Search NASA⌕ Search

SEARCH · Search NASA

Results for “Date allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

An inventory of California's irrigated land

Currently in the fourth year of its applications pilot test project to assess irrigated lands for water management, California officials found that the performance goal of plus or minus 5% at the 95% confidence level by each of the state's 10 major hydrologic basins was bettered in all but a few cases using manual analysis techniques for estimation. The process used was photointerpretation of enlarged LANDSAT scenes (1:150,000 scale), adjusting the determined acreage using a regression estimator and ground truth data from 637 sample cells. Sample cells were allocated to areas stratified on the basis of field size and selected crop types. Interpretation of three dates of imagery was required to span the complete time during which irrigated crops are grown in California. The registration of multitemporal data and classification procedures for estimating irrigated land using digital techniques are being studied as part of the second task in the project.

Sawyer, G. B.↗

International Space Station Operational Experience and Its Impacts on Future Mission Supportability

Operational experience gained on the International Space Station (ISS) has enabled significant improvements in failure rate estimates for various Orbital Replacement Units (ORUs). These improved estimates, in turn, allow more efficient and accurate spare parts allocations for future missions, enabling significant reductions in both logistics mass and risk. This paper examines the value of ISS experience to date in terms of its impact on supportability for future missions. A supportability model is presented that assesses the spares required as a function of mission endurance and risk, taking into account uncertainty in failure rate estimates. Changes in ISS Environmental Control and Life Support (ECLSS) ORU failure rate estimates are described and discussed, both in terms of the overall population of ORUs and the evolution of failure rate estimates over time for a particular item. The value of those updated failure rate estimates is assessed by calculating the estimated spares mass requirements for two cases, using the initial, pre-ISS estimates and using the estimates informed by on-orbit experience. Hidden risk resulting from underestimated failure rates is also assessed. These results indicate that, for a 1,200-day Mars mission, ISS experience has enabled a 3.9 t to 6.0 t reduction in ECLSS spares mass required and uncovered failure rate underestimates that would have resulted in an order of magnitude increase in risk had they not been discovered and corrected. The implications of these results for system development and mission planning are discussed, including approaches to accelerate the rate of failure rate refinement and the risks associated with making changes or introducing new systems. Overall, test time is a critical factor that must be carefully considered in system development, and new systems must budget appropriate time for testing in a relevant environment or accept higher risk and logistics requirements on future missions.

Owens, Andrew C.↗

Optimal Control Allocation for Distributed Electric Propulsion in a Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept jet transport aircraft with a 2040 entry-into-service date. It utilizes electrified aircraft propulsion (EAP) to enable propulsive and aerodynamic benefits to reduce fuel usage, emissions, and cost. The powertrain consists of a single thrust producing, boundary layer-ingesting (BLI) turbofan gas turbine engine (GTE) with generators driving a series/parallel partial hybrid EAP system. The architecture includes 16 underwing contrarotating BLI fans, eight on each side, in a mailslot configuration. The 16 fans run on power extracted from the GTE through four 5 MW motor/generators connected to the Low-Pressure Spool, and a single 1 MW motor/generator on the High-Pressure Spool. The distributed fans can be used by the flight control to augment or replace the rudder function. At top of climb, the power extracted from the GTE for the fans is boosted by batteries. The design provides redundancy, and the capacity for boost means that the fans are designed to be able to provide additional thrust when necessary. These features can be leveraged in case of a fan or generator failure. This paper sets up the optimal control problem of setpoint determination for individual fans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. The power extraction range constraints derive from the gas turbine engine design and the small amount of variation allowed for the engine to maintain operability. The problem formulation allows the number and location of fan failures for which the thrust and torque can be maintained to be investigated, which has implications for certification. Simulations of a coordinated turn utilizing the distributed electric propulsion for yaw rate control under different failure scenarios demonstrate the robustness of the powertrain design to failures and help define its limitations.

Distributed Electric Propulsion↗

Sensitivity of the Asteroid Redirect Robotic Mission (ARRM) to Launch Date and Asteroid Stay Time

National Aeronautics and Space Administrations (NASAs) proposed Asteroid Redirect Mission (ARM) is being designed to robotically capture and then redirect an asteroidal boulder into a stable orbit in the vicinity of the moon, where astronauts would be able to visit and study it. The current reference trajectory for the robotic portion, ARRM, assumes a launch on a Delta-IV H in the end of the calendar year 2021, with a return for astronaut operations in cislunar space in 2026. The current baseline design allocates 245 days of stay time at the asteroid for operations and boulder collection. This paper outlines analysis completed by the ARRM mission design team to understand the sensitivity of the reference trajectory to launch date and asteroid stay time.

asteroid↗

Sensitivity of the Asteroid Redirect Robotic Mission (ARRM) to Launch Date and Asteroid Stay Time

National Aeronautics and Space Administrations (NASAs) proposed Asteroid Redirect Mission (ARM) is being designed to robotically capture and then redirect an asteroidal boulder mass into a stable orbit in the vicinity of the moon, where astronauts would be able to visit and study it. The current reference trajectory for the robotic portion, ARRM, assumes a launch on a Delta IV H in the end of the calendar year 2021, with a return for astronaut operations in cislunar space in 2026. The current baseline design allocates 245 days of stay time at the asteroid for operations and boulder collection. This paper outlines analysis completed by the ARRM mission design team to understand the sensitivity of the reference trajectory to launch date and asteroid stay time.

trajectory analysis↗

Micro-ion Traps for Detection of (Pre)-Biotic Organic Compounds on Comets

Comets are currently believed to be a mixture of interstellar and nebular material. Many of the volatiles in comets are attributed to interstellar chemistry, because the same species of carbonaceous compounds are also observed in ices in interstellar molecular (ISM) clouds. Comets are thus likely to be a relatively pristine reservoir of primitive material and carbonaceous compounds in our solar system. They could be a major contributor to the delivery of prebiotic organic compounds, from which life emerged through impacts on early Earth. Mass spectrometers are very powerful tools to identify unknown chemicals, and much progress bas been made in miniaturizing mas spectrometers for space applications. Most miniatu rized mass spectrometers developed to date, however, are still relatively large, power hungry, complicated to assemble, and would have significant impact on space flight vehicle total payload and resource allocations.

vanAmerom, Friso H. W.↗

Optimal Control Allocation for Distributed Electric Propulsion in A Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept transport aircraft representative of technology anticipated for a 2040 entry-into-service date. The powertrain consists of a single thrust-producing geared turbofan engine with generators driving a series/parallel partial hybrid power/propulsion system. The architecture includes 16 underwing contrarotating fans, eight on each side. The distributed fans can be used by the flight control system to augment or replace the rudder function. This paper sets up the optimal control problem of setpoint determination for individual wingfans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. A simulation of a coordinated turn utilizing the distributed electric propulsion for yaw rate control in a multiple wingfan failure scenario demonstrates the robustness of the powertrain design to failures and helps define its limitations.

Distributed Electric Propulsion↗

Optimal Control Allocation for Distributed Electric Propulsion in A Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept transport aircraft representative of technology anticipated for a 2040 entry-into-service date. The powertrain consists of a single thrust-producing geared turbofan engine with generators driving a series/parallel partial hybrid power/propulsion system. The architecture includes 16 underwing contrarotating fans, eight on each side. The distributed fans can be used by the flight control system to augment or replace the rudder function. This paper sets up the optimal control problem of setpoint determination for individual wingfans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. A simulation of a coordinated turn utilizing the distributed electric propulsion for yaw rate control in a multiple wingfan failure scenario demonstrates the robustness of the powertrain design to failures and helps define its limitations.

Distributed Electric Propulsion↗

Hotter droughts alter resource allocation to chemical defenses in piñon pine

Abstract Heat and drought affect plant chemical defenses and thereby plant susceptibility to pests and pathogens. Monoterpenes are of particular importance for conifers as they play critical roles in defense against bark beetles. To date, work seeking to understand the impacts of heat and drought on monoterpenes has primarily focused on young potted seedlings, leaving it unclear how older age classes that are more vulnerable to bark beetles might respond to stress. Furthermore, we lack a clear picture of what carbon resources might be prioritized to support monoterpene synthesis under drought stress. To address this, we measured needle and woody tissue monoterpene concentrations and physiological variables simultaneously from mature piñon pines ( Pinus edulis ) from a unique temperature and drought manipulation field experiment. While heat had no effect on total monoterpene concentrations, trees under combined heat and drought stress exhibited ~ 85% and 35% increases in needle and woody tissue, respectively, over multiple years. Plant physiological variables like maximum photosynthesis each explained less than 10% of the variation in total monoterpenes for both tissue types while starch and glucose + fructose measured 1-month prior explained ~ 45% and 60% of the variation in woody tissue total monoterpene concentrations. Although total monoterpenes increased under combined stress, some key monoterpenes with known roles in bark beetle ecology decreased. These shifts may make trees more favorable for bark beetle attack rather than well defended, which one might conclude if only considering total monoterpene concentrations. Our results point to cumulative and synergistic effects of heat and drought that may reprioritize carbon allocation of specific non-structural carbohydrates toward defense.

59 BASIC BIOLOGICAL SCIENCES↗

Crew-Centered Operations: What HAL 9000 Should Have Been

To date, manned space flight has maintained the locus of control for the mission on the ground. Mission control performs tasks such as activity planning, system health management, resource allocation, and astronaut health monitoring. Future exploration missions require the locus of control to shift to on-board due light speed constraints and potential loss of communication. The lunar campaign must begin to utilize a shared control approach to validate and understand the limitations of the technology allowing astronauts to oversee and direct aspects of operation that require timely decision making. Crew-centered Operations require a system-level approach that integrates multiple technologies together to allow a crew-prime concept of operations. This paper will provide an overview of the driving mission requirements, highlighting the limitations of existing approaches to mission operations and identifying the critical technologies necessary to enable a crew-centered mode of operations. The paper will focus on the requirements, trade spaces, and concepts for fulfillment of this capability. The paper will provide a broad overview of relevant technologies including: Activity Planning and Scheduling; System Monitoring; Repair and Recovery; Crew Work Practices.

Korsmeyer, David J.↗

40 Years of Collecting Martian Meteorites

This year marks the 40th anniversary of the first Martian meteorite found in Antarctica by ANSMET, ALH 77005. Since then, an additional 14 Martian meteorites have been found by the ANSMET team making for a total of 15 Martian meteorites in the Antarctic collection at Johnson Space Center. Of the 15 meteorites, some have been paired so the 15 meteorites actually represent a total of approximately 9 separate meteorites. The first Martian meteorite found by ANSMET was ALH 77005 (482.500 g), a lherzolitic shergottite. When collected, this meteorite was split as a part of the joint expedition with the National Institute of Polar Research (NIPR) Japan. Originally classified as an "achondrite-unique", it was re-classified as a Martian lherzolitic shergottites in 1982 [1]. This meteorite has been allocated to ~125 scientists for research and there are 181.964 g remaining at Johnson Space Center (JSC). Two years later, one of the most significant Martian meteorites of the collection at JSC was found at Elephant Moraine, EET 79001 (7942.000 g), a shergottite. This meteorite is the largest in the Martian collection at JSC and was the largest stony meteorite sample collected during the 1979 season. In addition to its size, this meteorite is of particular interest because it contains a linear contact separating two different igneous lithologies, basaltic and olivine-phyric. EET 79001 has glass inclusions that contain chemical compositions that are proportionally identical to the Martian atmosphere, as measured by the Viking spacecraft [2]. This discovery helped scientists to identify where the "SNC" meteorite suite had originated, and that we actually possessed Martian samples. This meteorite has been allocated to ~195 scientists for research and there are 5304.770 g of sample is available. Five years later, ANSMET found ALH 84001 (1930.900 g), the only Martian orthopyroxenite. This meteorite was initially classified as a diogenite but was reclassified as being a Martian meteorite in 1993 [3,4]. ALH 84001 is known as the "Life on Mars" meteorite, sparked debate about whether it contained evidence of Martian life [5] and significantly influenced the field of astrobiol-ogy. This sample has been allocated to 173 scientists for research and has 1426.694 g remaining at JSC. In 1988, another lherzolitic shergottite was found, LEW 88516, (13.203 g). This meteorite wasn't recognized in the field as an achondrite until it was broken during processing 2 years later. LEW 88516 has been allocated to 43 scientists for research and 5.351 g of this meteorite remains at JSC. Six years later a basaltic shergottite was found in the Queen Alexandra Range, QUE 94201 (12.020 g). This meteorite was believed to be of terrestrial origin until maskelynite was seen in a thin section. QUE 94201 has been allocated to 57 scientists for research and there are 3.629 g of this meteorite left at JSC. In 2003, the NASA Mars Exploration Program joined the ANSMET team with the hopes of finding another Martian mete-orite. During this expedition, MIL 03346 (715.200 g) was found. This meteorite is a nakhlite. MIL 03346 has been allocated to 98 scientists for research and there are 579.046 g of this sample remaining at JSC. Six years later, 3 more meteorites that have been paired with MIL 03346 were found, MIL 090030 (452.630 g), 090032 (532.190 g ) and 090136 (170.980 g). MIL 090030 has been allocated to 21 scientists for research and has 434.420 g remaining at JSC, MIL 090032 has been allocated to 21 scientists for re-search and has 508.710 g remaining at JSC and MIL 090136 has been allocated to 14 scientists for research and has 156.790 g remaining at JSC. During the 2004 expedition, 2 identical meteorites where found together on the ice, RBT 04261 (78.763 g) and RBT 04262 (204.600 g). These paired meteorites are olivine-phyric shergottites. RBT 04261 has been allocated to 33 scientists for research and has 32.335 g remaining at JSC. RBT 04262 has been allocated to 46 scientists for research and has 171.886 g remaining. In 2006, another olivine-phyric shergottite was found, LAR 06319 (78.572 g). This meteorite has 61.414 g remaining at JSC and has been allocated to 39 scientists for research. During the 2012 season, 3 more olivine-phyric shergottites were found at Larkman Nunatak, LAR 12011 (701.170 g), LAR 12095 (133.132 g) and LAR 12240 (57.596 g). LAR 12011 is paired with LAR 06319 and LAR 12095 and LAR 12240 are paired with each other. LAR 12011 has been allocated to 43 scientists for research and there are 685.778 g of LAR 12011 remaining at JSC. LAR 12095 has been allocated to 18 scientists for research and has 119.744 g remaining at JSC. LAR 12240 has been allocated to 10 scientists for research and has 52.231 g remaining at JSC. Martian meteorites are the only samples available from Mars because no mission has returned samples from there to date. All Martian meteorites are crustal rocks with most of them being crystallized magmas, so they are an important source for under-standing Martian geological history and volcanism. The ANSMET program has greatly contributed to the scientific community by collecting these meteorites

Funk, R. C.↗

Robust Design Under Uncertainty in Quantum Error Mitigation

Error mitigation techniques are crucial to achieving near-term quantum advantage. Classical postprocessing of quantum computation outcomes is a popular approach for error mitigation, which includes methods, such as zero noise extrapolation, virtual distillation, and learning-based error mitigation. However, these techniques have limitations due to the propagation of uncertainty resulting from the finite shot number of a quantum measurement. In this work, we introduce general and unbiased methods for quantifying the uncertainty and error of error-mitigated observables based on the strategic sampling of error mitigation outcomes. We then extend our approach to demonstrate the optimization of performance and robustness of error mitigation under uncertainty. To illustrate our methods, we apply them to zero noise extrapolation and Clifford date regression in the ground state of the XY model simulated using depolarizing and International Business Machines Corporation (IBM) Toronto noise models, respectively. In particular, we optimize the choice of noise levels and the allocation of shots for zero noise extrapolation and the distribution of the training circuits for Clifford data regression. While our methods are readily applicable to any postprocessing-based error mitigation approach, in practice they must not be prohibitively expensive—even though they perform optimizations of the error mitigation hyperparameters requiring sampling of a statistical distribution of error mitigation outcomes. By leveraging surrogate-based optimization, we show that our methods can efficiently perform optimal design for a zero noise extrapolation implementation. We then further demonstrate the transferability of learned zero noise extrapolation hyperparameters to other similar circuits.

97 MATHEMATICS AND COMPUTING↗

Basin-Scale Relicensing Opportunity

This dataset contains 1,261 hydropower facilities with associated Federal Energy Regulatory Commission (FERC) relicensing metrics. Anticipated FERC license renewal dates are summarized by river reach for observing areas of opportunities for basin-wide collaboration on environmental mitigations. Identifying rivers and basins with facilities that have similar anticipated Federal Energy Regulatory Commission (FERC) relicensing dates may be one potential indicator that multiple licensees within the same basin may be willing to collaborate on a basin-scale relicensing effort. The hydropower relicensing process requires long-term resource allocation by agencies, hydropower owner/operators, non-governmental organizations, and tribal, state, and federal governments. Basin-scale hydropower relicensing has begun to receive attention as a potential solution for reducing licensing timelines, costs, and uncertainty which can provide benefits to a broad spectrum of participants in the licensing process. This dataset contains one a data file in comma separated (*.csv) format, a data dictionary in *.csv format, and a user guide in *.pdf format. These data are also available as an interactive web map available at:

13 HYDRO ENERGY↗

Post-Disturbance Dynamic Distribution System Restoration with DGs and Mobile Resources

Distributed generations (DGs) can act as emergency power supplies when distribution systems suffer from outages. However, the generation capabilities of DGs are generally limited by a number of factors including weather conditions, fuel limitations, etc. In this context, mobile resources that are able to reallocate resources to desired locations are regarded as important complements to conventional fixed DGs in assisting distribution system restoration. In this paper, a distribution system restoration model with DGs and mobile resources is proposed. Firstly, the dispatch and allocation of mobile resources are modeled with respect to the characteristics of the traffic network. Then the developed mobile resource models are integrated into the distribution system restoration model to co-optimize the scheduling of DGs and mobile resources. Uncertainty factors are managed by a model predictive control approach so that system operators can dynamically adjust the restoration strategy with the up-to-date information. The effectiveness of the proposed method is validated through an IEEE 13-bus test system.

distributed generations (DGs)↗

On the selection of an optimum design point for phase-coherent receivers employing band-pass limiters.

Discussion of the optimum power allocation problem associated with the design of a phase-coherent receiver employing a bandpass limiter. A single channel system is treated in detail, and an optimization technique is proposed that makes use of up-to-date phase-locked loop and bandpass limiter theories recently contributed by Lindsey (1969) and Springett and Simon (1971). It is shown how this technique can be extended to a two-channel system.

Simon, M. K.↗

iFair: Achieving Fairness in the Allocation of Scarce Resources for Senior Health Care

Efficient resource allocation is crucial in many domains, particularly in senior care, where assigning resources to older adults must consider uncertainties associated with vulnerable populations. In collaboration with Senior Health Facilities (SHFs) and domain experts, this paper presents iFair, a novel framework designed to assist decision-makers in equitably allocating scarce resources to older adults. iFair was prototyped in the context of ongoing work on a data exchange platform, CAREDEX, used for enhancing older adults' resilience during disasters. A key novelty of iFair focuses on aligning resident preferences with resources in urgent situations, expediting care, and enhancing task efficiency. We integrate static and dynamic environmental data, including facility layouts and sensor data, with detailed resident profiles to cater to the individual needs and preferences of residents. While our framework primarily focuses on allocation within facilities, it also extends to a regional scale to support the planning and transfer of seniors to mutual aid facilities. Our experiments adapt data from a real SHF to emulate resource allocation in an emergency fire evacuation setting and highlight the delicate balance that decision-makers can achieve between efficiency and fairness.

Kenne, Modeste Mefenya↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗