Search NASA⌕ Search

SEARCH · Search NASA

Results for “EQuiP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Feasibility study of common electronic equipment for shuttle sortie experiment payloads

A study was conducted to determine the feasibility of using standardized electronic equipment on the space shuttle vehicle in an effort to reduce the cost estimates. The standards for Nuclear Instrument Modules (NIM) and CAMAC electronic equipment are presented and described. It was determined that the CAMAC electronic equipment was more suitable for use with the space shuttle systems. Specific applications of the CAMAC equipment are analyzed. Illustrations of the equipment and circuit diagrams of the subsystems are provided.

Source record↗

Apollo experience report: Ground-support equipment

The experience gained in management of the ground-support-equipment and site-readiness activity for the Apollo Program is summarized. The design of equipment and facilities are examined as well as some operational aspects. The organization for ensuring site readiness and the maintenance of ground-support equipment are discussed. Recommendations for use in future programs are given in the areas of design considerations, cleanliness requirements, periodic evaluation of changing requirements, maintenance and overhaul, special test equipment, site-activation schedule coordination, and schematics for ground-support equipment.

Cooper, J. S.↗

Analysis of commercial equipment and instrumentation for Spacelab payloads. Volume 3: Design analysis and trade studies

A detailed analysis is presented of each selected equipment item, and suitability and cost analyses were documented by equipment item. Tradeoffs of alternative specification requirements are presented which include possible relaxation of vibration, material control, fungus and corrosion requirements for experiment equipment. An additional tradeoff was performed to determine whether it is cost effective to modify experiment equipment to be compatible with a 28-volt dc power source rather than the conventional 110-volt ac source. Programmatic analysis data are given which were used as the basis for the extension of results from the analyses of specific equipment items to the entire spacelab experiment program.

Source record↗

A cost and utility analysis of NIM/CAMAC standards and equipment for shuttle payload data acquisition and control systems. Volume 1: Summary

The cost effectiveness of utilizing the Nuclear Instrumentation Modular (NIM) and the Computer Automated Measurement Control (CAMAC) equipment for Spacelab payload instrumentation was determined. Representative shuttle sortie payloads were analyzed for applicability and commonality. Modification of NIM/CAMAC equipment was analyzed for its suitability in Spacelab environments and to determine the cost. NIM/CAMAC equipment usage requirements for Spacelab payloads were converted to pool size requirements and time-phased equipment procurement requirements. A programmatic estimate of the pool equipment costs and a management plan were prepared for the pool concept. The implementation and impact of CAMAC software were assessed.

Source record↗

Satellite services system analysis study. Volume 4: Service equipment concepts

Payload deployment equipment is discussed, including payload separation, retention structures, the remote manipulator system, tilt tables, the payload installation and deployment aid, the handling and positioning aid, and spin tables. Close proximity retrieval, and on-orbit servicing equipment is discussed. Backup and contingency equipment is also discussed. Delivery and retrieval of high-energy payloads are considered. Earth return equipment, the aft flight deck, optional, and advanced equipment are also discussed.

Source record↗

Development of Turbulence-Measuring Equipment

Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

Kovasznay, Leslie S G↗

Verification of force and acceleration specifications for random vibration tests of Cassini spacecraft equipment

The use of force limiting in the random vibration testing of the Cassini spacecraft's subsystems is reported on. A verification of the Cassini equipment random vibration test acceleration and force specifications is provided by interface acceleration and force data measured in acoustic tests of the Cassini spacecraft development test model (DTM). Acoustic tests were performed on the DTM structure with different structural and equipment configurations. The acceleration and force spectra at the interface between the equipment items and the spacecraft DTM structure were measured in the acoustic tests and compared with the equipment random vibration test specifications. The spacecraft's apparent masses were measured at the equipment mounting points and used in force limit predictions.

Chang, Kurng Y.↗

A Study of Parallels Between Antarctica South Pole Traverse Equipment and Lunar/Mars Surface Systems

The parallels between an actual Antarctica South Pole re-supply traverse conducted by the National Science Foundation (NSF) Office of Polar Programs in 2009 have been studied with respect to the latest mission architecture concepts being generated by the United States National Aeronautics and Space Administration (NASA) for lunar and Mars surface systems scenarios. The challenges faced by both endeavors are similar since they must both deliver equipment and supplies to support operations in an extreme environment with little margin for error in order to be successful. By carefully and closely monitoring the manifesting and operational support equipment lists which will enable this South Pole traverse, functional areas have been identified. The equipment required to support these functions will be listed with relevant properties such as mass, volume, spare parts and maintenance schedules. This equipment will be compared to space systems currently in use and projected to be required to support equivalent and parallel functions in Lunar and Mars missions in order to provide a level of realistic benchmarking. Space operations have historically required significant amounts of support equipment and tools to operate and maintain the space systems that are the primary focus of the mission. By gaining insight and expertise in Antarctic South Pole traverses, space missions can use the experience gained over the last half century of Antarctic operations in order to design for operations, maintenance, dual use, robustness and safety which will result in a more cost effective, user friendly, and lower risk surface system on the Moon and Mars. It is anticipated that the U.S Antarctic Program (USAP) will also realize benefits for this interaction with NASA in at least two areas: an understanding of how NASA plans and carries out its missions and possible improved efficiency through factors such as weight savings, alternative technologies, or modifications in training and operations.

Mueller, Robert P.↗

Exercise Equipment Usability Assessment for a Deep Space Concept Vehicle

With international aspirations to send astronauts to deep space, the world is now faced with the complex problem of keeping astronauts healthy in unexplored hostile environments for durations of time never before attempted by humans. The great physical demands imparted by space exploration compound the problem of astronaut health, as the astronauts must not only be healthy, but physically fit upon destination arrival in order to perform the scientific tasks required of them. Additionally, future deep space exploration necessitates the development of environments conducive to long-duration habitation that would supplement propulsive vehicles. Space Launch System (SLS) core stage barrel sections present large volumes of robust structure that can be recycled and used for long duration habitation. This assessment will focus on one such conceptual craft, referred to as the SLS Derived Habitat (SLS-DH). Marshall Space Flight Center's (MSFC) Advanced Concepts Office (ACO) has formulated a high-level layout of this SLS-DH with parameters such as floor number and orientation, floor designations, grid dimensions, wall placement, etc. Yet to be determined, however, is the layout of the exercise area. Currently the SLS-DH features three floors laid out longitudinally, leaving 2m of height between the floor and ceilings. This short distance between levels introduces challenges for proper placement of exercise equipment such as treadmills and stationary bicycles, as the dynamic envelope for the 95th percentile male astronauts is greater than 2m. This study aims to assess the optimal equipment layout and sizing for the exercise area of this habitat. Figure 1 illustrates the layout of the DSH concept demonstrator located at MSFC. The exercise area is located on the lower level, seen here as the front half of the level occupied by a crew member. This small volume does not allow for numerous or bulky exercise machines, so the conceptual equipment has been limited to a treadmill and stationary bicycle. With the most current treadmill aboard the International Space Station (ISS), the Combined Operational Load-Bearing External Resistance Treadmill (COLBERT), being located in an International Standard Payload Rack (ISPR), the bottom of the conceptual treadmill features a height of 38in. Making the treadmill flush with the floor would be impossible in this rack configuration, as the distance from the outer wall of the spacecraft to the bottom floor would be too shallow. From preliminary sizing, the 38in required for the bottom of the treadmill combined with a 78in operational envelope for a 95th percentile may not be accommodated in the exercise area in a vertical orientation. Figure 2 demonstrates the volume required (in maroon) for an ISPR-bound treadmill in the concept demonstrator. Early indications as seen in this figure indicate that the crew members would contact the ceiling in such an arrangement. An assessment will be conducted to evaluate various orientations of exercise equipment in the concept demonstrator. Orientations to be tested include putting the bottom of the treadmill on the wall, having the treadmill at an angle in the floor both horizontally and vertically, and having a shorter (non-rack bound) treadmill in a vertical orientation on the floor. This assessment will yield findings regarding sizing of the area and how well participants feel they could exercise in such an environment. Due to the restrictions of assessing a microgravity vehicle in a normal-gravity environment, simulations in MSFC's Virtual Environments Lab (VEL) may be necessary. Final deliverables will include recommendations regarding the location and size of possible exercise equipment aboard the SLS-Derived DSH.

Rhodes, Brooke M.↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Energy, power, and infrastructure demands from electrifying airport ground support equipment at United States airports

As the airline industry seeks to reduce costs and transition to clean energy, electric ground support equipment is emerging as a favorable option. The integration of electric ground support equipment into airport operations requires careful planning for vehicle deployment, charging infrastructure, and grid impacts. We develop a flexible, bottom-up modeling framework to assess energy and infrastructure needs across more than 300 U.S. airports. Our analysis estimates site-specific power and energy demand, equipment counts by type, charger requirements, and costs. Here we quantify the magnitude of new electrical loads created by the electrification of airport ground support equipment, finding that peak power demand at the largest airports can reach up to 20 megawatts, with annual electricity consumption approaching 51,000 megawatt-hours. We further show that behind-the-meter battery energy storage systems and solar photovoltaic systems can reduce peak load and lower total system costs by as much as 10 million dollars.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Airport Ground Support Equipment Infrastructure & Logistics Electrification Assessment Tool: 2025 Data Development, Modeling and Analysis for DFW

The aviation industry is increasingly turning to modernize freight facilities by integrating electric Ground Support Equipment (eGSE) to enhance operational efficiency of freight facility moving vehicles and equipment. Airports worldwide are adopting eGSE to streamline cargo movement, reduce fuel and maintenance costs, and improve logistics coordination.1 North America, with its advanced aviation infrastructure, leads this transition, leveraging Internet of things (IoT)-enabled automation and zero emission technologies to boost reliability and reduce human errors.2 Electrification of freight facility moving vehicles and equipment boosts turnaround times, improves equipment reliability, and optimizes logistics coordination, giving operators a competitive advantage. With rising fuel price volatility and the pressure to meet stringent performance benchmarks, airports are focusing on cost-effective, scalable solutions for long-term financial and operational gains. To further accelerate electrification, airports are integrating Zero Emission Vehicles (ZEVs) into rental car fleets and deploying electric baggage carts, requiring strategic investments in charging infrastructure. 3 The shift, however, presents challenges, such as limited technical expertise, high capital costs, and complex procurement processes. By forging strategic partnerships, leveraging advanced technologies, and optimizing infrastructure investments, airports can create a resilient, future-ready ecosystem that enhances the movement of people and goods through electrification-driven efficiency. Supported by the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO), this electrification effort provides a scalable, cost-effective solution to improve airport freight operations. Through targeted investments and innovation, airports enhance efficiency, reduce costs, and meet performance benchmarks while advancing toward a resilient, electrified future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Apollo experience report: Acceptance checkout equipment for the Apollo spacecraft

The acceptance checkout equipment for the Apollo spacecraft is described, and the history of the major equipment modifications that were required to meet the Apollo Program checkout requirements is traced. Some major problem areas are outlined, and a discussion of future checkout methods is included. The concept of the future checkout methods presented provides for an increase in test equipment standardization among NASA programs and among all testing phases within a program. The capability for increased automation and reduction in the test equipment inventory is provided in the proposed concept.

Burtzlaff, I. J.↗

High voltage design guide for airborne equipment

The report supplies the theoretical background and design techniques needed by an engineer who is designing electrical insulation for high-voltage high-power components, equipment, and systems on aircraft. A literature survey and abundant bibliography identify references that provide further data on the subjects of partial discharges, corona, field theory and plotting, voids and processes for applying insulation. Both gaseous and solid insulations are treated. Cryogenic and liquid design notes are included. Tests and test equipment for high voltage insulation and equipment are defined. Requirements of test plans and procedures for high-voltage high-power equipment are identified and illustrated by examples. Suggestions for high-voltage specifications are provided. Very few of the Military and Government specifications deal with system voltages above 10kv, thus most aircraft high-voltage specifications will have to be derived from the power industry specifications and standards produced by ASTM, IEEE, and NEMA.

W G Dunbar↗

Analysis of flight equipment purchasing practices of representative air carriers

The process through which representative air carriers decide whether or not to purchase flight equipment was investigated as well as their practices and policies in retiring surplus aircraft. An analysis of the flight equipment investment decision process in ten airlines shows that for the airline industry as a whole, the flight equipment investment decision is in a state of transition from a wholly informal process in earliest years to a much more organized and structured process in the future. Individual air carriers are in different stages with respect to the formality and sophistication associated with the flight equipment investment decision.

Source record↗

The role of engineering in the flight equipment purchasing process

The role of the airline engineering department in the flight equipment acquisition process is examined. The data for the study was collected from six airlines. The principal findings of the study include: (1) engineering activities permeate, but do not dominate the airline flight equipment decision process. (2) The principal criterion for the flight equipment acquisition decision is return on investment. (3) The principal sources of information for the airline engineering departments in the monitoring process are the manufacturers of equipment. Subsidiary information sources include NASA publications and conferences, among others and (4) The engineering department is the principal communication channel for technical information.

Source record↗

Shuttle orbiter S-band communications equipment design evaluation

An assessment of S-band communication equipment includes: (1) the review and analysis of the ability of the various subsystem avionic equipment designs to interface with, and operate on signals from/to adjoining equipment; (2) the performance peculiarities of the hardware against the overall specified system requirements; and (3) the evaluation of EMC EMI test results of the various equipment with respect to the possibility of mutual interferences.

Springett, J. C.↗

Public service user terminus study compendium of terminus equipment

General descriptions and specifications are given for equipments which facilitate satellite and terrestrial communications delivery by acting as interfaces between a human, mechanical, or electrical information generator (or source) and the communication system. Manufactures and suppliers are given as well as the purchase, service, or lease costs of various products listed under the following cateories: voice/telephony/facsimile equipment; data/graphics terminals; full motion and processes video equipment; and multiple access equipment.

Source record↗