Search NASA⌕ Search

SEARCH · Search NASA

Results for “EDISON”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Edison Demonstration of Smallsat Networks

The goal of NASA's Edison Demonstration of Smallsat Networks (EDSN) mission is to demonstrate interactive satellite swarms capable of collecting, exchanging and transmitting multi-point scientific measurements. Satellite swarms enable a wide array of scientific, commercial and academic research not achievable with a single satellite. The EDSN satellites are scheduled to be launched into space as secondary payloads on the first flight of the Super Strypi launch vehicle no earlier than Oct. 29, 2015.

SmallSat Networks↗

Commonwealth Edison (ComEd) Chicago Best Practices: Energy Data Accelerator

This case study describes how Commonwealth Edison (ComEd) and the city of Chicago worked together to develop a way for commercial building owners to get access to whole-building energy data more efficiently. This would enable building owners to comply with local energy benchmarking ordinances.

local government, utility, energy data, data acces↗

Exploring New Models for Utility Distributed Energy Resource Planning and Integration: SMUD and Con Edison

As a result of the rapid growth of renewable energy in the United States, the U.S. electric grid is undergoing a monumental shift away from its historical status quo. These changes are occurring at both the centralized and local levels and have been driven by a number of different factors, including large declines in renewable energy costs, federal and state incentives and mandates, and advances in the underlying technology. Higher levels of variable-generation renewable energy, however, may require new and increasingly complex methods for utilities to operate and maintain the grid while also attempting to limit the costly build-out of supporting grid infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Southern California Edison Grid Integration Evaluation: Cooperative Research and Development Final Report, CRADA Number CRD-10-376

The objective of this project is to use field verification to improve DOE’s ability to model and understand the impacts of, as well as develop solutions for, high penetration PV deployments in electrical utility distribution systems. The Participant will work with NREL to assess the existing distribution system at SCE facilities and assess adding additional PV systems into the electric power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Battery Performance, Thermal, and Life Modeling for Southern California Edison (Cooperative Research and Development Final Report)

The objective of this project is to develop battery performance models, thermal models and life models for SCE to use in simulation and analysis of grid services involving energy storage. NREL will fit the models to three separate chemistries using test data provided by SCE. The dataset for each chemistry will include electrical, thermal and aging response to different temperatures and cycling conditions, measured under a variety of cell-level and module-level experiments described in SCE test protocol documents. Once tuned to a test dataset, the battery system model software will provide predictions of battery energy and power loss, and thus cycle and calendar life, for any energy storage grid service power profile of interest to SCE. The automated battery life modeling and simulation tool can also be applied to any other grid battery systems as long as necessary input data is available to accelerate battery model development and battery lifetime analysis.

25 ENERGY STORAGE↗

Edison and radiatively-cooled IR space observatories

Radiative cooling of IR space telescopes is an alternative to embedding within massive cryostats and should offer advantages for future missions, including longer life, larger aperture for a fixed spacecraft size, lower cost due to less complex engineering, and easier ground handling. Relatively simple analyses of conventional designs show that it is possible to achieve telescope temperatures in the range of 25 to 40 K at distances from the sun of about 1 AU. Lower temperatures may be possible with 'open' designs or distant orbits. At approximately 25 K, an observatory will be limited by the celestial thermal background in the near- and mid-IR and by the confusion limit in the far-IR. We outline here our concept for a moderate aperture (approximately 1.75 m; Ariane 4 or Atlas launch) international space observatory for the next decade.

Thronson, H. A.↗

Long Fuse, Big Bang: Thomas Edison, Electricity, and the Locus of Innovation

Calls for breakthroughs in science and technology have never been louder, and yet the demand for innovation is made more challenging by public and political misconceptions surrounding where, when, and how it happens. Professor Andrew Hargadon uses historical research to advance our current understanding of the innovation process. He discussed the social and technical context in which electric light, and the modern electric power infrastructure, were born and considers its implications for managing innovation in science and technology today.

99 GENERAL AND MISCELLANEOUS↗

Secure Interoperable Open Smart Grid Demonstration Project

The Consolidated Edison, Inc., of New York (Con Edison) Secure Interoperable Open Smart Grid Demonstration Project (SGDP), sponsored by the United States (US) Department of Energy (DOE), demonstrated that the reliability, efficiency, and flexibility of the grid can be improved through a combination of enhanced monitoring and control capabilities using systems and resources that interoperate within a secure services framework. The project demonstrated the capability to shift, balance, and reduce load where and when needed in response to system contingencies or emergencies by leveraging controllable field assets. The range of field assets includes curtailable customer loads, distributed generation (DG), battery storage, electric vehicle (EV) charging stations, building management systems (BMS), home area networks (HANs), high-voltage monitoring, and advanced metering infrastructure (AMI). The SGDP enables the seamless integration and control of these field assets through a common, cyber-secure, interoperable control platform, which integrates a number of existing legacy control and data systems, as well as new smart grid (SG) systems and applications. By integrating advanced technologies for monitoring and control, the SGDP helps target and reduce peak load growth, improves the reliability and efficiency of Con Edison’s grid, and increases the ability to accommodate the growing use of distributed resources. Con Edison is dedicated to lowering costs, improving reliability and customer service, and reducing its impact on the environment for its customers. These objectives also align with the policy objectives of New York State as a whole. To help meet these objectives, Con Edison’s long-term vision for the distribution grid relies on the successful integration and control of a growing penetration of distributed resources, including demand response (DR) resources, battery storage units, and DG. For example, Con Edison is expecting significant long-term growth of DG. The SGDP enables the efficient, flexible integration of these disparate resources and lays the architectural foundations for future scalability. Con Edison assembled an SGDP team of more than 16 different project partners, including technology vendors, and participating organizations, and the Con Edison team provided overall guidance and project management. Project team members are listed in Table 1-1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Interconnecting PV on New York City's Secondary Network Distribution System

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to networks in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1 -- PV Deployment Analysis for New York City -- we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2. A Briefing for Policy Makers on Connecting PV to a Network Grid presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3. Technical Review of Concerns and Solutions to PV Interconnection in New York City summarizes common concerns of utility engineers and network experts about interconnecting PV systems to secondary networks. This section also contains detailed descriptions of nine solutions, including advantages and disadvantages, potential impacts, and road maps for deployment. Section 4. Utility Application Process Review -- looks at utility interconnection application processes across the country and identifies administrative best practices for efficient PV interconnection.

14 SOLAR ENERGY↗

Utility experience with two demonstration wind turbine generators

Edison has committed 360 MW of nameplate generating capacity to wind energy by year 1990 in its long-range generation plan. To reach this goal the Company's wind energy program focuses on three areas: the continuous evaluation of the wind resource, the hands-on demonstration of wind turbine generators (WTG) and an association with wind park developers. Two demonstration WTGs have been installed and operated at Edison's Wind Energy Center near Palm Springs, California: a 3 MW horizontal axis Bendix/Schachle WTG and a 500 kW vertical axis Alcoa WTG. They are part of a one to two year test program during which the performance of the WTGs will be evaluated, their system operation and environmental impact will be assessed and the design criteria of future WTGs will be identified. Edison's experience with these two WTGs is summarized and the problems encountered with the operation of the two machines are discussed.

Wehrey, M. C.↗

Alternating Direct Current (ADC) - A New Form of Efficient Energy Transmission for Renewable Sources

The prevailing means of electricity transmission through Direct Current (DC) and Alternating Current (AC) have limitations with the ongoing transition to renewable energy sources. In this paper, we discuss a new form of energy transmission, known as alternating direct current (ADC) that would provide significant savings in energy consumption and simultaneously allow efficient utilization of generated energy from renewable sources. This has become possible due to substantial advances in electronics and optoelectronics technologies since the days of Nicholas Tesla and Thomas Edison. Recent efforts of implementing the proposed ADC technology in relevant environments have demonstrated significant energy savings and opened a new paradigm that has the potential to provide an efficient and cost-effective pathway for transition to renewable energy sources even with the existing grid infrastructure. The DC power utilization initiated by Thomas Edison can be stored in battery arrangement but suffers from line loss and hence is not efficient for long-distance transmission. However, AC power developed by Nicholas Tesla cannot be stored efficiently but can be transmitted over long distances due to significantly lower line losses. Currently, AC power is the global foundational energy transmission methodology used because of events that took place over 135 years ago involving Edison, Tesla, and Westinghouse, and since AC power can transmit long distances from power plants to end users efficiently and economically. Approximately 50 years ago, the introduction of semiconductors in commercialized electronic devices and products changed the way people consume electricity. Also, over the years, the expanding adaptation of nonlinear loads has adversely affected the grid stability and hence the utility infrastructures worldwide.

AC↗

Towards understanding HPC users and systems: A NERSC case study

High performance computing (HPC) scheduling landscape currently faces new challenges due to thechanges in the workload. Previously, HPC centers were dominated by tightly coupled MPI jobs. HPCworkloads increasingly include high-throughput, data-intensive, and stream-processing applications. Asa consequence, workloads are becoming more diverse at both application and job levels, posing newchallenges to classical HPC schedulers. There is a need to understand the current HPC workloads andtheir evolution to facilitate informed future scheduling research and enable efficient scheduling in futureHPC systems.In this paper, we present a methodology to characterize workloads and assess their heterogeneity,at a particular time period and its evolution over time. We apply this methodology to the workloads ofthree systems (Hopper, Edison, and Carver) at the National Energy Research Scientific Computing Center(NERSC). We present the resulting characterization of jobs, queues, heterogeneity, and performance thatincludes detailed information of a year of workload (2014) and evolution through the systems’ lifetime(2010–2014).

Rodrigo, Gonzalo P.↗