Search NASA⌕ Search

SEARCH · Search NASA

Results for “Congress:”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

A Detailed Vehicle Simulation Process to Support CAFE and CO 2 Standards (MY 2021–2026 Final Rule Analysis)

In 1975, Congress passed the Energy Policy and Conservation Act (EPCA), requiring standards for corporate average fuel economy (CAFE), and charging the U.S. Department of Transportation (DOT) with the establishment and enforcement of these standards. The Secretary of Transportation has delegated these responsibilities to the National Highway Traffic Safety Administration (NHTSA). NHTSA has contracted the DOT Volpe National Transportation Systems Center (Volpe Center) to provide analytical support for NHTSA’s regulatory and analytical activities related to fuel economy standards. Unlike long-standing safety and criteria pollutant emissions standards, fuel economy standards apply to manufacturers’ overall fleets rather than to individual vehicle models. In developing the standards, NHTSA made use of the CAFE Compliance and Effects Modeling System (the “CAFE model”), which was developed by DOT’s Volpe Center for the 2005-2007 CAFE rulemaking and has been continually updated since. The model is the primary tool used by the agency to evaluate potential CAFE stringency levels by applying technologies incrementally to each manufacturer’s fleet until the requirements under consideration are met. The CAFE model relies on numerous technology-related and economic inputs such as market forecasts and technology cost and effectiveness estimates; these inputs are categorized by vehicle classification, technology synergies, phase-in rates, cost learning curve adjustments, and technology “decision trees.” The Volpe Center assists NHTSA in the development of the engineering and economic inputs to the CAFE model by analyzing the application of potential technologies to the current automotive industry vehicle fleet to determine the feasibility of future CAFE standards, the associated costs, and the benefits of the standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2020 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns. The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report includes an update to the baseline drawdowns for each cavern, and provides an initial assessment of the evolution of drawdown expenditure for several caverns

02 PETROLEUM↗

Space Strategy at a Crossroads: Opportunities and Challenges for 21st Century Competition

In its November 2018 report to Congress, the bipartisan National Defense Strategy Commission applauded the main themes of the Trump administration’s 2017 National Defense Strategy. But it was also deeply critical of the strategic thought so far done by the U.S. defense community about the requirements, operational and otherwise, of securing U.S. and allied interests in the types of conflicts we now face. Indeed, it assessed these shortfalls as crippling to the exercise of American power and as dangerous in crisis and war. Is the U.S. military space community exempt from such criticism? Should it be?

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2021 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPRs ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar - to - diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the caverns drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns .

02 PETROLEUM↗

A Detailed Vehicle Simulation Process to Support CAFE Standards for the MY 2024–2026 Analysis

In 1975, Congress passed the Energy Policy and Conservation Act (EPCA), requiring standards for corporate average fuel economy (CAFE), and charging the U.S. Department of Transportation (DOT) with the establishment and enforcement of these standards. The Secretary of Transportation has delegated these responsibilities to the National Highway Traffic Safety Administration (NHTSA).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Radiological Handling and Containment Considerations in Support of an American Medical Isotope Producer

This work will discuss evaluation and design of new and modified facility level radiological containment, transfer, and handling systems in support of the United States’ American Medical Isotope Production Act. In the United States alone, Molybdenum-99 (Mo-99) is used as a precursor to locally generate its decay product, technetium-99m (Tc-99m), for use in approximately 40,000 medical procedures every day to detect cancer and heart disease. Currently, however, Mo-99 is primarily produced overseas and typically requires highly enriched uranium (HEU) which is classified as weapon -usable. This poses a serious security risk to the United States and, in 2012, Congress passed the American Medical Isotope ACT which aimed to cease all Mo-99 production that requires HEU and support American based companies who have found safer production methods. Through this effort, a system was designed and developed to access irradiated material in processing hot cells for ease of material introduction and removal in the confined area. The proposed solution uses a double-door design that allows for easy access to material while also providing shielding through a mechanically manipulated carousel. A system was also designed to transport irradiated materials from target reactors to a target receipt box using a rail guide system, pneumatic motor, and lead screw drive.

07 ISOTOPE AND RADIATION SOURCES↗

Gamma Spectroscopy Detector Candidates and Radioisotope Identification Algorithms for Use in National Security Applications

In 2006, the United States Congress mandated for the Department of Homeland Security (DHS) to screen all cargo containers to protect against terrorist acts and ensure the safety and security of the nation. Containers are screened by gamma and neutron detectors to ensure threat material is not smuggled into the country. However, because commerce is radioactive, detecting the presence of radioactive materials is not sufficient in ensuring the safety and security of the nation. Radioactive materials must also be identified in real time, thus distinguishing threat sources (Uranium-235 and Plutonium-230) from non-threat sources (kitty litter, pot ash, medical isotopes). Screening cargo containers can be considered a two-step process (1) alerting to the presence of radioactive material when gamma counts exceed a threshold setting, and (2) once alerted, identifying the type of radioactive material, which is done by collecting a gamma spectra and analyzing it with an analysis tool/algorithm. For this reason, it is important to evaluate not only emerging technology in neutron and gamma detection, but also investigate new advances in algorithm development for radioisotope identification (RIID). New candidates in detection and on-board algorithm analysis might offer opportunities to make the scanning, detection, and identification process more efficient while still ensuring the health and safety of the public. This research will investigate emerging technology in radiation detection focused on gamma spectroscopy capabilities and RIID algorithms for DHS applications.

61 RADIATION PROTECTION AND DOSIMETRY↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2022 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of a vailable drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the s tructural integrity with more detail using geomechanical models. Finite - element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns.

02 PETROLEUM↗

The Third Assessment of the Effects of Climate Change on Federal Hydropower

Understanding the future changes in projected water supplies is a vital objective for federal hydropower facilities tasked with providing low-cost, reliable electricity across a large regional footprint that encompasses a growing customer base, alternative market structures for marketing the electricity, and a more diverse generation asset mix than was historically present when a majority of federal hydropower facilities were built. This study, The Third Assessment of the Effects of Climate Change on Federal Hydropower, directed by Section 9505 of the SECURE Water Act of 2009 (SWA), is the third quinquennial report on evaluating the effects of climate change on hydroelectric energy generated from 132 US federal hydropower plants marketed by four US Department of Energy (DOE) Power Marketing Administrations (PMAs). The technical assessment is conducted by DOE’s Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Texas A&M University under the guidance of DOE’s Water Power Technologies Office. This study is the result of extensive consultation with the four federal PMAs (Bonneville Power Administration [BPA], Western Area Power Administration [WAPA], Southwestern Power Administration [SWPA], and Southeastern Power Administration [SEPA]), as well as other agencies, including federal hydropower owners/operators (the US Army Corps of Engineers, US Bureau of Reclamation [Reclamation]), US Geological Survey, and National Oceanic and Atmospheric Administration). The main findings of this assessment, along with the PMA administrators’ recommendations, will be included in a subsequent DOE report to Congress. The assessment method and the technical findings are described in this report.

13 HYDRO ENERGY↗

A Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation

Energy storage technologies—including pumped storage hydropower (PSH), batteries, and other technologies—have been technically proven to be capable of providing transmission services by regulating power flows and providing voltage support. These technologies will potentially increase the flexibility of transmission infrastructure and may defer (or eliminate) the need for transmission upgrades or new investments. On the regulatory side, Congress and the Federal Energy Regulatory Commission (FERC) have issued several orders over decades that have established energy storage’s (ES) eligibility as a transmission asset. The orders have required transmission planning entities to provide a level playing field where ES can participate in the transmission planning process (TPP) without undue discrimination and preference of technology. These developments pave the way for ES to participate in transmission planning as a transmission asset. On the other hand, as a flexible resource, ES can play an important role in the electricity market to enable more renewable energy integration by providing energy and grid reliability services. This could bring more revenue in return.

25 ENERGY STORAGE↗

Shifting from Fossil Fuel Reliance to Green Energy Sovereignty: Ute Mountain Ute Tribe

Self-determination has been an on-going effort for Native American people and gained much traction with the passing of The Energy Policy Act of 2005, which included the Indian Tribal Energy Development and Self-Determination Act. Congress passed this act to assist Native American tribes and Alaska Native villages with planning, development, and assistance to achieve their energy goals. The Ute Mountain Ute Tribe (UMUT) has relied on oil and natural gas for economic support the last 70 years. Burning fossil fuels, along with oil and gas development, decreases the quality of air and leads to increased greenhouse gas emissions. Subsequently, the burning of fossil fuels to produce energy is now more costly than many renewable energy sources, including solar photovoltaic (PV) systems. Environmental stewardship, along with the need to maintain revenue generation, has led UMUT’s efforts to achieve energy self-determinism employing PV and exploring other technology. In the past, the tribe completed a 1 megawatt PV project near Towaoc, Colorado, which serves as a case study on the tribe’s energy goals: a future where renewables will dominate their energy landscape. This paper explores UMUT’s past and on-going efforts toward energy independence and how it relates to the broader landscape of Native American energy sovereignty.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Oak Ridge National Laboratory FY 2023 Site Sustainability Plan With FY 2022 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Division (SPD) issues guidance documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPD is part of the DOE Office of Asset Management. As required by DOE Order 436.1, Departmental Sustainability, “each site will develop and commit to an annual Site Sustainability Plan (SSP) that identifies its respective contribution toward meeting the DOE’s sustainability goals.” SPD collects and compiles information reported by each site to develop an agency-wide Sustainability Report and Implementation Plan, which is used to report DOE sustainability progress to the federal government as required by all major federal agencies. DOE launched a formal Sustainability Office and annual SSP process in 2011. Each year, Oak Ridge National Laboratory (ORNL), in concert with the Office of Science (SC), provides the resources essential to fulfill its commitment to deliver a complete and accurate SSP report and quality performance data for entry into the DOE Sustainability Dashboard as managed by SPD. The performance data entered by each DOE site are then combined to disclose the progress of each DOE Program Office and are further combined to show comprehensive progress for the agency. The Office of Asset Management provides assistance to program offices in sustaining their missions, freeing up resources by reducing waste, avoiding excess expenditure on utilities, maximizing productivity, and improving the efficiency of facilities and processes. By focusing on mission needs, programs and associated DOE sites can help the agency meet its sustainability goals, as outlined in federal statutory and regulatory requirements. In FY 2022, the SSP guidance was updated to capture requirements from Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad, the Energy Act of 2020 (EAct 20), actions outlined in DOE’s Climate Adaptation & Resilience Plan and Sustainability Plan, and EO 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. Updates in SSP guidance help to minimize and streamline reporting while simultaneously addressing updated federal requirements. Per DOE, each SSP report should provide an overview of the site’s planned actions, as well as an overview of efforts and accomplishments during the reporting period. SPD collects and compiles information reported by each site to develop DOE’s Annual Sustainability Report, Climate Adaptation & Resilience Plan, and Annual Energy Management Report to Congress. The agency goal has been to lower the reporting burden for sites and increase and improve the consistency of information available to decision makers, allowing them to better identify projects and potential for increased efficiency, as well as to reduce waste, lower emissions, and enhance operational resilience. Sites may elect to produce a more polished publication for their leadership and stakeholders, but this step is no longer required. The ORNL SSP narrative report (this document) and the reporting of DOE SPD Sustainability Dashboard performance data is a collaborative effort of approximately 30 subject matter experts (SMEs) from ORNL facility management and research divisions. Annually, these associates come together to provide a report that can be used by DOE to demonstrate continued agency progress in energy efficiency and sustainable federal operations.

99 GENERAL AND MISCELLANEOUS↗

2022 Standard Scenarios Report: A U.S. Electricity Sector Outlook

This report documents the eighth edition of the annual Standard Scenarios. It summarizes 70 forward-looking scenarios of the U.S. electricity sector that have been designed to capture a wide range of possible futures. In August 2022, the United States Congress passed the Inflation Reduction Act (IRA), a law aimed at accelerating U.S. decarbonization, clean energy manufacturing, and deployment of new power and end-use technologies. This year’s scenarios include representations of the main electricity-sector provisions from IRA and the potential impact on electricity demand. The Standard Scenarios are simulated using the Regional Energy Deployment System (ReEDS) model, which projects utility-scale electricity sector evolution for the contiguous United States using a system-wide, least-cost approach subject to policy and operational constraints. A subset of the scenarios are simulated in the PLEXOS production cost model to obtain a broader suite of metrics at the hourly resolution, which are made available through the National Renewable Energy Laboratory’s (NREL’s) annual Cambium data sets. The scenarios can be viewed and downloaded from NREL’s Scenario Viewer. Annual results are available for the full suite of scenarios in the Standard Scenarios projects in the viewer, whereas the Cambium projects contain hourly data for a subset of scenarios. The Standard Scenarios includes a scenario called the Mid-case, which has central or median values for core inputs such as technology costs and fuel prices, moderately paced demand growth averaging 1.3% per year, and electricity sector policies as they existed in September 2022 (including IRA). The remaining 69 scenarios are created by varying inputs such as technology and fuel prices, resource availability, demand growth, whether nascent generation technologies are allowed, and by introducing national decarbonization constraints.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The National Nuclear Security Administration

The mission of NNSA, as designated by Congress, is to maintain a safe, secure, and effective nuclear deterrent; to provide naval nuclear propulsion; and to prevent, counter, and respond to threats of nuclear proliferation and terrorism worldwide.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

2023 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

DOE maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns at the U.S. Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR’s ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. This report covers impacts on drawdown availability due to SPR operations during Calendar Year 2022. A cavern has an available drawdown if, after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a pillar-to-diameter ratio of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for oil sales, purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern’s drawdown capacity may be continued. A methodology for assessing and tracking the available drawdowns for each cavern is reiterated. This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditures. A total of 222 million barrels of oil were released in calendar-year 2022. A nearly-equal amount of raw water was injected, resulting in an estimated 34 million barrels of cavern leaching. Twenty caverns have now expended a full drawdown. Cavern BC 18 has expended all its baseline available drawdowns, and has no drawdowns remaining. Cavern BM 103 has expended one of its two baseline drawdowns, and is now a single-drawdown cavern. All other caverns with an expenditure went from at-least-5 to at-least-4 remaining drawdowns.

02 PETROLEUM↗

Grating-Based Imaging-Scattering with Portable Neutron Generator

Company: Adelphi Technology, Inc. Title: Grating-Based Imaging-Scattering with Portable Neutron Generator PI: Dr. Jay Theodore Cremer, Jr. Topic: 26a Statement of the problem or situation that is being addressed. Successful plant growth depends upon an efficient and robust root system. The plant root is part of a larger system of water and microbial flows in the soil system. While much effort has been exerted to develop an imaging system for water, microbes, and roots, the problem is challenging, and no widely accepted imaging method currently exists. The optical solutions use a highly modified soil system. X-ray imaging methods are insensitive to the soft tissues in the presence of sand. Thermal neutron imaging has been often tested, but found inadequate, due to limited access and low image resolution. This project will develop a new strategy for neutron imaging of plant/soil systems. The project will allow long duration experiments in greenhouse environments and increase the image information content to the micron scale. General statement of how this problem is being addressed. Portable, rugged thermal and fast neutron sources are being developed where portable means a two-soldier team can carry the source and power unit to survey rough terrain for explosives. In the past decade, microfabrication of X-ray and thermal/cold neutron optics has opened a new imaging strategy. The standard transmission image is now supplemented with simultaneous acquisition of a phase contrast image and an image revealing scattering features. In materials science, the interferometric neutron scattering image has been used to detect early crack formation in stressed additive manufacturing test samples. The detection requires sensitivity to scattering features at the 1-micron scale. By addition of our proposed grating-optic to Adelphi Technology’s radiographic/tomographic imaging system, which is based on portable thermal neutron source, the resulting thermal neutron scatter image of the plant/soil system, will reveal details at 1-micron. Commercial Applications and Other Benefits Neutron interferometry imaging has greater penetration through large metal components compared to industrial X-ray imaging. The low-cost, large area optics developed for greenhouse applications, combined with the robust, portable neutron generator, can then be marketed as a system for inspection of additive manufactured components. In the aerospace industry, all freshly printed components are validated with X-ray CT. Scheduled maintenance again requires X-ray CT as the ability to predict aerospace component lifetime does not yet exist. Large aerospace components are only partially observed with X-ray imaging. Key Words Neutron radiography/tomography, grating interferometry, thermal neutron generator imaging, plant root and soil imaging, rhizosphere imaging, deployable neutron imaging systems Summary for Members of Congress A rugged, portable source of thermal neutrons is adapted for neutron interferometry imaging with the addition of low-cost, 3D printed optics. The first application of our proposed deployable, compact thermal neutron generator imaging system, using a grating optic, is plant root/soil science in greenhouse settings and agricultural laboratories.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Assessing the Impact of the Inflation Reduction Act on Nuclear Plant Power Uprate and Hydrogen Cogeneration

On August 16, 2022, Congress passed the Inflation Reduction Act (IRA) to promote investment in new, carbon-free power generation and sustainable operation of existing carbon-free assets. Specifically, the IRA includes both a production tax credit (PTC – Section 45Y of the IRA) and an investment tax credit (ITC – Section 48E) which utilities may leverage to offset the costs of power uprate. Further, the IRA includes a provision (Section 45V) for a PTC associated with carbon-free hydrogen cogeneration. These tax credits, along with recent legislation efforts to decarbonize the country, have re-emphasized the importance of maintaining and optimizing the existing nuclear plant operating fleet. As a result, utilities are reexamining the possibility of uprating their existing nuclear assets to further maximize carbon-free electricity generation.

08 HYDROGEN↗