Search NASA⌕ Search

SEARCH · Search NASA

Results for “Deliverable capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Continuous-time look-ahead flexible ramp scheduling in real-time operation

This paper develops a novel continuous-time look-ahead optimization model for co-optimizing balancing energy and flexible ramp products in real-time power systems operation. In addition, a continuous-time day-ahead operation model is developed to commit and schedule an adequate subset of generating units for providing balancing energy and ramping requirements in real-time operation. The up and down flexible ramp products are defined as continuous-time decision trajectories that continuously supply the real-time up and down ramping requirements of the system. The deliverability of flexible ramp products is secured through reserving the respective power requirements in generation capacity constraints of generating units. A function space solution method is proposed to reduce the dimensionality of day-ahead and real-time models through projecting them into finite-dimensional function spaces spanned by Bernstein polynomials, where the real-time operation decisions are modeled with a higher accuracy level than day-ahead decisions. Simulations are conducted on the IEEE-RTS system using CAISO load data, and the numerical results showcase the effectiveness of the proposed model in supplying the energy and flexible ramp requirements and avoiding ramping scarcity in the system, while reducing the operation costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Alternatives for California North Coast Offshore Wind, Volume 4: Cost-Benefit Analysis Report

The purpose of this report is to compare the costs and benefits of installing offshore wind power plants with capacities up to 500 megawatts (MW) in the Humboldt Wind Energy Area offshore California, focusing on identifying the costs related to transmission upgrades and possible alternatives such as energy storage. We identify several options that result in lower costs than upgrading transmission to provide full deliverability. Our estimates of the levelized cost of energy (LCOE) assuming full deliverability range from $80/MWh for a 144-MW plant to $73/MWh for a 480-MW plant with a 2030 commercial operation date; however, the additional cost of transmission upgrades increases these values to between $86/MWh and $98/MWh. Based on curtailment and revenue estimates developed using a production cost model, the LCOEs for plant capacities of 144 MW and 168 MW with Energy Only deliverability are lower than the combined cost of energy and transmission upgrades for full deliverability. The addition of a 4-hour, 15-MW battery energy storage system increases revenue for both plant sizes, with the 144 MW + storage scenario producing the most revenue relative to LCOE.

17 WIND ENERGY↗

Electric Vehicles Charging Time Constrained Deliverable Provision of Secondary Frequency Regulation

Aggregation of electric vehicles (EVs) is a promising technique for providing secondary frequency regulation (SFR) in highly renewable energy-penetrated power systems. Equipped with energy storage devices, EV aggregation can provide reliable SFR. However, the main challenge is to guarantee reliable intra-interval SFR capacities and inter-interval delivery following the automatic generation control (AGC) signal. Furthermore, aggregated EV SFR provision will be further complicated by the EV charging time anxiety because SFR provision might extend EV's charging time. This paper proposes a deliverable EV SFR provision with a charging-time-constrained control strategy. First, a charging-time-constrained EV aggregation is proposed to address the uncertainty of EV capacity based on the state-space model considering the charging-time restriction of EV owners. Second, a real-time economic dispatch and time domain simulation (RTED-TDS) cosimulation framework is proposed to verify financial results and the dynamic performance of the EV SFR provision. Last, the proposed charging time-constrained EV aggregation is validated on the IEEE 39-bus system. In conclusion, the results demonstrate that with charging time-constrained EV aggregation, the dynamic performance of the system can be improved with a marginal increase in total cost. More importantly, the charging time constraint can be respected in the proposed SFR provision of the EV aggregation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Secondary Frequency Regulation from Variable Generation through Uncertainty Decomposition: An Economic and Reliability Perspective

The rapid integration of variable generation (VG), such as photovoltaics (PV), necessitates an increase in the secondary frequency regulation (SFR) to handle the system intra-dispatch interval imbalance because of VG's variation. Although PV has the control capability to provide SFR, the main challenge is in guaranteeing the delivery of PV's energy and SFRs capacities in the automatic generation control (AGC) within each dispatch interval considering its uncertainty. This paper proposes a deliverable VG SFR provision model with endogenous VG's power uncertainty decomposition. First, the uncertainty of VG is decomposed using distributionally robust chance constraints through which the deliverable SFR provision is guaranteed. Next, the intra-interval frequency response of PV's SFR is validated with a user defined AGC model including the PV power plant. Finally, the economic benefits and the reliability improvements such as the frequency deviation reduction with PV providing SFRcan be integrated and evaluated. The proposed model is tested in a modified 18-bus system and in the Western Electricity Coordinating Council test system. Results demonstrate that with the deliverable SFR from PV, the system cost and the frequency reliability can be improved simultaneously. PV's SFR performance can be guaranteed with the proposed model.

14 SOLAR ENERGY↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Jumpstart Opportunities to Unleash Leadership in Energy Storage (JOULES)

Current-generation Li-ion batteries with cobalt- and nickel-containing cathodes and graphite anodes are approaching performance and cost limits. In this program, 24M Technologies, Inc. (24M) is teaming with the Massachusetts Institute of Technology (MIT) and University of Michigan (UM) to develop low cost and fast charging sodium metal batteries with good low-temperature performance and high energy density, building upon previous work performed under ARPA-E programs. Key achievements include optimization of solid electrolyte and anode current collector, optimized cathode active materials, development of high-performance electrolyte formulations, and integration of these components into full cells. The cell design incorporates (1) an ultra-thick cathode (>9 mAh/cm 2 ) comprising advanced cobalt-free, sodium cathode active material, (2) advanced fast-charging electrolyte (up to 12 mS/cm) developed using machine learning and automated high-throughput screening technology by UM, and (3) ceramic modified separator that enable smooth Na transport and deposition, developed at MIT, enabling a high-energy density anode-free configuration and maximizing the energy density of sodium batteries. The team has successfully combined these approaches to sodium chemistry and paved the way to meeting the fast-charging, high-energy density, and low-cost requirements of next-generation drone, electric vertical take-off and -landing, and electric vehicle batteries. Performance for anode-free sodium cells developed under this program is more powerful than the commercial Li-ion batteries. The final deliverable cell design has achieved over 300 Wh/kg and volumetric energy density above 800 Wh/L (Table 1). Additionally, the team has achieved over (1) a lifetime of 340 cycles, (2) 80% capacity retention at -20 °C (compared 25 °C), and (3) the ability to fast charge to 80% SOC in 20 minutes.

25 ENERGY STORAGE↗

Technical Assistance for Rural Alaska Tribal Energy Solutions (Final Technical Report)

The original intent of this project was to provide technical assistance (TA) to rural Tribal communities across all regions of Alaska with a focus on public infrastructure. The Alaska Native Tribal Health Consortium (ANTHC) met this goal by providing more than 48 instances of energy-related technical assistance to rural Alaska Native communities, many of which led to them securing funding and implementing new projects that contributed to reducing the high cost of energy. Additionally, the Department of Energy (DOE) Office of Indian Energy staff saw the benefits of the energy technical assistance services being provided by ANTHC and, recognizing the value of having a trusted tribal non-profit entity providing technical support to its membership, amended the project to include standardization of TA services, internal capacity building, and regional outreach. This amended scope allowed ANTHC to streamline and standardize its technical assistance process, provide outreach to rural Alaska Native communities about DOE and ANTHC’s technical assistance program, and improve the ability of staff to provide even higher quality technical deliverables in support of energy projects. Overall, this project was successful in using technical assistance to empower both rural Alaska Native communities and the Alaska Native Tribal Health Consortium to develop and deploy energy efficiency and renewable energy solutions that will reduce the extremely high energy cost burdens facing Tribal communities in Alaska.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ASEAN Technical Exchange Workshop for System Operators, Regulators, and Policymakers

This presentation provides an in-depth exploration of power system planning, cross-border electricity trading, and battery energy storage systems (BESS), offering actionable insights for system operators, regulators, and policymakers. The first section delves into power system planning and analysis, focusing on capacity expansion models and resource adequacy studies, including their role in optimizing system efficiency, managing emissions, and addressing system reliability risks. Key considerations, such as integration of transmission into generation planning and the forecasting versus optimization of customer distributed energy resources (DER) technologies, are explored. The session highlights critical trade-offs in spatial granularity and model runtimes, as well as the feasibility of aligning distribution investments with capacity expansion efforts. The second section examines cross-border electricity trading, with an emphasis on resource adequacy concepts such as reliability targets, loss of load expectation (LOLE), and planning reserve margins (PRM). Case studies on reserve market design and coordination across US regions provide insights into improving reserve deliverability and managing interregional power balance and congestion. This section also addresses market-to-market congestion management, including advanced strategies for high-voltage direct current (HVDC) optimization and ancillary service delivery. Finally, the presentation covers the rapid evolution of Battery Energy Storage Systems (BESS), highlighting their operational growth, regulatory frameworks, and use cases in grid flexibility, energy storage, and reliability. The discussion focuses on the benefits of BESS for system stability, resilience, and integration of renewable energy, offering insights into its role as a vital component in the transition toward a more sustainable and flexible grid. Key performance parameters, such as throughput, round-trip efficiency, and state of charge, are also examined.

25 ENERGY STORAGE↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Illinois Basin Regional DAC Hub TA-1: Feasibility (Phase-0) (Final Scientific/Technical Report)

The overall objective of this project was to complete a feasibility study for a Regional Direct Air Capture (DAC) Hub that encompasses Illinois, Indiana, and Kentucky. The geographic construct of this hub was based on the Illinois Basin – a geological area where at least seven (7) geological storage studies were conducted. The Hub was designed to assure a capacity to capture, store, and utilize at least 1,000,000 metric tons (tonnes) of CO2 from the atmosphere annually 1 metric tonnes per annum (MTA), starting from an initial capacity of 200,000 tonnes of CO2 per annum (KTA). The Hub also included:(1) clean energy providers to supply renewable energy to the DAC units; (2) geological storage facilities to inject and sequestrate the captured CO2; (3) CO2 utilization facilities that would uptake the captured CO2 and convert it into products; and (4) small business organizations that would assist in workforce development efforts for the region. This closeout report consolidates the tasks undertaken and accomplished as deliverables for the project. The project team had successfully completed all required tasks of phase 0a, confirming that the project is feasible based on the preliminary conceptual designs and operational requirements of the DAC systems. Of particular interest, the hub ownership structure was identified and was implemented in follow on projects that would transition the hub infrastructure to a build/operate phase.

36 MATERIALS SCIENCE↗

Concurrent Cooling Effects of Dynamic Line Ratings on Wind Plant Gen-Tie Lines

This report was prepared for the Wind Energy Technology Office for the FY 2022, quarter 2 deliverable. This details the use of dynamic line rating technology to rate a series of gen tie lines connecting wind plants to the regional transmission lines. This consists of two primary study regions, the first on the desert west of Idaho Falls, and the second in the region east of the Cascades along the Columbia River Gorge. The TREAD program that was developed at INL was used to create generated gen-tie lines based on nearby regional transmission line connections. The capacity availability of the gen tie lines are compared with the power production of the wind farms. Overall, the INL Site location shows a much greater capacity for the gen-tie lines due to the higher wind speeds. Across both locations, the HRRR data shows higher wind speeds than observed at the observational weather stations. For both the Columbia Gorge and Idaho areas, the sites show that a statically rate gen-tie could carry additional capacity far above the rated during periods of high wind due to the concurrent cooling effects.

17 WIND ENERGY↗

CTES Pilot Plant Detailed Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the Detailed Design phase deliverables comprising of the process, mechanical, electrical, piping along with control and instrumentation documents. Civil and structural deliverables are included on a preliminary basis due to outstanding site investigation activities. CTES block transportation testing results and the pilot plant testing plan is also included in this report.

25 ENERGY STORAGE↗

Front End Engineering Design Report

Energy storage is becoming an increasingly important component on modern power grids to ensure sufficient balancing capability for intermittent renewable power generations is available to maintain system reliability. Although energy storage has traditionally been provided by pumped storage hydroelectric systems, it is not possible to install these at every location and they can be expensive to construct. Lithium Ion batteries are increasingly being used to carry out energy storage grid services, however these can be expensive when specified over a few hours of capacity. An alternative way to store substantial energy is to use thermal energy storage (TES). This has been deployed on concentrated solar units using molten nitrate salts as a storage media. Again, the cost of the material can be prohibitive, thus lower cost alternative materials are being actively sought, such as sand, rocks and concrete. This project investigates the potential for Concrete Thermal Energy Storage (CTES) when used to directly store thermal energy from a thermal plant source. This report represents the initial Front-End Engineering Design (FEED) deliverables that are submitted for the Hazard and Operability (HAZOP) safety review for process validation.

25 ENERGY STORAGE↗

Flexible Ramping Product Procurement in Day-Ahead Markets

Flexible ramping products (FRPs) emerge as a promising instrument for addressing steep and uncertain ramping needs through market mechanisms. Initial implementations of FRPs in North American electricity markets, however, revealed several shortcomings in existing FRP designs. Here, in many instances, FRP prices failed to signal the true value of ramping capacity, most notably evident in zero FRP prices observed in a myriad of periods during which the system was in acute need for rampable capacity. These periods were marked by scheduled but undeliverable FRPs, often calling for operator out-of-market actions. On top of that, the methods used for procuring FRPs have been primarily rule-based, lacking explicit economic underpinnings. In this paper, we put forth an alternative framework for FRP procurement, which seeks to set FRP requirements and schedule FRP awards such that the expected system operation cost is minimized. Using real-world data from U.S. ISOs, we showcase the relative merits of the framework in (i) reducing the total system operation cost, (ii) improving price formation, (iii) enhancing the the deliverability of FRP awards, and (iv) reducing the need for out-of-market actions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Nuclear Spent Fuel Disposal in Clay-Bearing Rock - Process Model Development and Experimental Studies

This report represents the milestone deliverable M2SF-23SN010301072 “Evaluation of Nuclear Spent Fuel Disposal in Clay-Bearing Rock - Process Model Development and Experimental Studies” The report provides a status update of FY23 activities for the work package Argillite Disposal work packages for the DOE-NE Spent Fuel Waste Form Science and Technology (SFWST) Program. Clay-rich geological media (often referred as shale or argillite) are among the most abundant type of sedimentary rock near the Earth’s surface. Argillaceous rock formations have the following advantageous attributes for deep geological nuclear waste disposal: widespread geologic occurrence, found in stable geologic settings, low permeability, self-sealing properties, low effective diffusion coefficient, high sorption capacity, and have the appropriate depth and thickness to host nuclear waste repository concepts. The DOE R&D program under the Spent Fuel Waste Science Technology (SFWST) campaign has made key progress (through experiment, modeling, and testing) in the study of chemical and physical phenomena that could impact the long-term safety assessment of heat-generating nuclear waste disposition in clay/shale/argillaceous rock. International collaboration activities comprising field-scale heater tests, field data monitoring, and laboratory-scale experiments provide key information on changes to the engineered barrier system (EBS) material exposed high thermal loads. Moreover, consideration of direct disposal of large capacity dual-purpose canisters (DPCs) as part of the back-end SNF waste disposition strategy has generated interest in improving our understanding of the effects of elevated temperatures on the engineered barrier system (EBS) design concepts. Chemical and structural analyses of sampled bentonite material from laboratory tests at elevated temperatures are key to the characterization of thermal effects affecting bentonite clay barrier performance. The knowledge provided by these experiments is crucial to constrain the extent of sacrificial zones in the EBS design during the thermal period. Thermal, hydrologic, mechanical, and chemical (THMC) data collected from heater tests and laboratory experiments have been used in the development, validation, and calibration of THMC simulators to model near-field coupled processes. This information leads to the development of simulation approaches to assess issues on coupled processes involving porous media flow, transport, geomechanical phenomena, chemical interactions with barrier/geologic materials, and the development of EBS concepts. These lines of knowledge are central to the design of deep geological backfilled repository concepts where temperature plays a key role in the EBS behavior, potential interactions with host rock, and long-term performance in the safety assessment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A phased workflow to define permit‐ready locations for large volume CO 2 injection and storage

Abstract To‐date, only two UIC Class VI permits have been issued by the US Environmental Protection Agency. We illustrate a four‐phase workflow to first identify regional storage resources and then down‐select sites to yield permit‐ready locations that can accept and store large volumes of CO 2 . Specific permit requirements should guide objectives and define deliverables of respective workflow phases. In the first phase we used available regional data and screened structure and injection zones to locate resources that match CO 2 volumes planned to be captured. Available data were also used to assess presence and depth of usable groundwater, the key resource being protected via permitting. We then used advanced, closed‐form, analytical solutions (EASiTool) to estimate CO 2 injectivity into each hydrologically connected injection compartment. In the second phase we acquired and conditioned additional wireline logs and leased available seismic datasets. We interpreted the depositional systems from wireline well‐log character and mapped sandbody geometry to interpolate injection and confining‐zone distribution. Using available data, we mapped faults and locations of freshwater and overpressure (or other capacity‐limiting geologic parameters) in more detail. In the third phase, we used the augmented geologic data to develop a static model for the selected area, extracted the areas of highest interest, and generated and ran dynamic (flow) models. In a fourth phase, we reduced major uncertainties identified in earlier phases. Our case study indicates that to complete preparation of a permit application requires (1) improved lithologic characterization information (thicknesses and horizontal and vertical connectivity) and (2) better definition of poorly defined local faults. © 2023 The Authors. Greenhouse Gases: Science and Technology published by Society of Chemical Industry and John Wiley & Sons Ltd.

58 GEOSCIENCES↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 4.0 Deliverable – Geologic Analysis Report

Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations, which were investigated through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was acquired to help select the site for Westover #2, and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment.

20 FOSSIL-FUELED POWER PLANTS↗