A Feasible Approach for an Early Manned Lunar Landing. Part II: Detailed Report of Ad Hoc Task Group
This report, in two parts, presents a program development plan for attempting a first manned lunar landing in 1967. The two parts consist of a Summary Report and a Detailed Report representing the coordinated output of the Ad Hoc Task Group assigned to the study. The study was started in response to the request for such a study by the Associate Administrator in his memorandum of May 2, 1961 establishing the Ad Hoc Task Group. The purpose of the study was to take a first cut at the tasks associated with the design, development and construction of the equipment and facilities as well as the development of the crews, and to show the time phasing 6f these tasks. Included are the space sciences, life science and advanced technology tasks whose data and results are needed for designing and developing the systems required in carrying out the mission. The plan presented in the two reports does not presume to be a firm plan. Its basic purpose is, by choosing one feasible method, to size up the scope, schedule and cost of the job, discover the main problems, pacing items and major decisions and provide a threshold from which a firm and detailed project development plan can be jointly formulated by the various elements of NASA.