Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Recommended Crew Systems Capabilities for a Mars Ascent Vehicle as a Function of Flight Duration

In many human Mars exploration architectures, a Mars Ascent Vehicle (MAV) is used at the end of a surface stay to transport crew from the Martian surface to a waiting in-space transportation vehicle. It is possible for this transportation vehicle to be placed in any of several different Mars orbits, the selection of which drives the flight duration of the MAV from launch to docking and the amount of propellant required on the transportation vehicle to reach the same orbit. This paper identifies existing NASA standards and supplies habitability subject matter expert recommendations for the human habitation capabilities of the MAV as a function of flight duration. Living and working functions that may potentially be carried aboard a MAV are assessed. Flight durations considered include up to 8 hours, 8-24 hours, 1-2 days, 2-3 days, 3-4 days, and 4-7 days, which book end flight durations necessary to reach the transportation vehicle at different possible Mars orbits. This analysis will determine if there are key durations that serve as significant break points in required MAV capability.

MAV↗

Life Support and Habitation Systems: Crew Support and Protection for Human Exploration Missions Beyond Low Earth Orbit

The National Aeronautics and Space Administration (NASA) has recently expanded its mission set for possible future human exploration missions. With multiple options there is interest in identifying technology needs across these missions to focus technology investments. In addition to the Moon and other destinations in cis-lunar space, other destinations including Near Earth Objects and Mars have been added for consideration. Recently, technology programs and projects have been re-organizing to better meet the Agency s strategic goals and address needs across these potential future missions. Life Support and Habitation Systems (LSHS) is one of 10 Foundational Domains as part of the National Aeronautics and Space Administration s Exploration Technology Development Program. The chief goal of LSHS is to develop and mature advanced technologies to sustain human life on missions beyond Low Earth Orbit (LEO) to increase reliability, reduce dependency on resupply and increase vehicle self-sufficiency. For long duration exploration missions, further closure of life support systems is of interest. Focus includes key technologies for atmosphere revitalization, water recovery, waste management, thermal control and crew accommodations. Other areas of focus include technologies for radiation protection, environmental monitoring and fire protection. The aim is to recover additional consumable mass, reduce requirements for power, volume, heat rejection, crew involvement, and meet exploration vehicle requirements. This paper provides a brief description of the LSHS Foundational Domain as defined for fiscal year 2011.

Barta, Daniel J.↗

Ares I-X Launch Abort System, Crew Module, and Upper Stage Simulator Vibroacoustic Flight Data Evaluation, Comparison to Predictions, and Recommendations for Adjustments to Prediction Methodology and Assumptions

The National Aeronautics and Space Administration (NASA) Constellation Program (CxP) has identified a series of tests to provide insight into the design and development of the Crew Launch Vehicle (CLV) and Crew Exploration Vehicle (CEV). Ares I-X was selected as the first suborbital development flight test to help meet CxP objectives. The Ares I-X flight test vehicle (FTV) is an early operational model of CLV, with specific emphasis on CLV and ground operation characteristics necessary to meet Ares I-X flight test objectives. The in-flight part of the test includes a trajectory to simulate maximum dynamic pressure during flight and perform a stage separation of the Upper Stage Simulator (USS) from the First Stage (FS). The in-flight test also includes recovery of the FS. The random vibration response from the ARES 1-X flight will be reconstructed for a few specific locations that were instrumented with accelerometers. This recorded data will be helpful in validating and refining vibration prediction tools and methodology. Measured vibroacoustic environments associated with lift off and ascent phases of the Ares I-X mission will be compared with pre-flight vibration predictions. The measured flight data was given as time histories which will be converted into power spectral density plots for comparison with the maximum predicted environments. The maximum predicted environments are documented in the Vibroacoustics and Shock Environment Data Book, AI1-SYS-ACOv4.10 Vibration predictions made using statistical energy analysis (SEA) VAOne computer program will also be incorporated in the comparisons. Ascent and lift off measured acoustics will also be compared to predictions to assess whether any discrepancies between the predicted vibration levels and measured vibration levels are attributable to inaccurate acoustic predictions. These comparisons will also be helpful in assessing whether adjustments to prediction methodologies are needed to improve agreement between the predicted and measured flight data. Future assessment will incorporate hybrid methods in VAOne analysis (i.e., boundary element methods, BEM and finite element methods, FEM). These hybrid methods will enable the ability to import NASTRAN models providing much more detailed modeling of the underlying beams and support structure of the ARES 1-X test vehicle. Measured acoustic data will be incorporated into these analyses to improve correlation for additional post flight analysis.

Smith, Andrew↗

Passive Thrust Oscillation Mitigation for the CEV Crew Pallet System

The Crew Exploration Vehicle (CEV) was intended to be the next-generation human spacecraft for the Constellation Program. The CEV Isolator Strut mechanism was designed to mitigate loads imparted to the CEV crew caused by the Thrust Oscillation (TO) phenomenon of the proposed Ares I Launch Vehicle (LV). The Isolator Strut was also designed to be compatible with Launch Abort (LA) contingencies and landing scenarios. Prototype struts were designed, built, and tested in component, sub-system, and system-level testing. The design of the strut, the results of the tests, and the conclusions and lessons learned from the program will be explored in this paper.

Sammons, Matthew↗

Constellation Program (CxP) Crew Exploration Vehicle (CEV) Project Integrated Landing System

Crew Exploration Vehicle (CEV) Chief Engineer requested a risk comparison of the Integrated Landing System design developed by NASA and the design developed by Contractor- referred to as the LM 604 baseline. Based on the results of this risk comparison, the CEV Chief engineer requested that the NESC evaluate identified risks and develop strategies for their reduction or mitigation. The assessment progressed in two phases. A brief Phase I analysis was performed by the Water versus Land-Landing Team to compare the CEV Integrated Landing System proposed by the Contractor against the NASA TS-LRS001 baseline with respect to risk. A phase II effort examined the areas of critical importance to the overall landing risk, evaluating risk to the crew and to the CEV Crew Module (CM) during a nominal land-landing. The findings of the assessment are contained in this report.

Baker, John D.↗

Failure-Tolerant Avionics for Crewed Space Systems Recommended Best Practices

This paper provides an overview of some of the major steps needed to mature and justify the design of an avionics system for crewed spacecraft. It is organized as a collection of artifacts or pieces of evidence that NASA needs to assess the system at design reviews, including a functional failure modes and effects analysis (FFMEA), fault containment region (FCR) definitions, the failure hypothesis, and reliability analysis. This paper is intended as a reference for designers working on NASA crewed spaceflight projects, reliability engineers responsible for avionics system assessments, and program managers wanting to understand what evidence is required at design reviews to ensure crew safety and mission success.

Avionics↗

NASA Crew Transportation System Certification Plan

NASA Crew Transportation System (CTS) Certification is the authorization granted by the Agency that allows the use of a Commercial Provider’s CTS to transport NASA Crew to and from the ISS. The CTS Certification decision is made by the NASA Associate Administrator based on the comprehensive assessment of the Certification Review Board and recommendations from the CCP and ISS Program Managers and the NASA Associate Administrator of Space Operations Mission Directorate. The Commercial Provider is responsible for developing and executing its plan for certifying the CTS. The Commercial Crew Program (CCP) with the International Space Station (ISS) Program must substantiate the Commercial Provider’s certification assertion of compliance with NASA requirements and NASA Crew safety.

CCP↗

Crew procedures and workload of retrofit concepts for microwave landing system

Crew procedures and workload for Microwave Landing Systems (MLS) that could be retrofitted into existing transport aircraft were evaluated. Two MLS receiver concepts were developed. One is capable of capturing a runway centerline and the other is capable of capturing a segmented approach path. Crew procedures were identified and crew task analyses were performed using each concept. Crew workload comparisons were made between the MLS concepts and an ILS baseline using a task-timeline workload model. Workload indexes were obtained for each scenario. The results showed that workload was comparable to the ILS baseline for the MLS centerline capture concept, but significantly higher for the segmented path capture concept.

Summers, Leland G.↗

NASA Commercial Crew Program Crew Transportation System Certificate of Flight Readiness Plan

NASA Commercial Crew Program (CCP) Crew Transportation System (CTS) Certification of Flight Readiness (CoFR) is the authorization granted by the Agency that certifies the flight readiness of a Commercial Provider’s CTS to conduct a flight test or mission to transport NASA Crew to and from the ISS. The Commercial Provider is responsible for developing and executing its plan for certifying the flight readiness of its CTS. The CCP with the International Space Station (ISS) Program must substantiate the Commercial Provider’s CoFR assertion to ensure compliance with NASA requirements and NASA Crew safety. NASA CCP CTS CoFR is the approval of the Commercial Provider’s evidence that: • The physical as-built CTS was produced, assembled, integrated, and tested within the approved production and operational constraints. • The mission specific requirements are enveloped within the certified CTS capabilities. • The CTS personnel are trained and certified to support the mission. • All aspects of the CTS are ready for the mission.

Certification of Flight Readiness↗

Age Life Evaluation of Space Shuttle Crew Escape System Pyrotechnic Components Loaded with Hexanitrostilbene (HNS)

Determining deterioration characteristics of the Space Shuttle crew escape system pyrotechnic components loaded with hexanitrostilbene would enable us to establish a hardware life-limit for these items, so we could better plan our equipment use and, possibly, extend the useful life of the hardware. We subjected components to accelerated-age environments to determine degradation characteristics and established a hardware life-limit based upon observed and calculated trends. We extracted samples using manufacturing lots currently installed in the Space Shuttle crew escape system and from other NASA programs. Hardware included in the study consisted of various forms and ages of mild detonating fuse, linear shaped charge, and flexible confined detonating cord. The hardware types were segregated into 5 groups. One was subjected to detonation velocity testing for a baseline. Two were first subjected to prolonged 155 F heat exposure, and the other two were first subjected to 255 F, before undergoing detonation velocity testing and/or chromatography analysis. Test results showed no measurable changes in performance to allow a prediction of an end of life given the storage and elevated temperature environments the hardware experiences. Given the lack of a definitive performance trend, coupled with previous tests on post-flight Space Shuttle hardware showing no significant changes in chemical purity or detonation velocity, we recommend a safe increase in the useful life of the hardware to 20 years, from the current maximum limits of 10 and 15 years, depending on the hardware.

Hoffman, William C., III↗

Human Systems Integration Approach in Implementing Voice-Control of Future Spacecraft Systems

Crewed spacecraft and habitats of the future will require more automation and autonomy to support complex missions. However, these complex systems require a more efficient command and control input method. Speech recognition along with visual or auditory feedback is an alternative, providing an extra pair of hands and eyes for the crew. Yet, speech recognition demands a highly integrated development approach to ensure a successful system implementation. To ensure the voice control application is developed correctly will require a Human Systems Integration (HSI) approach. This paper provides an insight into the development of a speech/voice control application of a spacecraft system that encompasses automation and autonomy through an HSI approach. Results of the voice control experiment of the Space Shuttle camera system are provided as lessons learned about voice control on a spacecraft. Limitations and challenges of the technology are addressed as well as how HSI can help develop these types of voice control command and control systems.

Voice control↗

An advanced programmable/reconfigurable color graphics display system for crew station technology research

The hardware configuration, software organization, and applications software for the NASA IKONAS color graphics display system are described. The systems were created at the Langley Research Center Display Device Laboratory to develop, evaluate, and demonstrate advanced generic concepts, technology, and systems integration techniques for electronic crew station systems of future civil aircraft. A minicomputer with 64K core memory acts as a host for a raster scan graphics display generator. The architectures of the hardware system and the graphics display system are provided. The applications software features a FORTRAN-based model of an aircraft, a display system, and the utility program for real-time communications. The model accepts inputs from a two-dimensional joystick and outputs a set of aircraft states. Ongoing and planned work for image segmentation/generation, specialized graphics procedures, and higher level language user interface are discussed.

Montoya, R. J.↗

Demonstration of a Particle Impact Monitoring System for Crewed Space Exploration Modules

When micrometeorite or debris impacts occur on a space habitat, crew members need to be quickly informed of the likely extent of damage, and be directed to the impact location for possible repairs. The goal of the Habitat Particle Impact Monitoring System (HIMS) is to develop a fully automated, end-to-end particle impact detection system for crewed space exploration modules, both in space and on the surfaces of Solar System bodies. The HIMS uses multiple thin film piezo-polymer vibration sensors to detect impacts on a surface, and computer processing of the acoustical signals to characterize the impacts. Development and demonstration of the HIMS is proceeding in concert with NASA's Habitat Demonstration Unit (HDU) Project. The HDU Project is designed to develop and test various technologies, configurations, and operational concepts for exploration habitats. This paper describes the HIMS development, initial testing, and HDU integration efforts. Initial tests of the system on the HDU were conducted at NASA?s 2010 Desert Research and Technologies Studies (Desert-RATS). Four sensor locations were assigned near the corners of a rectangular pattern. To study the influence of wall thickness, three sets of four sensors were installed at different layer depths: on the interior of the PEM wall, on the exterior of the same wall, and on the exterior of a layer of foam insulation applied to the exterior wall. Once the system was activated, particle impacts were periodically applied by firing a pneumatic pellet gun at the exterior wall section. Impact signals from the sensors were recognized by a data acquisition system when they occurred, and recorded on a computer for later analysis. Preliminary analysis of the results found that the HIMS system located the point of impact to within 8 cm, provided a measure of the impact energy / damage produced, and was insensitive to other acoustic events. Based on this success, a fully automated version of this system will be completed and demonstrated as part of a crew "Caution/Warning" system at the 2011 Desert-RATS, along with a crew response procedure.

Opiela, J. N.↗

Crew Transportation System Design Reference Missions

Contains summaries of potential design reference mission goals for systems to transport humans to andfrom low Earth orbit (LEO) for the Commercial Crew Program. The purpose of this document is to describe Design Reference Missions (DRMs) representative of the end-to-end Crew Transportation System (CTS) framework envisioned to successfully execute commercial crew transportation to orbital destinations. The initial CTS architecture will likely be optimized to support NASA crew and NASA-sponsored crew rotation missions to the ISS, but consideration may be given in this design phase to allow for modifications in order to accomplish other commercial missions in the future. With the exception of NASA’s mission to the ISS, the remaining commercial DRMs are notional. Any decision to design or scar the CTS for these additional non-NASA missions is completely up to the Commercial Provider. As NASA’s mission needs evolve over time, this document will be periodically updated to reflect those needs.

potential design reference↗

Space Suits and Crew Survival Systems Branch Education and Public Outreach Support of NASA's Strategic Goals in Fiscal Year 2012

As NASA plans to send people beyond low Earth orbit, it is important to educate and inspire the next generation of astronauts, engineers, scientist, and general public. This is so important to NASA future that it is one of the agencies strategic goals. The Space Suits and Crew Survival Systems Branch at Johnson Space Center (JSC) is actively involved in helping to achieve this goal by sharing our hardware and technical experts with students, educators, and the general public and educating them about the challenges of human space flight, with Education and Public Outreach (EPO). This paper summarizes the Space Suit and Crew Survival Systems Branch EPO efforts throughout fiscal year 2012.

Jennings, Mallory A.↗