Performance of the Fermilab Linac Injector

The Fermilab Linac injection line consists of a 35 keV magnetron-type H\textsuperscript{-} ion source, two-solenoid Low Energy Beam Transport (LEBT), 201 MHz 4-rod 750 keV Radio Frequency Quadrupole (RFQ), and a Medium Energy Transport (MEBT) containing 4 quadrupoles and a bunching cavity. The injector delivers 25 mA, 48 µs pulses to the drift-tube Linac at a repetition rate of 15Hz. The transmission efficiency of the injector has been lower than expected since commissioning. Recent beam current measurements suggest that the beam is primarily lost upstream of the RFQ exit. Numerical simulations indicate that ions passing through the non-linear field region of the solenoids could produce a beam with an increased emittance resulting in up to 50\% of the LEBT beam current failing to meet the RFQ acceptance. An aperture restriction was installed upstream of the first solenoid to remove these ions. This report describes the results of measurements and simulations as well as the LEBT tuning.

43 PARTICLE ACCELERATORS↗

Preliminary Look at the LBEG & MPEG Beam Transmissions between HPSim and Operation Data

This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.

43 PARTICLE ACCELERATORS↗

Multi-beam operation of LANSCE accelerator facility

The Los Alamos Neutron Science Center (LANSCE) accelerator facility has been in operation for 50 years performing important scientific support for national security. The unique feature of the LANSCE accelerator facility is multi-beam operation, delivering beams to five experimental areas. The near-term plans are to replace obsolete and almost end-of-life systems of the LANSCE linear accelerator with a modern 100-MeV Front End with significant improvement in beam quality. This paper summarizes experimental results obtained during the operation of the LANSCE accelerator facility and considers plans to expand the performance of the accelerator for near- and long-term operations.

47 OTHER INSTRUMENTATION↗

Mitigation of Beam Losses in LANSCE Linear Accelerator

Suppression of beam losses is essential for successful operation of high-intensity accelerator facility. The LANSCE accelerator started routine operation in 1972 as a 0.8 MW average proton beam power facility for meson physics research, and delivered highpower beam for a quarter century. The accelerator currently delivers 100 MeV proton beam to Isotope Production Facility (IPF) and 800 MeV H- beams to various experimental areas. The accelerator is equipped with two independent injectors for H + and H - beams, merging at the entrance of a 201.25 MHz Drift Tube Linac (DTL). The DTL performs acceleration up to the energy of 100 MeV. After the DTL, the Transition Region beamline directs a 100 MeV proton beam to the Isotope Production Facility, while the H - beam is accelerated up to the final energy of 800 MeV in an 805- MHz Coupled Cavity Linac. The H - beams, created with different time structure by a lowenergy chopper, are distributed in the Switch Yard (SY) to four experimental areas: the Lujan Neutron Scattering Center equipped with a Proton Storage Ring (PSR), the Weapons Neutron Research facility (WNR), the Proton Radiography facility (pRad), and the Ultra-Cold Neutron facility (UCN). Multi-beam operation requires careful control of accelerator tune to minimize beam losses. In this paper we review main effects affecting beam losses in LANSCE linear accelerator and discuss methods to reduce them.

43 PARTICLE ACCELERATORS↗

Delivery of H - / H + Beams to Area A

We explore the relative merits of transporting the beam from the H + ion source and from the H - ion source to Area-A for low current applications. Transporting the H - beam to Area-A using the laser neutralization approach has some risk associated with it and will require some development. Alternative method of delivering H - beam to Area-A includes replacing LDBM00 bending magnet with kicker for sharing beam between Line D and modified Line A. Transporting the H + beam to Area-A will have significant impact on the operation the IPF facility and maintaining high pulse rate to IPF will require major modifications to the transition region of the accelerator and Drift Tube Linac.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Ion Beam Propagation Through the FNAL LEBT

The Fermilab 750keV injector sends 25mA H- beam for 30µs at a rep-rate of 15Hz. The beam transmission through the FNAL injector is currently less than 50% from the ion source to the entrance of the drift tube linac. Recently it was uncovered that the primary loss point is within the region prior to the RFQ which houses the solenoid focal elements that match the beam to the RFQ. Recent diagnostic measurements indicate that the cause of the transmission efficiency could be the non-linear effects of the solenoid elements on the beam. An aperture restriction was placed just upstream of the first solenoid element to restrict the beam size and reduce the non-linear effects of the solenoid element.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

LAMP Low-Energy Region Options: Workshop Report and Ranking Assessment

The LANSCE accelerator complex at Los Alamos National Laboratory provides beam to five user facilities: IPF, pRad, UCN, WNR and the Lujan Center. Each user facility receives a beam tailored to its specific requirements, including species (H+ or H- ) and beam pulse format. The capabilities and beam requirements of the LANSCE user facilities are documented elsewhere. The core components of the LANSCE accelerator complex – the beam source area, drift-tube and cavity-coupled linear accelerators – are more than 50 years old; a critical subsystem for beam delivery to the Lujan Center, the proton storage ring (PSR), is approximately 40 years old, with its last major refresh being completed in the late 1990s. The LAMP project is intended to begin a revitalization and update of the LANSCE accelerator complex, starting with the beam source region, drift-tube linac, and PSR.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

MEBT Bunchers: System Design Document (SDD)

The LAMP Medium Energy Beam Transport (MEBT) transfers bunched beam at the energy 3 MeV from RFQ to the Drift-Tube Linac (DTL) entrance. The beam particles (protons or H- ) in the LAMP MEBT have velocity β = v/c = 0.08, where v is the beam velocity, c is the speed of light. The MEBT bunchers keep beam bunches from spreading longitudinally as they propagate through the MEBT, where some unwanted bunches are removed by a chopper to create a required beam pattern. The MEBT bunchers are RF cavities operating at the frequency 201.25 MHz; possible design options were considered in.

43 PARTICLE ACCELERATORS↗

MEBT Chopper System: System Design Document (SDD)

The Medium Energy Beam Transport (MEBT) chopper removes unwanted beam bunches by deflecting them to a target from a bunched beam transported through the MEBT from RFQ to the Drift-Tube Linac (DTL) entrance. The unchopped bunches propagate through the MEBT to DTL, while the deflected bunches are deposited on a target downstream of chopper. The chopper system consists of a deflecting structure, where the beam-deflecting fields are created, and a pulse generator (pulser) that feeds this structure with voltage pulses having the required time pattern. Ideally, the system should turn deflection on and off in the time interval between the bunches to prevent partially chopped / deflected bunches. This usually requires traveling slow-wave chopper structures where the field propagates with the same velocity as the beam, as illustrated in Fig. 1.

43 PARTICLE ACCELERATORS↗

Record of Decision: MEBT Energy Change

The LAMP Conceptual Design (LCD), as described in the LAMP Conceptual Design Report incorporates a radiofrequency quadrupole (RFQ) with an output beam energy of 3.0-MeV; the medium energy beam transport line (MEBT) transports beam from the end of the RFQ into the first LAMP drift tube linac (DTL) tank. The MEBT contains components, such as rebunchers and beam choppers, designed for the specific output energy of the RFQ, and the DTL tank is designed to accept this beam energy.

43 PARTICLE ACCELERATORS↗

High-Power Amplifier Considerations for testing the LAMP RFQ and first DTL Cavity

As part of the LANSCE Accelerator Modernization Pro ject (LAMP), critical portions of the proposed accelerator will be tested as proof of concept and aid in planning the installation of LAMP at Los Alamos Neutron Science Cen ter. As part of this demonstration, the radio frequency quadrupole (RFQ) and the first drift-tube linac (DTL) cav ity will be tested with beam. For this purpose, high-power RF amplifiers are being designed to meet the testing de mands. This is a description of the requirements of these amplifiers and how the design is intended to meet them.

42 ENGINEERING↗

Configuration Management Plan

The Los Alamos Neutron Science Center (LANSCE) is located at Technical Area 53 (TA-53) at Los Alamos National Laboratory (LANL) in Los Alamos, New Mexico. LANSCE is driven by an 800 megaelectronvolt (MeV) proton accelerator that delivered its first beam in 1972. The LANSCE accelerator is unique in that it accelerates both H– (to full energy of 800 MeV) and H+ ions (up to 100 MeV currently but has accelerated high-power H+ beam to 800 MeV in the past) and supports five separate experimental areas that operate simultaneously, with each having different timing and beam current requirements. Many of the LANSCE accelerator front-end components date back to original commissioning in 1972, including the ion sources, Cockcroft-Walton (CW) generators, and the Drift Tube LINAC (DTL), which accelerates the beam up to 100 MeV.

43 PARTICLE ACCELERATORS↗

Beam Loss Assessment Through Use of Photomultiplier Tubes

Modern accelerators aim to deliver maximal beam current at stable energy with minimal beam loss. Environmental changes, among other factors, can result in increased beam loss and decreased beam throughput, prompting daily retuning of the accelerator. The compact nature of the oldest part of the linear accelerator limits the available beam instrumentation, making beam loss assessment and tuning difficult. Thus, additional devices for beam loss monitoring must be considered. Photomultiplier tube-based beam loss monitors (BLMs) were installed along the Fermilab drift tube Linac to assess beam loss. Due to noise, the data from the installed photomultiplier tubes was difficult to assess. After noise reduction and signal analysis, it was found that the signals produced by the photomultiplier tubes in response to beam loss were consistent for a given configuration and therefore a reasonable measure of beam loss. This project lays groundwork for future work in beam loss assessment using photomultiplier tubes, with the automation of the process developed in this project being the next step in this effort.

Waggoner, Alexander↗

Test cavity and Iris-to-Coax transition for tuning and high-power verification of SNS DTL iris couplers

The Spallation Neutron Source (SNS) Drift Tube Linac (DTL) employs iris couplers to efficiently deliver RF power into the accelerating structure. To support the development, tuning, and high‑power conditioning of these couplers prior to installation in the actual DTLs, a dedicated test cavity and an iris‑to‑coaxial transition structure have been designed. This work presents the electromagnetic design, simulation, and optimization of the test setup, enabling precise characterization of the iris coupler’s performance. The transition structure allows for tuning of the iris opening dimensions without requiring a waveguide taper or full‑size waveguide transitions, while maintaining impedance matching between the coaxial feed and the iris geometry to minimize reflection and power loss. During low‑power tests, the iris opening di-mensions can be evaluated using the iris‑to‑coax transi-tion attached to the test cavity. For high‑power condi-tioning, full‑size waveguides with ceramic vacuum win-dows are connected to the test cavity to replicate opera-tional conditions. Key design parameters were optimized using computer-aided simulation, and sensitivity studies were conducted to assess the impact of mechanical toler-ances on RF performance. The resulting test platform provides a reliable and efficient means for tuning and validating iris couplers, contributing to improved opera-tional stability in the SNS DTL.

Lee, Sung-Woo [ORNL] (ORCID:000000030915835X)↗

Write-up on the analytical formalism for DTL Synchrotron and Betatron frequencies estimates

Appendix A contains tables of the DTL tanks geometry, generated using PARMILA code with input parameters of initial and final energy, accelerating gradient, synchronouse phase, and using DTLfish code (part of the SUPERFISH/POISSON package of codes). Details of the design and generation od the DTL geometry will be presented in a separate report. After generation of the DTL geometry and initial beam dynamics simulations, the analytic estimates of the synchrotron and betatron oscillations, as well as presence of the parametric resonance of first order were done. In present report the analytic background of those estimates, as well as the results of these are presented.

43 PARTICLE ACCELERATORS↗