to orbit which results high temperatures on the external surfaces of the vehicle. Thermal protection systems to maintain the structural integrity of the vehicle must be able to mitigate the heat transfer to the structure and be lightweight. Herein lies the interdependency, in that as the vehicle's speed increases, the TPS requirements are increased. And as TPS masses increase the effect on the propulsion system and all other systems is compounded. To adequately determine insulation masses for a vehicle such as the one described above, the aeroheating loads must be calculated and the TPS thicknesses must be calculated for the entire vehicle. To accomplish this an ascent or reentry trajectory is obtained using the computer code Program to Optimize Simulated Trajectories (POST). The trajectory is then used to calculate the convective heat rates on several locations on the vehicles using the Miniature Version of the JA70 Aerodynamic Heating Computer Program (MINIVER). Once the heat rates are defined for each body point on the vehicle, then insulation thicknesses that are required to maintain the vehicle within structural limits are calculated using Systems Improved Numerical Differencing Analyzer (SINDA) models. If the TPS masses are too heavy for the performance of the vehicle the process may be repeated altering the trajectory or some other input to reduce the TPS mass. The problem described is an example of the need for collaborative design and analysis. Analysis tools are being developed to facilitate these collaborative efforts. RECIPE is a cross-platform application capable of hosting a number of engineers and designers across the Internet for distributed and collaborative engineering environments. Such integrated system design environments allow for collaborative team design analysis for performing individual or reduced team studies. The analysis tools mentioned earlier are commonly run on different platforms and are usually run by different people. To facilitate the larger number of potential runs that may need to be made, RECIPE connects the computer codes that calculate the trajectory data, heat rate data, and TPS masses so that the output from each tool is easily transferred to the model input files that need it. This methodology is being applied to solve launch vehicle thermal design problems to shorten the design cycle, and enable the project team to evaluate design options. Results will be presented indicating the effectiveness of this as a collaborative design tool.

Alexander, Reginald A.↗