Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ice storage model-predictive control in an office building with PV: scenario, error and sensitivity analysis

Thermal energy storage (TES) can enable more building-sited renewable electricity generation and lower utility bill costs for buildings owners and occupants, especially when there are high demand and variable time-of-use (TOU) charges. A model predictive control (MPC) strategy can offer additional savings over a schedule-based control with added complexity and reliance on forecasts. Here, this study examines savings for medium office buildings with chiller plants in three locations with building-installed solar photovoltaics (PV) to understand the impact of MPC. Control setpoints are fixed by a schedule-based control or optimized by nonlinear MPC. These control setpoints are actuated within EnergyPlus building models to simulate the utility cost of the chiller plant. NLP solutions can be unstable or unrealistic, but our results show that by regularizing the NLP, the solutions can be reasonably followed by the building model. MPC models make simplifications that lead to errors once the controller is participating in and changing the operation of the building. These errors average 9 % across the cases, showing that the most important parts of the system are represented. The no-thermal load costs are computed to show that the optimization can in some cases achieve both the minimum TOU and minimum monthly demand costs by demand management while reducing TOU energy costs by energy arbitrage. The MPC saves 35–66 % in the annual chiller plant operating costs, which is an additional savings above the schedule by 1–33 %. PV and TES are complementary and mostly independent, but a load with PV often results in better performance for the schedule. Our case study and sensitivity analysis show the importance of modeling and optimization for complex rates, but also the circumstances wherein a simpler strategy achieves the same performance with less potential for error.

14 SOLAR ENERGY↗

Modular supply chain optimization considering demand uncertainty to manage risk

Supply chain under demand uncertainty has been a challenging problem due to increased competition and market volatility in modern markets. Flexibility in planning decisions makes modular manufacturing a promising way to address this problem. We report the problem of multiperiod process and supply chain network design is considered under demand uncertainty. A mixed integer two-stage stochastic programming problem is formulated with integer variables indicating the process design and continuous variables to represent the material flow in the supply chain. The problem is solved using a rolling horizon approach. Benders decomposition is used to reduce the computational complexity of the optimization problem. To promote risk-averse decisions, a downside risk measure is incorporated in the model. The results demonstrate the several advantages of modular designs in meeting product demands. A pareto-optimal curve for minimizing the objectives of expected cost and downside risk is obtained.

42 ENGINEERING↗

Distribution Transformer Demand: Understanding Demand Segmentation, Drivers, and Management Through 2050

The National Renewable Energy Laboratory (NREL) has been working closely with the U.S. Department of Energy's Office of Electricity (OE) to understand the critical drivers and potential means of managing distribution transformer demand through 2050. This effort has consulted with utility representative organizations and transformer manufacturers to understand the problem, characterized the in-service assets, and modeled future demand. Distribution transformers, or service transformers, range from 10 to 5,000 kilovolt-amperes (kVA), have a high-side voltage of less than 34.5 kilovolts, and have step-down power delivery for customer end use. This research will help the manufacturing sector understand production requirements and better inform utility strategies for managing their demand.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Insights from PPL's DERMS Implementation

PPL Electric Utilities’ Keystone Solar Future Project (KSFP) is part of the U.S. Department of Energy’s Office of Energy Efficiency and Renewables, Energy Enabling Extreme Real-time Grid Integration of Solar Energy (ENERGISE) grant. The three-year project, beginning in October, 2017, funded an innovative pilot program to develop and evaluate a technology platform and framework for managing high levels of distributed energy resources (DER), and improving future DER interconnection. The KSFP aimed to bridge gaps between existing and future technology, including Distributed Energy Resource Management Systems (DERMS), by monitoring, managing, and optimizing a system with high penetration of solar and other DER. Specifically, the project worked to make Demand Management Systems (DMS) applications, devices, and real-time communications technology DER-aware to allow for advanced applications for utility operations. Here, by installing and implementing a DERMS, project designers transformed how DERs interact with PPL’s distribution system, offering learnings and results worth sharing industry-wide.

Leader, Jared↗

Demand Driven Energy Management for PIPO Auxiliary Power Supply Architecture

In this paper, a demand driven energy management (DDEM) technique is implemented on modular parallel input parallel output DC/DC auxiliary power supply (APS) structure. In this method, modules are brought in/out of the operation making them operate under high loading conditions, avoiding low efficiency under light load. Such a method finds its application in power conservative systems with variable load. Implementation of DDEM and the energy saved is shown using APS comprised of two 15W commercially off-the-shelf DC-DC modules, with 100–1000 VDC input and 24 V output voltage. Along with the DDEM, the lifetime of the power stage devices is controlled minimizing their junction temperature swing through control of cooling system. This control method uses digital twin as interface to virtualize the power devices loading operation/ health condition. Accordingly, no extra sensor or closed loop control required to measure the junction temperature of the devices or feedback the losses to the cooling flow.

Azadeh, Yalda↗

Accelerating Transitions to Zero Carbon Power Systems

As power systems evolve, becoming increasingly renewable, distributed, dynamic, and digital, managing them becomes ever more challenging and complex. System operators serve as the "air traffic controllers" for electricity grids, working to balance supply and demand, manage evolving electricity markets, and ensure the safety and reliability of electricity systems. To adapt to the rapidly changing energy landscape and support the transition to modern, zero carbon power systems, system operators must develop and adopt new technologies, approaches, and frameworks. The Global Power System Transformation (G-PST) Consortium is a network of system operators, research institutions, and industry partners working to accelerate and scale the technical solutions required to transform our world's power systems. By developing and sharing robust models and tools, research and demonstration results, knowledge, and innovation, the G-PST Consortium is empowering system operators to transition to 100% renewable energy while ensuring the reliability, safety, and cost-effectiveness of grid operations.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Data-driven modeling to enhance municipal water demand estimates in response to dynamic climate conditions

Altered precipitation and temperature patterns from a changing climate will affect supply, demand, and overall municipal water system operations throughout the arid western U.S. While supply forecasts leverage hydrological models to connect climate influences with surface water availability, demand forecasts typically estimate water use independent of climate and other externalities. Stemming from an increased focus on seasonal water demand management, we use the Salt Lake City, Utah municipal water system as a test bed to assess model accuracy versus complexity trade-offs between simple climate-independent econometric-based models and complex climate-sensitive data-driven models to average to extreme wet and dry climate conditions—representative of a new climate normal. Here, the climate-independent model displayed low performance during extreme dry conditions with predictions exceeding 90% and 40% of the observed monthly and seasonal volumetric demands, respectively, which we attribute to insufficient model complexity. The climate-sensitive models displayed greater accuracy in all conditions, with an ordinary least squares model demonstrating a measurable reduction in prediction bias (3.4% vs. -27.3%) and RMSE (74.0 lpcd vs. 294 lpcd) compared to the climate-independent model. The climate-sensitive workflow increased model accuracy and characterized climate-demand interactions, demonstrating a novel tool to enhance water system management.

54 ENVIRONMENTAL SCIENCES↗

Public water supply infrastructure extensification and diversification in surface waters is insufficient to meet future demands in Texas

The data were developed to evaluate the capacity of existing and potential new surface water supply infrastructure to meet projected public water demands across districts in Texas under multiple future socioeconomic and climate scenarios. The database integrates hydrologic, water quality, infrastructure, energy, cost, demographic, and demand-projection information for candidate surface water supply locations. Candidate sites include stream reaches, waterbodies, reservoir surplus locations, and potential new reservoir sites. Water availability is characterized using historical and projected flow conditions, while site suitability is evaluated using five indicators: Water Availability Index (WAI), Water Quality Index (WQI), Energy Requirement Index (ERI), Water Treatment Cost (WTC), and Water Infrastructure Cost (WIC). The datasets include statewide candidate-site information, district-level demand projections under Shared Socioeconomic Pathways (SSPs), runoff-based allocation constraints, climate-stress metrics, and optimization outputs evaluating alternative infrastructure planning strategies. Optimization results compare Business-as-Usual (BAU) and All Surface Water (AllSW) demand-management approaches under both scaled and fixed cost-cap strategies. Associated validation datasets provide district-level feasibility assessments, infrastructure selection outcomes, cost-cap utilization, demand satisfaction metrics, and constraint diagnostics. Additional datasets quantify projected changes in storage and flow conditions as well as water availability stress for both existing and newly selected intake locations under the SSP5 scenario for mid-century and late-century climate conditions. Together, these datasets support assessment of the extent to which surface-water infrastructure expansion and diversification strategies can satisfy future public water demands while accounting for hydrologic, economic, and planning constraints across Texas. Dataset(s) Description Dataset_preoptimization.xlsx Comprehensive pre-optimization dataset containing candidate water-supply sites and associated hydrologic, water-quality, infrastructure, climate, demographic, runoff, and demand-projection variables used as inputs to the optimization analyses. Includes variable descriptions and the full statewide candidate-site database. District_level_site_selection.zip - Compressed archive containing all SSP-specific district-level optimization result files MESIO_ssp1_results.xlsx District-level site selection results for SSP1 (MESIO). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. MESID_ssp2_results.xlsx District-level site selection results for SSP2 (MESID). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. LCMRD_ssp3_results.xlsx District-level site selection results for SSP3 (LCMRD). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-Low_ssp4l_results.xlsx District-level site selection results for SSP4-Low (IRDev-Low). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. IRDev-High_ssp4h_results.xlsx District-level site selection results for SSP4-High (IRDev-High). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. RSIM_ssp5_results.xlsx District-level site selection results for SSP5 (RSIM). Includes variable descriptions, BAU and AllSW site-selection results under scaled and fixed cost strategies, and district-level validation diagnostics. tx_hydrological_stress.xlsx Hydrological stress dataset for existing and newly selected intake locations. Includes projected mid-century and late-century changes, gain/loss classifications, planning strategy information, and accompanying variable descriptions. Also includes water-stress metrics derived from historical and projected low-flow conditions.

Okoye, Perpetua I. (ORCID:0000000215545033)↗

DERMS-RT (Distributed Energy Resource Management Solution using Real-Time Optimization) [SWR-20-46]

DERMS-RT provides a distributed energy resource management solution using real-time optimization to control different types of distributed energy resources (DERs) — such as rooftop PVs, battery energy storage systems, HVAC loads, electric water heater loads, and EV charging loads, and use these DERs to provide distribution voltage regulation and peak demand management services. The control approach implemented by DERM-RT is developed based on the real-time optimal power flow and distributed control previously developed by NREL researchers. The software codes are designed to provide modular DER management solution that can be easily applied to control heterogeneous DERs in distribution grids in coordination with centralized utility management systems. Also, DERMS-RT provides application programming interface (API) to extract useful grid model information from an open-source power system simulation software, use the information to solve the optimization problem, and apply the optimal set-points to the controlled DERs. In this way, DERMS-RT provides a plug-and-play function for implementing the real-time DER control on different utility system models, and it can be used as a simulation testbed to demonstrate the impact of real-time DER optimization on improving grid operations.

Ding, Fei↗

Energy Management Information Systems Technical Resources Report

Guide supports federal facility staff in understanding, designing, procuring, and implementing Energy Management Information Systems (EMIS) as a valuable component of their portfolio-level energy and water planning and management strategies. As a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance, EMIS tools present significant opportunities for federal sector energy savings and improved operational performance. EMIS are at the forefront of transforming energy management best practices by providing building owners and operators with well-organized building performance and energy consumption data, enabling a host of analytic capabilities. These capabilities include portfolio-wide energy benchmarking, data visualization, and key performance indicator tracking; automated fault detection and diagnostics (AFDD); artificial intelligence for predictive analytics and control; automated measurement and verification of energy conservation measures; and supervisory control enabling automated system optimization and demand management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lawrence Berkley National Laboratory Building 59

The building management system in Building 59 is monitoring and archiving building-level electricity usage, HVAC and lighting system states (e.g., setpoint, temperature, flow rate, pressure), indoor environmental conditions (air temperature, relative humidity, CO2), on-site weather (air temperature, relative humidity), and especially occupant counts as well as other metrics such as Wi-Fi signal. This dataset could support multiple use cases, such as model predictive control and occupant related demand management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lawrence Berkley National Laboratory Building 59 (Raw)

The building management system in Building 59 is monitoring and archiving building-level electricity usage, HVAC and lighting system states (e.g., setpoint, temperature, flow rate, pressure), indoor environmental conditions (air temperature, relative humidity, CO2), on-site weather (air temperature, relative humidity), and especially occupant counts as well as other metrics such as Wi-Fi signal. This dataset could support multiple use cases, such as model predictive control and occupant related demand management. Raw data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lawrence Berkeley National Lab Building 59

The building management system in Building 59 is monitoring and archiving building-level electricity usage, HVAC and lighting system states (e.g., setpoint, temperature, flow rate, pressure), indoor environmental conditions (air temperature, relative humidity, CO2), on-site weather (air temperature, relative humidity), and especially occupant counts as well as other metrics such as Wi-Fi signal. This dataset could support multiple use cases, such as model predictive control and occupant related demand management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data-driven modeling of dynamic occupant thermostat override behavior for demand response applications

Buildings consume nearly 40% of global energy and produce similar emissions. Whiletechnological advances address efficiency, occupant behavior causes energy use variations up to 300% between identical buildings. This gap between predicted and actual building performance impacts building design, operations, and grid demand management programs. Through analyses of smart thermostat data from 1,400 single-occupant homes, the researchdemonstrates that occupants respond to 8°F thermostat setpoint changes within a median of 15 minutes, while 2°F changes trigger responses within a median of 30 minutes. This highlights an understudied temporal relationship between thermostat setbacks and response time of occupant behaviors. Models of such behavior dynamics are required to incorporate occupant impacts into building performance simulation. A key contribution of this dissertation is the Thermal Frustration Theory (TFT), which positsthat thermal discomfort driven behaviors are caused by the time-accumulation of discomfort, not simply a temperature deviation threshold or a delay from an initiating event. Using a dataset of 634 thermostats, each with 25+ manual setpoint changes, a comparative analysis of TFT and comfort zone and a delayed response theories demonstrated that personalized TFT models better predict when manual setpoint change occur. This was measured by the area under the curve statistical measure (AUC); all three models perform similarly by a Matthews Correlation Coefficient measure. Higher AUC performance is especially important for modeling occupant behavior in demand response programs where false negatives of rare occupant interactions could adversely affect grid stability. EnergyPlus based simulations were conducted with TFT-derived occupant models, demonstrating the ability to identify parameters of known TFT models from only data observable with smart thermostats, even under the presence of noise from routine overrides. Overall, the dissertation highlights that thermostat interactions are neither static,instantaneous, nor driven solely by the environment. Instead, temporal accumulation of discomfort and routine-based behavior play important roles. The methodology and results offer a pathway towards more accurate modeling of human-building interactions for policy assessment, building design, and demand response programs.