Search NASA⌕ Search

SEARCH · Search NASA

Results for “Depot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Architecture Study for a Fuel Depot Supplied from Lunar Assets

This architecture study sought to determine the optimum architecture for a fuel depot supplied from lunar assets. Four factors - the location of propellant processing (on the Moon or on the depot), the depot location (on the Moon, L1, GEO, or LEO), the propellant transfer location (L1, GEO, or LEO), and the propellant transfer method (bulk fuel or canister exchange) were combined to identify 18 candidate architectures. Two design reference missions (DRMs) - a commercial satellite servicing mission and a Government cargo mission to Mars - created demand for propellants, while a propellant delivery DRM examined supply issues. The study concluded Earth-Moon L1 is the best location for an orbiting depot. For all architectures, propellant boiloff was less than anticipated, and was far overshadowed by delta-v requirements and resulting fuel consumption. Bulk transfer is the most flexible for both the supplier and customer. However, since canister exchange bypasses the transfer of bulk cryogens and necessary chilldown losses, canister exchange shows promise and merits further investigation. Overall, this work indicates propellant consumption and loss is an essential factor in assessing fuel depot architectures.

Perrin, Thomas M.↗

Evaluation of cryogenic system test options for the OTV on-orbit propellant depot

Future space missions to geosynchronous, lunar, and planetary orbits will require an orbital depot for stockpiling propellants. This depot will provide long-term storage of cryogens, requiring new technologies for fluid management in microgravity and further development of thermal management technologies for minimization of cryogen boiloff. Preliminary evaluations have been made to define a test program approach for reducing technical risk through verifying performance models and building a base of engineering data for depot design. A number of testing options were defined and evaluated, leading to selection of ground testing combined with an orbital systems test. Ground testing is inadequate because of critical microgravity concerns; extending testing aboard the Space Station was eliminated because the data would not be available soon enough to benefit the propellant depot design. The orbital test would either be a short-term test carried out in the cargo bay of the Space Shuttle Orbiter using a nonhazardous cryogen or a longer term test carried out with hydrogen aboard a free-flying experiment orbited with an expendable launch vehicle.

Schuster, John R.↗

Orbiting Depot and Reusable Lander for Lunar Transportation

A document describes a conceptual transportation system that would support exploratory visits by humans to locations dispersed across the surface of the Moon and provide transport of humans and cargo to sustain one or more permanent Lunar outpost. The system architecture reflects requirements to (1) minimize the amount of vehicle hardware that must be expended while maintaining high performance margins and (2) take advantage of emerging capabilities to produce propellants on the Moon while also enabling efficient operation using propellants transported from Earth. The system would include reusable single- stage lander spacecraft and a depot in a low orbit around the Moon. Each lander would have descent, landing, and ascent capabilities. A crew-taxi version of the lander would carry a pressurized crew module; a cargo version could carry a variety of cargo containers. The depot would serve as a facility for storage and for refueling with propellants delivered from Earth or propellants produced on the Moon. The depot could receive propellants and cargo sent from Earth on a variety of spacecraft. The depot could provide power and orbit maintenance for crew vehicles from Earth and could serve as a safe haven for lunar crews pending transport back to Earth.

Petro, Andrew↗

Simple, Robust Cryogenic Propellant Depot for Near Term Applications

The ability to refuel cryogenic propulsion stages on-orbit provides an innovative paradigm shift for space transportation supporting National Aeronautics and Space Administration s (NASA) Exploration program as well as deep space robotic, national security and commercial missions. Refueling enables large beyond low Earth orbit (LEO) missions without requiring super heavy lift vehicles that must continuously grow to support increasing mission demands as America s exploration transitions from early Lagrange point missions to near Earth objects (NEO), the lunar surface and eventually Mars. Earth-to-orbit launch can be optimized to provide competitive, cost-effective solutions that allow sustained exploration. This paper describes an experimental platform developed to demonstrate the major technologies required for fuel depot technology. This test bed is capable of transferring residual liquid hydrogen (LH2) or liquid oxygen (LO2) from a Centaur upper stage, and storage in a secondary tank for up to one year on-orbit. A dedicated, flight heritage spacecraft bus is attached to an Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA) ring supporting experiments and data collection. This platform can be deployed as early as Q1 2013. The propellant depot design described in this paper can be deployed affordably this decade supporting missions to Earth-Moon Lagrange points and lunar fly by. The same depot concept can be scaled up to support more demanding missions and launch capabilities. The enabling depot design features, technologies and concept of operations are described.

McLean, Christopher↗

Development of a Lunar Consumables Storage and Distribution Depot

NASA is in the preliminary planning stages for a future lunar base as a response to President George W. Bush's recent announcement of a new sustained exploration program beyond low earth orbit. Kennedy Space Center engineers are supporting this program by utilizing experience in Spaceport system design and operations to help develop a Lunar Consumables Depot. This depot will store propellants, life support fluids, and other consumables either transported from Earth or manufactured from In Situ resources. The depot will distribute these consumables in an energy efficient manner to end users including spacecraft, habitation modules, and rovers. This paper addresses some of the changes to lunar base architecture design as a result of advances in knowledge of lunar resources over the past 35 years, as well as technology advances in the area of In Situ Resource Utilization and consumable storage and distribution. A general system level description of the depot will be presented, including overall design philosophy and high level requirements. Finally, specific subsystem technologies that have been or will be developed by KSC will be addressed. Examples of these technologies are automated umbilicals, cryogenic refrigerators, novel storage vessels, advanced heat switches and heat exchangers, and self healing gaskets and wires.

Mueller, Robert P.↗

Propellant transfer: Tethered depot

Spacebasing of orbital transfer vehicles at a space station requires a depot that safely and efficiently stores and transfers the resupply propellants. In order to transfer propellants, a method effectively acquire only liquid and vent only gas must exist. A method that produces a low gravity to settle propellants would bypass these weaknesses, while allowing ground-like operations. This low gravity can be passively produced using gravity gradient techniques. A satellite with a large length to diameter ratio, such as a depot attached to a space station with a tether, stabilizes along on Earth radial because of an outward acceleration proportional to the distance from the satellite's center of gravity. Analysis indicates that liquid can be setteled with relatively short tether lengths. The feasibility, design requirements, and operational limitations of a tethered refueling depot were investigated with special emphasis on slosh control.

Kroll, K.↗

Developing a safe on-orbit cryogenic depot

New U.S. space initiatives will require technology to realize planned programs such as piloted lunar and Mars missions. Key to the optimal execution of such missions are high performance orbit transfer vehicles and propellant storage facilities. Large amounts of liquid hydrogen and oxygen demand a uniquely designed on-orbit cryogenic propellant depot. Because of the inherent dangers in propellant storage and handling, a comprehensive system safety program must be established. This paper shows how the myriad and complex hazards demonstrate the need for an integrated safety effort to be applied from program conception through operational use. Even though the cryogenic depot is still in the conceptual stage, many of the hazards have been identified, including fatigue due to heavy thermal loading from environmental and operating temperature extremes, micrometeoroid and/or depot ancillary equipment impact (this is an important problem due to the large surface area needed to house the large quantities of propellant), docking and maintenance hazards, and hazards associated with extended extravehicular activity. Various safety analysis techniques were presented for each program phase. Specific system safety implementation steps were also listed. Enhanced risk assessment was demonstrated through the incorporation of these methods.

Bahr, Nicholas J.↗

LEO/GSO cyclic depot transfer

This paper investigates the development and use of semi-analytic methods for propellant depot orbit selection in cyclic, coplanar, Keplerian GSO missions. The cyclic depot transfer strategy which allows for non-optimum (e.g. non-Hohmann) transfer, is constrained by resonance requirements allowing for descent rendezvous/refueling with fuel depots positioned during the ascent phase of the mission. The mission benefit using this transfer technique allows an improvement in propulsion system efficiency which can lead to approximately 43 percent reduction in initial launch mass when compared to traditional methods, but with the trade-off of longer mission timelines. A family of potential transfers is identified with an 'optimum' selection not based on conventional delta V minimization. The results of this analysis include reduced transfer times and greater potential initial launch mass savings over previous work.

Coffey, Randall E.↗

Orbiting propellant depot safety. Volume 1: Management summary report

Orbital missions are considered which require the use of orbiting vehicles, e.g., a cislunar shuttle, that is either chemically or nuclear propelled, functioning as orbit-to-orbit shuttles combined with space tugs for servicing earth-orbiting payloads. Such vehicles may be stationed in a low earth orbit from which they would initiate and terminate flights. The flight frequency of these vehicles indicates that large quantities of propellants will have to be delivered to them in orbit. Orbiting propellant depots, in both geocentric and selenocentric orbits, are being considered as candidate methods of making the required propellants readily available. An assessment of the potential safety hazards associated with the operation of such a depot is summarized.

Source record↗

Orbiting propellent depot safety. Volume 2: Technical discussion

The results of a study assessing the gross requirements and concomitant safety hazards associated with the operation of several configurations of orbiting propellant depots (OPD) are presented. The major structural and operational aspects of the integral, semimodular, and modular concepts are described. The concepts are evaluated to determine their safety hazards, and emphasis is placed on propellant transfer to and from the OPD. The study indicates that a modular mode of depot resupply is desirable regardless of the OPD configuration. This resupply mode requires no flow transfer to resupply either the semimodular or modular OPD. Of the three concepts, the semimodular appears to provide the best operational advantage and lowest safety risk.

Source record↗

NASA Shuttle Logistics Depot (NSLD) - The application of ATE

The concept of the NASA Shuttle Logistics Depot (NSLD) developed for the Space Shuttle Orbiter Program is described. The function of the NSLD at Cape Canaveral is to perform the acceptance and diagnostic testing of the Shuttle's space-rated line-replaceable units and shop-replaceable units (SRUs). The NSLD includes a comprehensive electronic automatic test station, program development stations, and assorted manufacturing support equipment (including thermal and vibration test equipment, special test equipment, and a card SRU test system). The depot activities also include the establishment of the functions for manufacturing of mechanical parts, soldering, welding, painting, clean room operation, procurement, and subcontract management.

Simpkins, Lorenz G.↗

A Probabilistic Tool that Aids Logistics Engineers in the Establishment of High Confidence Repair Need-Dates at the NASA Shuttle Logistics Depot

The NASA Shuttle Logistics Depot (NSLD) is tasked with the responsibility for repair and manufacture of Line Replaceable Unit (LRU) hardware and components to support the Space Shuttle Orbiter. Due to shrinking budgets, cost effective repair of LRU's becomes a primary objective. To achieve this objective, is imperative that resources be assigned to those LRU's which have the greatest expectation of being needed as a spare. Forecasting the times at which spares are needed requires consideration of many significant factors including: failure rate, flight rate, spares availability, and desired level of support, among others. This paper summarizes the results of the research and development work that has been accomplished in producing an automated tool that assists in the assignment of effective repair start-times for LRU's at the NSLD. This system, called the Repair Start-time Assessment System (RSAS), uses probabilistic modeling technology to calculate a need date for a repair that considers the current repair pipeline status, as well as, serviceable spares and projections of future demands. The output from the system is a date for beginning the repair that has significantly greater confidence (in the sense that a desired probability of support is ensured) than times produced using other techniques. Since an important output of RSAS is the longest repair turn-around time that will ensure a desired probability of support, RSAS has the potential for being applied to operations at any repair depot where spares are on-hand and repair start-times are of interest. In addition, RSAS incorporates tenants of Just-in-Time (JIT) techniques in that the latest repair start-time (i.e., the latest time at which repair resources must be committed) may be calculated for every failed unit This could reduce the spares inventory for certain items, without significantly increasing the risk of unsatisfied demand.

Bullington, J. V.↗

A-Train Data Depot: Integrating and Visualizing Atmospheric Measurements Along the A-Train Tracks

The succession of US and international satellites that follow each other, seconds to minutes apart, across the local afternoon equator crossing is called the ATrain. The A-Train consists of the following satellites, in order of equator crossing: OCO, EOS Aqua, CloudSat, CALIPSO, PARASOL, and EOS Aura. Flying in such formation increases the number of observations, validates observations, and enables coordination between science observations, resulting in a more complete virtual science platform (Kelly, 2000) The goal of this project is to create the first ever A-Train virtual data portal/center, the A-Train Data Depot, to process, archive, access, visualize, analyze and correlate distributed atmosphere measurements from various A-Train instruments along A-Train tracks. The A-Train Data Depot (ATDD) will enable the free movement of remotely located A-Train data so that they are combined to create a consolidated vertical view of the Earth s Atmosphere along the A-Train tracks. Once the infrastructure of the ATDD is in place, it will be easily evolved to serve data from all A-Train data measurements: one stop shopping. The innovative approach of analyzing and visualizing atmospheric profiles along the platforms track (i.e., time) will be accommodated by reusing the GSFC Atmospheric Composition Data and Information Services Center (ACDISC) visualization and analysis tool, GIOVANNI, existing data reduction tools, on-line archwing for fast data access, and Cooperative Institute for Research in the Atmosphere (CRA) data co-registration tools. Initial measurements utilized include CALIPSO lidar backscatter, CloudSat radar reflectivity, clear air relative humidity, water vapor and temperature from AIRS, and cloud properties and aerosols from both MODIS. This will be followed by associated measurements from MLS, OMI, HIRDLS, and TES. Given the independent nature of instrument/platform development, the ATDD project has been met with many interesting challenges that, once resolved, will provide a much greater understanding of the relative flight dynamics and data co-registration of the suite of A-Train instruments, thus greatly increasing the accuracy of A-Train data analysis. Some of these challenges will be discussed. The project s resulting visualizations and analysis illustrate the importance of managing data so that measurements from various missions can be combined to enhance the understanding of the atmosphere. A-Train data management coordination, as performed here, is extremely significant in facilitating the A-Train science of clouds, precipitation, aerosol and chemistry.

Kempler, Steven↗

Function Point Analysis Depot

The Function Point Analysis (FPA) Depot is a web application originally designed by one of the NE-C3 branch's engineers, Jamie Szafran, and created specifically for the Software Development team of the Launch Control Systems (LCS) project. The application consists of evaluating the work of each developer to be able to get a real estimate of the hours that is going to be assigned to a specific task of development. The Architect Team had made design change requests for the depot to change the schema of the application's information; that information, changed in the database, needed to be changed in the graphical user interface (GUI) (written in Ruby on Rails (RoR and the web service/server side in Java to match the database changes. These changes were made by two interns from NE-C, Ricardo Muniz from NE-C3, who made all the schema changes for the GUI in RoR and Edwin Martinez, from NE-C2, who made all the changes in the Java side.

Muniz, R.↗

Orbital propellant depot system.

Review of some of the problems involved in the design of a long-term propellant storage depot in earth orbit to act as a resupply station for cargo/personnel shuttles between earth orbit and lunar orbit, between low earth orbit and synchronous orbit, and possibly for use with interplanetary probes. The problems discussed pertain essentially to the long-term storage and propellant transfer capabilities.

Wilson, D. J.↗

Orbiting propellant depot safety. Volume 3: Appendices

Appendices to support the findings of the Orbiting Propellant Depot Safety study are presented. The subjects discussed are ullage control subsystems, evaluation of methods, propellant transfer, and baseline subsystem selection.

Source record↗

Food depot: Apollo-Soyuz test project

The Food Depot operations required to produce the ASTP Food System, the food system and some analysis and recommendations related to future operations are described.

Bourland, C. T.↗

The case for a centralized repair depot for Space Shuttle

The first priority of the NSTS program is to make the Space Shuttle system fully operational and cost effective in providing routine access to space. In support of this priority an integrated logistics support system was planned, structured and is being implemented to support a launch-on-time goal of 95 percent. In achieving a 95 percent spares 'fill rate' in an environment of small fleet size, highly unique and high cost assets, significant spares cost can be incurred. A major portion of these costs are for the additional spares required when repair or acquisition times are lengthy. This paper provides a fundamental analysis of the costs and other factors involved in the spare and repair process and provides an optimized cost and process solution for the Space Shuttle program - a centralized repair depot located at KSC.

Enlow, R. D.↗