Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Smart Planning Support for Nuclear Power Plant Work Planners

Operation and Maintenance costs of a nuclear power plant account for 60% of overall plant costs due to the nuclear industry?s risk-adverse culture (World Nuclear Association, 2020). The industry relies on highly conservative estimates to avoid risk and brute force reactions to manage the unexpected and keep a plant running safely. This approach has kept plants operating safer than any other power source available over the last six decades (Ritchie, 2020). However, these conservative methods have cost the nuclear industry in market competitiveness. The solution? Transform the conservative approaches to accurate, efficient, and still safe data-driven approaches that leverage advanced technologies available in the digital age of operation. This project endeavored to identify two key aspects to successfully incorporate historical work execution data. First, where in the work management process is that information most pertinent? Next, what variables are key to informing the best strategy for organizing the upcoming work? The Smart Planner uses data collected by dynamic work instructions to provide a basis for suggesting requirements of similar, upcoming work packages. Further, it curbs inefficiencies of the work management process by analyzing the likelihood of discovery work, offering suggestions to build a contingency package. All this taking place as the work planner builds work packages that meet the predetermined scope of work to be performed.

99 GENERAL AND MISCELLANEOUS↗

Impact of Storage Conditions on the Quality and Viability of Switchgrass as a Bioenergy Crop

With growing energy demands and climate concerns, advancements in bioenergy have become imperative. Biofuels promote energy independence, reduce fossil fuel reliance, and cut greenhouse gas emissions. Switchgrass (Panicum virgatumis) is an ideal bioenergy crop due to its ability to thrive on marginal lands unsuitable for food crops and its drought tolerance, rendering it a low-maintenance, high-yield option. In the bioenergy industry, energy crops are typically stored to facilitate supply chain management and ensure a continuous supply despite seasonal availability. However, the effective utilization of bioenergy crops is typically contingent upon addressing the challenges associated with biomass storage. These challenges include high moisture content that promotes biological degradation of the biomass leading to increased risk of pathogenic microbes, and chemical degradation that increases the ratio of inconvertible, inorganic materials. These issues lead to a reduction of feedstock value, diminishing the biomass-to-biofuel conversion efficacy, making switchgrass and other bioenergy crops less effective as fuel sources. This project aims to improve the storage of purpose-grown energy crops. Aerobic storage trials were conducted under varying moisture contents to stimulate real-world environmental exposure. Switchgrass samples were rewetted to 30% or 35% and stored in a bioreactor for approximately one month, or until cellular respiration ceased. Degradation indicators, such as dry matter loss, temperature changes, and cellular respiration, were measured throughout this process. Samples for compositional analysis, 16S, and ITS were taken at three different time points: before, during, and after storage, to monitor changes in biomass, microbial communities, and metabolites over time. Preliminary data indicate that dry matter loss is proportional to cellular respiration, with higher moisture content (35%) leading to higher temperatures and elevated dry matter loss. Compositional analysis and microbial community analysis are in progress. This research will provide a comprehensive understanding of storage, helping to identify stability factors in energy crops and improve best management practices for biomass producers.

09 - BIOMASS FUELS↗

Dynamic modeling studies of basin-scale pressure interference and CO 2 plume evolution in multi-well geologic CO 2 storage

This research employs numerical modeling to analyze how CO 2 plumes and pressure fronts evolve when CO 2 is injected into a single storage formation from multiple projects located in proximity. Here, this analysis also evaluates the extent to which injection well spacing alleviates pressure buildup in the absence of active pressure management tactics. The simulation approach was based on a single, homogenous saline aquifer in which CO 2 injection occurs under a one-injector baseline case and several multi-well cases where well spacing varies. Analysis results show that the extent of pressure buildup is in the range of tens or a few hundreds of kilometers and contingent upon the defining pressure buildup demarcating the front edge. For the geological setting evaluated in this paper, our analysis suggests that without active basin pressure management strategies, commercial-scale projects would likely need to be sited far apart to avoid pressure interference from one another. Analysis results show the radius of CO 2 plume varies approximately from 2 to 3 km from injection wells (each injecting 1 Mt/year for 30 years) depending on cases and modeling parameters assumed. Given the pressure interference, this paper thus draws attention to the importance of greater coordination among storage operators and regulatory stakeholders. Because this analysis assumes a very specific geologic setting, this exploratory analysis bears further investigations across other geologic scenarios.

42 ENGINEERING↗

Scalable Unit Commitment with Security Constrained AC Power Flow via ADMM and Hybrid Modeling Strategies

This research introduces a more efficient way to optimize power grid operations, breaking the problem into manageable steps and using advanced mathematical techniques to speed up calculations. By incorporating smart heuristics, improved preprocessing, and contingency analysis, the approach allows operators to make better decisions faster. These innovations enhance our understanding of how to optimize energy generation, making it possible to anticipate failures before they happen, reduce system costs, and improve overall grid performance. Ultimately, this research helps bridge the gap between theoretical models and real-world applications, paving the way for a smarter, more resilient power grid. This research directly benefits the public by making electricity more affordable, reliable, and sustainable. By improving how power grids schedule and distribute electricity, the project helps energy providers reduce operational costs, which can lead to lower electricity prices for consumers. Additionally, the ability to predict and prevent power system failures enhances grid reliability, reducing the likelihood of blackouts that can disrupt homes, businesses, and critical infrastructure such as hospitals. From an environmental perspective, optimizing power generation reduces energy waste and lowers carbon emissions, contributing to cleaner air and a more sustainable energy system. Furthermore, with extreme weather events becoming more frequent, these advancements make the power grid more resilient, ensuring communities are better prepared for emergencies and natural disasters. By strengthening the nation's energy infrastructure, this research plays a crucial role in improving economic stability, public safety, and environmental sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Toward Drilling the Perfect Geothermal Well: An International Research Coordination Network for Geothermal Drilling Optimization Supported by Deep Machine Learning and Cloud Based Data Aggregation

The EDGE project, supported by the U.S. Department of Energy Geothermal Technologies Office under award DE-EE0008793, established a data-driven framework for improving the efficiency, cost-effectiveness, and reliability of geothermal well drilling. The project focused on developing scalable data infrastructure, advanced machine learning and probabilistic models, and integrated analytics tools to support continuous drilling optimization. A central objective was to reduce geothermal drilling costs by up to seventy percent while minimizing the risk of well failure through predictive diagnostics and adaptive planning. Over the project period, a comprehensive data repository was designed and deployed, incorporating records from over one hundred geothermal wells across varied geological settings. This repository supported both structured and unstructured data and adhered to FAIR data principles, enabling provenance tracking, quality control, and standardized metadata. The project introduced automated ingestion pipelines and a cloud-hosted platform that facilitated access to raw, processed, and derived datasets. This infrastructure served as the foundation for model development and analysis. Machine learning workflows were developed to predict key drilling metrics including rate of penetration, non-productive time, and total drilling costs. Self-organizing maps and dimensionality reduction methods were used to uncover operational patterns and outliers, while supervised learning algorithms such as random forests and deep neural networks were applied to forecast performance outcomes. The models were validated on heterogeneous datasets from both U.S. and Icelandic fields, demonstrating variable but significant predictive accuracy. The results indicated that finer temporal resolution, inclusion of lithological data, and consistency in operational annotations could substantially improve model performance. The project also implemented process mining techniques to reconstruct state-transition models from drilling event logs. These models enabled the identification of deviations from optimal workflows and provided insights into recurring failure modes. Analysis of non-productive time highlighted the impact of equipment failures, geological challenges, and human factors, offering opportunities for targeted mitigation strategies. The EDGE Dashboard was developed as a web-based expert system integrating data visualization, model outputs, and user-driven queries. It provided an accessible interface for operators to explore historical data, evaluate predicted outcomes, and compare drilling scenarios. Initial feedback from project partners suggested that the dashboard could serve as a foundation for more advanced advisory and optimization tools. Overall, the EDGE project demonstrated the feasibility and value of applying modern data science techniques to geothermal drilling. It delivered a set of interoperable tools and models that can support more efficient, lower-risk well development. The findings point toward a viable path for transitioning from advisory analytics to semi-autonomous drilling systems, contingent on continued collaboration, expanded datasets, and field validation. The project results have immediate relevance for drilling operations, data management practices, and future geothermal R&D efforts aimed at achieving reliable, cost-competitive geothermal energy at scale.

15 GEOTHERMAL ENERGY↗

Generative AI for Grid Operations [Slides]

In the last few years, the development and use of generative artificial intelligence (AI) and large-language models (LLMs) have changed the landscape of how AI and machine learning (ML) are being used in power systems. LLMs are built on foundational models based on large data sets that can be trained to provide information rapidly and through simple natural language prompts. Generative AI can then perform human-like tasks using ML models to identify and mimic pattens in the data sets. This presentation explores how generative AI can enhance grid operations by improving forecasts, enabling rapid contingency analyses, and offering real-time operational suggestions. By providing grid operators with valuable insights, generative AI will empower them to manage power systems more effectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Scalable Transmission and Distribution Co-simulation Platform for IBR-heavy Power Systems

The integration of Inverter-Based Resources (IBRs) into power systems, including both transmission and distribution networks, poses challenges for studying grid dynamic behaviours under various operating conditions and system events. This paper addresses the urgent need to investigate the influence of IBRs on grid dynamics, and their potential to enhance power system reliability and resilience. We propose a flexible, scalable transmission and distribution co-simulation platform, using opensource tools only for assessing the impact of grid-following (GFL) and grid-forming (GFM) IBRs on dynamic stability at various renewable penetration levels (up to 100%). This platform enables researchers to explore different contingencies at transmission, distribution, or both, providing a comprehensive evaluation of grid status. A series of case studies, including both small and large T&D systems with varying GFL/GFM configurations and contingencies, have been conducted. The results not only robustly validate our co-simulation framework, but also provide invaluable insights for effective IBR management in the power grid.

grid management↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DINGO: Digital assistant to grid operators for resilience management of power distribution system

With increasing adverse weather events and disasters, enabling resiliency of the power distribution system (PDS) is becoming increasingly important. Here in this work, resiliency is defined as the systems ability to keep supplying critical loads even with multiple contingencies. Resiliency may depend on: (a) advanced tools to assist operators in situational awareness and decision making with the increasing volume of data generated by the PDS, (b) visualization and ease of interaction with system resources and information, especially during extreme events and resulting human operator stress, and (c) flexible resources and autonomous control. Operators and support engineers need to interact with the system for key information and take action under stress, given the requirement for decisions in a short time. Integrated technological solutions are prevailing steps to support the most appropriate decision during critical times to serve essential loads. In order to meet the required goals, a Real-time Resiliency Monitoring and Operational Decision Support (RT-RMOD) tool have been developed. It supports various functionalities, including real-time monitoring, resilience assessment, and proactive decision support. However, this work makes advanced feature additions to the tool by developing data-enabled resilience management algorithms for (i) outage detection and localization, (ii) Resiliency-metric driven restoration and reconfiguration, and (iii) NLP based digital assistant for operators called DINGO (DIgital assistaNt to Grid Operators) to interact with Advanced Distribution Management System (ADMS) and RT-RMOD. The developed algorithm was validated for multiple cases of weather events using a real-world, off-grid microgrid system modeled in a real-time simulator, sensor data, and software tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Harnessing distributed GPU computing for generalizable graph convolutional networks in power grid reliability assessments

Although machine learning (ML) has emerged as a powerful tool for rapidly assessing grid contingencies, prior studies have largely considered a static grid topology in their analyses. This limits their application, since they need to be re-trained for every new topology. Here, this paper explores the development of generalizable graph convolutional network (GCN) models by pre-training them across a range of grid topologies and contingency types. We found that a GCN model with auto-regressive moving average (ARMA) layers with a line graph representation of the grid offered the best predictive performance in predicting voltage magnitudes (VM) and voltage angles (VA). We introduced the concept of phantom nodes to consider disparate grid topologies with a varying number of nodes and lines. For pre-training the GCN ARMA model across a variety of topologies, distributed graphics processing unit (GPU) computing afforded us significant training scalability. The predictive performance of this model on grid topologies that were part of the training data is substantially better than the direct current (DC) approximation. Although direct application of the pre-trained model to topologies that are not part of the grid is not particularly satisfactory, fine-tuning with small amounts of data from a specific topology of interest significantly improves predictive performance. In general, this paper highlights the feasibility of training large-scale GNN models to assess the reliability of power grids by considering a wide variety of grid topologies and contingency types. With the advent of foundational models in ML and the exponential increase in GPU computing clusters, generalizable ML models will significantly enhance how utilities manage power systems and make decisions in real-time or near-real-time.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Genome resources for three modern cotton lines guide future breeding efforts

Cotton ( Gossypium hirsutum L.) is the key renewable fibre crop worldwide, yet its yield and fibre quality show high variability due to genotype-specific traits and complex interactions among cultivars, management practices and environmental factors. Modern breeding practices may limit future yield gains due to a narrow founding gene pool. Precision breeding and biotechnological approaches offer potential solutions, contingent on accurate cultivar-specific data. Here we address this need by generating high-quality reference genomes for three modern cotton cultivars (‘UGA230’, ‘UA48’ and ‘CSX8308’) and updating the ‘TM-1’ cotton genetic standard reference. Despite hypothesized genetic uniformity, considerable sequence and structural variation was observed among the four genomes, which overlap with ancient and ongoing genomic introgressions from ‘Pima’ cotton, gene regulatory mechanisms and phenotypic trait divergence. Differentially expressed genes across fibre development correlate with fibre production, potentially contributing to the distinctive fibre quality traits observed in modern cotton cultivars. These genomes and comparative analyses provide a valuable foundation for future genetic endeavours to enhance global cotton yield and sustainability.

59 BASIC BIOLOGICAL SCIENCES↗

Application of quantitative risk assessment to address stakeholder questions in geologic carbon storage

Ambitious international greenhouse gas emissions reduction targets demand a rapid transformation to a low-carbon economy. This transformation includes the accelerated adoption of carbon dioxide (CO2) capture and storage (CCS) technology. However, as with any large-scale engineering enterprise, the widespread commercial-scale deployment of geologic carbon storage (GCS) raises important questions about technology and cost-effectiveness, safety, environmental risk, and long-term liability. Effectively assessing and managing risks and liability associated with GCS projects is a key technical need throughout the project life cycle-from site selection and permitting to monitoring design, operational risk management, and post-operational site closure. This presentation highlights recent advancements in tools for quantitative risk assessment, being developed by the National Risk Assessment Partnership (NRAP). NRAP is a multi-year, multinational laboratory research collaboration sponsored by the U.S. Department of Energy's Office of Fossil Energy and Carbon Management. Our focus will be on these tools' applications in addressing critical stakeholder questions related to supporting permitting to ensure secure and environmentally protective storage; designing effective and efficient monitoring plans; evaluating the effectiveness of remedial actions and risk management alternatives; and informing liability assessment and investment decisions. This paper will detail the key functionality of NRAP’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), a computational framework for assessing leakage risk and containment assurance. This model features streamlined workflows for calculating leakage risk profiles, delineating risk-based area of review, and assessing contingency plans and post-injection site care requirements. ORION is an open-source, observation-based ensemble forecasting toolkit to help operators assess the seismic hazard at a carbon storage site. The State of Stress Analysis Tool (SOSAT), designed to assess subsurface stress conditions and evaluate geomechanical risk resulting from CO2 injection in an area of interest will also be presented. We will also introduce a prototype model to evaluate storage project costs and liability associated with risk management. The Technoeconomic and Liability Evaluation for Storage (TALES) model uses results from forecasts of leakage and induced seismicity risk to estimate the lifecycle cost of managing risk. Finally, a preliminary example of how the NRAP Risk-based Adaptive Monitoring Plan (RAMP) tool can be used to design efficient and effective site monitoring plans and estimate the detectability of fluid leakage will be provided. The relevance of these tools for addressing key stakeholder questions amidst uncertainty will be emphasized.

decision support↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems, e.g., emergency asset management. Included is an example case study: Hurricane Dolly damaging a synthetic 2000-bus test system during its landing in Southern Texas. We perform statistical analysis of damages and discuss topological effects on the example synthetic grid. Also, we include a cursory evaluation of impacts using simplified operational models. Finally, we discuss how our method can be extended to use even higher-fidelity meteorological data sets and suggest directions for future work.

contingencies↗

Fast simultaneous feasibility testing and applications for electrical power grids

Fast simultaneous feasibility testing (SFT) for management of an electrical power grid is achieved through various innovations. The computation problem relates to evaluation of candidate solutions for external power flows into a power grid, with respect to predetermined constraints and contingencies. Storage and computations are reduced by formulating the problem in terms of transactional nodes (e.g. third party connections for generators and loads) instead of the larger number of bus nodes. Further advantages are achieved by precomputing matrices that can be reused across multiple SFT invocations, organizing matrices and operations to reduce storage and computation, and eliminating branches that have no contingency violations. The fast SFT further enables new applications for integrating SFT with a Security-Constrained Unit Commitment (SCUC) optimizer for efficient single pass solutions; operating SFT as a service to multiple SCUC solvers; or integration with Security-Constrained Economic Dispatch (SCED) optimization.

97 MATHEMATICS AND COMPUTING↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources: Preprint

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

contingencies↗

Leveraging public AI tools to explore systems biology resources in mathematical modeling

Predictive mathematical modeling is an essential part of systems biology and is interconnected with information management. Systems biology information is often stored in specialized formats to facilitate data storage and analysis. These formats are not designed for easy human readability and thus require specialized software to visualize and interpret results. Therefore, comprehending modeling and underlying networks and pathways is contingent on mastering systems biology tools, which is particularly challenging for users with no or little background in data science or system biology. To address this challenge, we investigated the usage of public Artificial Intelligence (AI) tools in exploring systems biology resources in mathematical modeling. We tested public AI’s understanding of mathematics in models, related systems biology data, and the complexity of model structures. Our approach can enhance the accessibility of systems biology for non-system biologists and help them understand systems biology without a deep learning curve.

59 BASIC BIOLOGICAL SCIENCES↗

Assessment of the Corrosion Risks to a Double Shell Tank During the Selective Removal of a Cesium-rich Supernate Layer - 20227

The Direct Feed Low Activity Waste (DF-LAW) activity will provide the initial feed to the Waste Treatment and Immobilization Plant at the Hanford Tank Farm facility. Feed preparation for DF-LAW will be carried out in multiple double shell waste tanks (DST) utilizing the Tank Side Cesium Removal (TSCR) process. Tank AP-106 will be an integral part of the TSCR process and hence key to the DFLAW activity. Prior to being utilized for this purpose, the Cs-137 concentration levels in the AP-106 supernate must be reduced significantly. The AP-106 re-purposing process manages normal waste tank addition procedures such that waste acceptance criteria objectives for Cs-137 removal are achieved. As this process was being developed, several concerns regarding tank integrity during and after repurposing of Tank AP-106, and the associated tanks (i.e., AP-102, AN-101, and AP-108), were addressed. The potential corrosion degradation mechanisms identified based on process knowledge included: general and pitting corrosion, caustic stress corrosion cracking, concentration cell corrosion, and microbiologically induced corrosion (MIC). A systematic approach was undertaken to assess the risk of corrosion during the AP-106 re-purposing process. The assessment considered the initial and present condition of the tank, the service history of the tank, the environmental conditions created in each tank during each stage of the process, process timing, and corrosion testing and modeling that approximated tank conditions. Based on this information, recommendations were provided to minimize the exposure of the tank to corrosive conditions. These recommendations included time limits for each stage of the process, staging of corrosion inhibitor solutions should process delays occur, and waste sampling with potential chemistry adjustments at defined steps in the process. Additionally, recommendations for post-process supernate chemistry adjustments and tank inspections were put forth. The greatest risk for this process occurs during the manipulation of large quantities of Columbia River water (i.e., greater than 450,000 gallons) within AP-106, the associated tanks and the supporting infrastructure (i.e., transfer line piping). This risk becomes more pronounced if there is a process upset and the tank walls remain exposed to a corrosive condition longer than intended. As long as the river water is blended into the supernate in a timely fashion, and the waste is adjusted appropriately with corrosion inhibitors, corrosion may be minimized and the final condition of the supernate in AP-106 and the associated tanks is expected to be in compliance with corrosion chemistry requirements. Contingency plans will be made to minimize the impact of a process upset. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗