Permit Injectors and New Observation Wells at Early Test Site (SECARB Phase III (Early) Project at Cranfield)

At Cranfield field well permitting was part of a routine operation that Denbury conducted on behalf of the University of Texas and the SECARB Project. Denbury permits injection and production wills through the Mississippi Oil and Gas Board (MO&GB). The MO&GB permitted the two observation wells as production wells, although they are not in the oil-productive part of the field (being deliberately located down-dip of the oil-water contact). The well permits issues April 15, 2009 for the observation wells are attached in appendix A. Denbury also permitted 8 injection wells to support the High Volume Injection Test (HiVIT); four of these are drilled unusually far downdip to support the sequestration experiment. These permits are held by Denbury as part of their normal operations.

54 ENVIRONMENTAL SCIENCES↗

SECARB Phase III Early (Cranfield) Site Characterization, Modeling and Monitoring Plan

This plans describes how the SECARB (early) team will characterize the surface and subsurface of the Cranfield Phase III site, develop from this data numerical models that will be used to quantify the response of the reservoir to injection and the migration of fluids, and use monitoring to validate the conceptual and quantitative predictions made in the models and to support the project goals.

54 ENVIRONMENTAL SCIENCES↗

Develop Safety Plan for Installation and Operation of the Observation Wells (SECARB Phase III Task 3.1.3a [Early] Project at Cranfield)

Sandia Technologies developed and deployed a worker health and safety plan for the CFU31_F2 and CFU 31F3 observation wells, covering the SECARB activities following drilling the wells to total depth. The purpose of this health and safety plan (HASP) is to assign responsibilities, establish personnel protection standards, specify safe operating procedures, and provide for contingencies that may arise during the Cranfield Phase III Monitor Well installation. This HASP has been developed in accordance with Sandia Technologies, LLC (Sandia) safety and health standard operating procedures. Specific programs and procedures, as required by site activities, are identified herein.

01 COAL, LIGNITE, AND PEAT↗

On Caprock Seal Integrity of Tuscaloosa Mudstone at Cranfield, MS (USA), CO 2 Injection Site

Saline formations deep underground are among the most promising targets for large-scale geologic carbon storage. The caprock seal integrity evaluation is an important component of commercial-scale CO 2 sequestration projects. Measurements of the porosity and permeability of mudstone samples from the NETL-supported Cranfield Project were performed using a helium porosimeter and a core flow apparatus, before and after exposure in a CO 2 -saturated brine environment. The permeability of the core samples rapidly decreased with the increase in confining pressure and did not fully recover after decompression. On the other hand, exposure to CO 2 led to an increase in the permeability by at least an order of magnitude. The porosity changes after the exposure were not substantial. The post-exposure increase in permeability was subsequently offset by its rapid decrease during the higher-pressure confinement. Extrapolation of the observed permeability trends to in situ reservoir conditions suggests that Tuscaloosa mudstone can effectively serve as a natural seal.

58 GEOSCIENCES↗