Search NASASearch

SEARCH · Search NASA

Results for “Design Reference Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Human Health and Performance Aspects of Mars Design Reference Mission of July, 1997

The human element is the most complex element of the mission design Mars missions will pose significant physiological and psychological challenges to crew members Some challenges (human engineering, life support) must be overcome (potential "non-starters") Some challenges (bone, radiation) may be show-stoppers ISS will only Indirectly address Mars questions before any "Go/No Go" decision Significant amount of ground-based and specialized flight research will be required -- Critical Path Roadmap project will direct HSLSPO's research toward Mars exploration objectives

Charles, John B.

Design Reference Mission Development for Nuclear Thermal Propulsion Enabled Science Missions

Nuclear thermal propulsion (NTP) presents a distinct alternative in the advanced propulsion landscape, providing “medium” efficiencies relative to the “high” efficiency of electric propulsion and the “low” efficiency of chemical propulsion. In exchange for this medium efficiency, NTP provides high acceleration, enabling much shorter operating times than the higher efficiency alternatives, often resulting in shorter trip times. This compromise has led to NTP’s frequent consideration in human missions, where crew health and logistics benefit significantly from the schedule advantages provided by NTP. However, the logistics and timeliness of science return from science missions also potentially stand to benefit from reduced schedules, as many of the high energy missions exceed a decade in trip time. Presented here are the results of analysis looking at three missions: A mission to Neptune’s moon, Triton, a solar polar orbiter, and a mission to interstellar space. Comparisons to results found in literature for conventional, and future propulsion technologies are presented.

Stephen Edwards

Dynamic Radioisotope Power System (DRPS) Design Reference Mission (DRM) Lunar Rover

The Radioisotope Power Systems (RPS) Program tasked the Compass Team to evaluate use of Dynamic Radioisotope Power Systems (DRPS) for lunar science rovers. The object was to identify their advantages and challenges as well as to influence the technology developments with flight-type requirements. This was easily done by using the promising Volatiles Investigating Polar Exploration Rover (VIPER) solar- powered rover mission as a platform to ‘swap in’ a DRPS. The ‘pickup truck bed’ approach allowed both simplified installation and operation of the DRPS while keeping the forward lunar surface ‘blocked’ from the DRPS waste heat which could sublimate the icy surface. It was found that with the Stirling DRPS option the mass is within the planned VIPER lander capability and is very close to VIPER mass and size (the DRPS replaces large battery pack/solar arrays). The Stirling DRPS option produced ~300 Watts electrical (We) using six general purpose heat source (GPHS) bricks and eight Stirling convertors. Replacing the solar/battery power with radioisotope power allows a continuous presence (instead of 6 hours) in a permanently shadowed region (PSR) and over 18 months of operations with minimal science impact (rearward surface heating). It was also found that use of a dynamic system (instead of a thermoelectric system) reduces the heat impact on the science environment two-to-three times. The DRPS, along with a relay link (like Gateway), can provide continuous access to PSRs. The system was also found to be capable of roving for 8 hours per day with a range of over 500 km in 18 months. Preliminary cost estimates fit into a Class D mission but only assuming VIPER heritage and launch, lander, operations, nuclear specific costs [National Environmental Policy Act (NEPA), fueling, transport, Launch Services Program (LSP), etc.] and DRPS are not included.

DRPS

Tsunami Early-Warning CubeSat Design Reference Mission (DRM)

Global constellation for near real-time detection, characterization, and warning of dangerous tsunami; detection and evaluation of large earthquakes and volcanic eruptions; and study and continuous monitoring of the ionosphere and climate change.

Tsunami, GNSS-R, CubeSats, Ionosphere, Climate Cha

Spacecraft and mission design for the SpaceNuclear PowerSystem Reference Mission

The design and performance of a spacecraft employing arcjet nuclear electric propulsion, suitable for use in the Space Nuclear Power System Reference Mission, are outlined. The vehicle design is based on a 92 kW ammonia arcjet system operating at an I(sp) of 1050 s and an efficiency of 45 percent. The arcjet/gimbal system, power processing unit, and propellant feed-system are described. A 100 kW(e) space nuclear power system is assumed and the spacecraft mass is baselined at 5250 kg excluding the propellant, propellent feed system, and integrated chemical boost engine. A radiation/arcjet efflux diagnostics package is included in the performance analysis. Three mission scenarios are described and are capable of demonstrating the full capability of the space nuclear power source. The missions considered include power system deployment to possible SDI platform orbits and a spacecraft storage mission to an orbit of three times geosynchronous (GEO) with return to GEO corresponding to Delta V's between 7400 m/s, and 7900 m/s. This spacecraft meets the Reference Mission constraint of low developmental risk and is scaleable to power levels projected for future space platforms.

Deininger, William D.

SolSTUS: Solar Source Thermal Upper Stage

This paper was written by members of the Utah State University (USU) Space Systems Design class, fall quarter 1993. The class is funded by NASA and administered by the University Space Research Association (USRA). The focus of the class is to give students some experience in design of space systems and as a source of original ideas for NASA. This paper is a summary of the work done by members of the Space Systems Design class during the opening phase of the course. The class was divided into groups to work on different areas of the Solar Thermal Rocket (STR) booster in order to produce a design reference mission that would identify the key design issues. The design reference mission focused upon a small satellite mission to Mars. There are several critical components in a Solar Thermal Rocket. STR's produce a very low thrust, but have a high specific impulse, meaning that they take longer to reach the desired orbit, but use a lot less fuel in doing it. The complexity of the rocket is discussed in this paper. Some of the more critical design problems discussed are: (1) the structural and optical complexity of collecting and focusing sunlight onto a specific point, (2) long term storage of fuel (liquid hydrogen), (3) attitude control while thrusting in an elliptical orbit and orienting the mirrors to collect sunlight, and (4) power and communications for the rocket and it's internal systems. The design reference mission discussed here is a very general mission to Mars. A first order trajectory design has been done and a possible basic science payload for Mars has been suggested. This paper summarizes the design reference mission (DRM) formulated by the USU students during fall quarter and identifies major design challenges that will confront the design team during the next two quarters here at USU.

Source record

Surface Nuclear Power for Human Mars Missions

The Design Reference Mission for NASA's human mission to Mars indicates the desire for in-situ propellant production and bio-regenerative life systems to ease Earth launch requirements. These operations, combined with crew habitation and science, result in surface power requirements approaching 160 kilowatts. The power system, delivered on an early cargo mission, must be deployed and operational prior to crew departure from Earth. The most mass efficient means of satisfying these requirements is through the use of nuclear power. Studies have been performed to identify a potential system concept using a mobile cart to transport the power system away from the Mars lander and provide adequate separation between the reactor and crew. The studies included an assessment of reactor and power conversion technology options, selection of system and component redundancy, determination of optimum separation distance, and system performance sensitivity to some key operating parameters. The resulting system satisfies the key mission requirements including autonomous deployment, high reliability, and cost effectiveness at a overall system mass of 12 tonnes and a stowed volume of about 63 cu m.

Mason, Lee S.

The Role of Cis-Lunar Space in Future Global Space Exploration

Cis-lunar space offers affordable near-term opportunities to help pave the way for future global human exploration of deep space, acting as a bridge between present missions and future deep space missions. While missions in cis-lunar space have value unto themselves, they can also play an important role in enabling and reducing risk for future human missions to the Moon, Near-Earth Asteroids (NEAs), Mars, and other deep space destinations. The Cis-Lunar Destination Team of NASA's Human Spaceflight Architecture Team (HAT) has been analyzing cis-lunar destination activities and developing notional missions (or "destination Design Reference Missions" [DRMs]) for cis-lunar locations to inform roadmap and architecture development, transportation and destination elements definition, operations, and strategic knowledge gaps. The cis-lunar domain is defined as that area of deep space under the gravitational influence of the earth-moon system. This includes a set of earth-centered orbital locations in low earth orbit (LEO), geosynchronous earth orbit (GEO), highly elliptical and high earth orbits (HEO), earth-moon libration or "Lagrange" points (E-ML1 through E-ML5, and in particular, E-ML1 and E-ML2), and low lunar orbit (LLO). To help explore this large possibility space, we developed a set of high level cis-lunar mission concepts in the form of a large mission tree, defined primarily by mission duration, pre-deployment, type of mission, and location. The mission tree has provided an overall analytical context and has helped in developing more detailed design reference missions that are then intended to inform capabilities, operations, and architectures. With the mission tree as context, we will describe two destination DRMs to LEO and GEO, based on present human space exploration architectural considerations, as well as our recent work on defining mission activities that could be conducted with an EML1 or EML2 facility, the latter of which will be an emphasis of this paper, motivated in part by recent interest expressed at the Global Exploration Roadmap Stakeholder meeting. This paper will also explore the links between this HAT Cis-Lunar Destination Team analysis and the recently released ISECG Global Exploration Roadmap and other potential international considerations, such as preventing harmful interference to radio astronomy observations in the shielded zone of the moon.

Bobskill, Marianne R.

Mars rover/sample return mission requirements affecting space station

The possible interfaces between the Space Station and the Mars Rover/Sample Return (MRSR) mission are defined. In order to constrain the scope of the report a series of seven design reference missions divided into three major types were assumed. These missions were defined to span the probable range of Space Station-MRSR interactions. The options were reduced, the MRSR sample handling requirements and baseline assumptions about the MRSR hardware and the key design features and requirements of the Space Station are summarized. Only the aspects of the design reference missions necessary to define the interfaces, hooks and scars, and other provisions on the Space Station are considered. An analysis of each of the three major design reference missions, is reported, presenting conceptual designs of key hardware to be mounted on the Space Station, a definition of weights, interfaces, and required hooks and scars.

Source record

Evaluation of Human and AutomationRobotics Integration Needs for Future Human Exploration Missions

NASA employs Design Reference Missions (DRMs) to define potential architectures for future human exploration missions to deep space, the Moon, and Mars. While DRMs to these destinations share some components, each mission has different needs. This paper focuses on the human and automation/robotic integration needs for these future missions, evaluating them with respect to NASA research gaps in the area of space human factors engineering. The outcomes of our assessment is a human and automation/robotic (HAR) task list for each of the four DRMs that we reviewed (i.e., Deep Space Sortie, Lunar Visit/Habitation, Deep Space Habitation, and Planetary), a list of common critical HAR factors that drive HAR design.

design reference missions

Issues and Design Drivers for Deep Space Habitats

A cross-disciplinary team of scientists and engineers applied expertise gained in Lunar Lander development to the conceptual design of a long-duration, deep space habitat for Near Earth Asteroid (NEA) missions. The design reference mission involved two launches to assemble 5-modules for a 380-day round trip mission carrying 4 crew members. The conceptual design process yielded a number of interesting debates, some of which could be significant design drivers in a detailed Deep Space Habitat (DSH) design. These issues included: Design to minimize crew radiation exposure, launch loads, communications challenges, docking system and hatch commonality, pointing and visibility, consumables, and design for contingency operations.

Rucker, Michelle A.

Issues and Design Drivers for Deep Space Habitats

A cross-disciplinary team of scientists and engineers applied expertise gained in Lunar Lander development to the conceptual design of a long-duration, deep space habitat for Near Earth Asteroid (NEA) missions. The design reference mission involved two launches to assemble a 5-module vehicle for a 380-day round trip mission carrying 4 crew members. The conceptual design process yielded a number of interesting debates, some of which could be significant design drivers in a detailed Deep Space Habitat (DSH) design. These issues include: a) Launch loads: Potentially drives layout of equipment mounted to module floors or walls, and whether temporary internal structure is required to distribute launch loads to minimize shell mass; b) Unmanned loiter time: When added to an already lengthy mission, loiter time further drives risk and reliability, and poses issues for equipment shelf life such as material degradation or cryogenic fluids boil-off; c) Pointing and Visibility: A habitat embedded in a 5-module stack may drive Communications, Tracking, Guidance, and Navigation equipment out onto long booms to maintain line-of-sight visibility with targets. However, long booms will be more susceptible to disruption from exercise-induced vibration, potential damage during docking/undocking operations, and increased power distribution mass; d) Water: although it is assumed that a water processor will collect and recycle water, several interesting question were posed, such as: How much water to start with? Should potable water serve double-duty as radiation protection? And if so, should it be stowed in a single large tank, or smaller, portable containers? e) Design for repairability: one of the worst-case scenarios identified was a cabin depressurization that required suited repair from inside the module, potentially driving the need for long umbilical hoses or special equipment to allow smaller, mated modules to be used as safe havens for up to 180 days;

Anderson, Molly S.

Wide-Field InfraRed Survey Telescope WFIRST

In December 2010, NASA created a Science Definition Team (SDT) for WFIRST, the Wide Field Infra-Red Survey Telescope, recommended by the Astro 2010 Decadal Survey as the highest priority for a large space mission. The SDT was chartered to work with the WFIRST Project Office at GSFC and the Program Office at JPL to produce a Design Reference Mission (DRM) for WFIRST. Part of the original charge was to produce an interim design reference mission by mid-2011. That document was delivered to NASA and widely circulated within the astronomical community. In late 2011 the Astrophysics Division augmented its original charge, asking for two design reference missions. The first of these, DRM1, was to be a finalized version of the interim DRM, reducing overall mission costs where possible. The second of these, DRM2, was to identify and eliminate capabilities that overlapped with those of NASA's James Webb Space Telescope (henceforth JWST), ESA's Euclid mission, and the NSF's ground-based Large Synoptic Survey Telescope (henceforth LSST), and again to reduce overall mission cost, while staying faithful to NWNH. This report presents both DRM1 and DRM2.

Green, J.