Can a radiological event impact a criticality safety program: Lessons learned at WIPP - 14350
Any accident at a nuclear facility impacts all departments involved in the operation of the facility. The radiological release that occurred on February 14, 2014 has halted all waste disposal operations at the Waste Isolation Pilot Plant (WIPP) and has resulted in detailed reviews of all safety management programs. This paper describes the initial reactions to the event, criticality issues with recovery operations, corrective actions for the criticality safety program from independent reviews, and the importance of configuration management to criticality safety. The nature, location, and timing of the event resulted in significant delays in determining the cause of the event. During this time multiple theories on the initiator of the event were postulated including and inadvertent criticality event. However, the timing of the event, average fissile gram equivalent (FGE) loading of waste containers compared to analyzed FGE loads, and isotopic analysis of fixed air samples taken during the event proved it was not an inadvertent criticality event. Recovery activities such as replacing contaminated high efficiency particulate (HEPA), filters and disposing of site generated waste have also been reviewed to prevent criticality safety issues. Post event corrective actions in all departments have impacted how future operations at WIPP will be conducted, including corrective actions for the criticality safety program. The event has also proven the importance of configuration management and the effect a change can have on a process. (authors)