Search NASASearch

SEARCH · Search NASA

Results for “EUROPEAN SPACE PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Possible LISA Technology Applications for Other Missions

The Laser Interferometer Space Antenna (LISA) has been selected as the third large class mission launch opportunity of the Cosmic Visions Program by the European Space Agency (ESA). LISA science will explore a rich spectrum of astrophysical gravitational-wave sources expected at frequencies between 0.0001 and 0.1 Hz and complement the work of other observatories and missions, both space and ground-based, electromagnetic and non-electromagnetic. Similarly, LISA technology may find applications for other missions. This paper will describe the capabilities of some of the key technologies and discuss possible contributions to other missions.

Livas, Jeffrey

International Cooperation in the Field of International Space Station (ISS) Payload Safety

In the frame of the International Space Station (ISS) Program cooperation, in 1998, the European Space Agency (ESA) approached the National Aeronautics and Space Administration (NASA) with the unique concept of a Payload Safety Review Panel (PSRP) "franchise" based at the European Space Technology Center (ESTEC), where the panel would be capable of autonomously reviewing flight hardware for safety. This paper will recount the course of an ambitious idea as it progressed into a fully functional reality. It will show how a panel initially conceived at NASA to serve a national programme has evolved into an international safety cooperation asset. The PSRP established at NASA began reviewing ISS payloads approximately in late 1994 or early 1995 as an expansion of the pre-existing Shuttle Program PSRP. This paper briefly describes the fundamental Shuttle safety process and the establishment of the safety requirements for payloads intending to use the Space Transportation System and International Space Station (ISS). The paper will also offer some historical statistics about the experiments that completed the payload safety process for Shuttle and ISS. The paper 1 then presents the background of ISS agreements and international treaties that had to be taken into account when establishing the ESA PSRP. The detailed franchising model will be expounded upon, followed by an outline of the cooperation charter approved by the NASA Associate Administrator, Office of Space Flight, and ESA Director of Manned Spaceflight and Microgravity. The resulting ESA PSRP implementation and its success statistics to date will then be addressed. Additionally the paper presents the ongoing developments with the Japan Aerospace Exploration Agency. The discussion will conclude with ideas for future developments, such to achieve a fully integrated international system of payload safety panels for ISS.

Heimann, Timothy

Status of the Esa-earthnet LANDSAT-4 TM Ground Processing Chain

The European program of the European Space Agency received a mandate to upgrade the two existing LANDSAT stations operating in Europe, Kiruna in Sweden and Fucino in Italy, to acquire and process TM data. The salient features of the TM systems are summarized, and the preliminary results of the acceptance tests being carried out using the TM passes acquired in Fucino are reviewed before the X band downlink anomaly of LANDSAT-4.

Fusco, L.

Evaluation of sodium-nickel chloride cells for space applications

The status of the European Space Agency (ESA) program on sodium nickel chloride batteries is outlined. Additionally, the results of initial tests of two prototype space cells are reported. After 2800 cycles typical of a low-earth orbit (LEO) application without failure, the recharge ratio remained at unity, the round trip energy efficiency remained high (87 percent), and the increase in internal cell resistance was modest. Initial tear-down analysis data show no degradation whatsoever of the beta-alumina electrolyte tubes. The low-rate capacity did, however drop by some 40 percent, which needs further investigation, but overall results are encouraging for future use of this couple in geosynchronous (GEO) and LEO spacecraft.

Hendel, B.

Designing berthing mechanisms for international compatibility

The paper examines the technological issues regarding common berthing interfaces for the Space Station Freedom and pressurized modules from U.S., European, and Japanese space programs. The development of the common berthing mechanism (CBM) is based on common requirements concerning specifications, launch environments, and the unique requirements of ESA's Man-Tended Free Flyer. The berthing mechanism is composed of an active and a passive half, a remote manipulator system, 4 capture-latch assemblies, 16 structural bolts, and a pressure gage to verify equalization. Extensive graphic and verbal descriptions of each element are presented emphasizing the capture-latch motion and powered-bolt operation. The support systems to complete the interface are listed, and the manufacturing requirements for consistent fabrication are discussed to ensure effective international development.

Winch, John

HYDRA, a new tool for mechanical testing

The introduction outlines the verification concept for programs of the European Space Agency (ESA). The role of the Agency in coordinating the activities of major European space test centers is summarized. Major test facilities of the environmental test center at ESTEC, the Space Research and Technology Center of ESA, are shown and their specific characteristics are highlighted with special emphasis on the 6-degree-of-freedom (6-DOF) hydraulic shaker. The specified performance characteristics for sine and transient tests are presented. Results of single-axis hardware tests and 6-DOF computer simulations are included. Efforts employed to protect payloads against accidental damage in case of malfunctions of the facility are listed. Finally the operational advantages of the facility, as well as the possible use of the HYDRA control system design for future applications are indicated.

Brinkmann, P. W.

Independent Verification and Validation Program

Presentation to be given to European Space Agency counterparts to give an overview of NASA's IVV Program and the layout and structure of the Software Testing and Research laboratory maintained at IVV. Seeking STI-ITAR review due to the international audience. Most of the information has been presented to public audiences in the past, with some variations on data, or is in the public domain.

Research

NASA Collaborative Approach Mitigates Environmentally-Driven Obsolescence

National Aeronautics and Space Administration (NASA) missions, like Department of Defense (DoD) organizations, require the rigorous testing and qualification of critical materials. Obsolescence supply risks created by environmental requirements can affect the cost, schedule and performance of NASA missions and the resilience of critical infrastructure. The NASA Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center helps to identify obsolescence supply risks driven by environmental requirements and works proactively with NASA Centers and Programs, the DoD, the European Space Agency (ESA) and other agencies and partners to identify and evaluate environmentally friendly alternatives. TEERM tracks environmental regulations, identifies the potential loss of material availability and works with NASA programs and Centers to evaluate potential impacts through a risk assessment approach. TEERM collaborative projects identify, demonstrate and evaluate commercially viable alternative technologies and materials. A major focus during the Space Shuttle Program was the need to replace ozone depleting substances that were used in spray foam and cleaning applications. The potential obsolescence of coatings containing hexavalent chromium and the risks associated with lead free solder were also of concern for the Space Shuttle and present ongoing risks to new programs such as the Space Launch System. One current project teams NASA and ESA in the evaluation and testing of individual coatings and coating systems as replacements for hexavalent chromium coatings in aerospace applications. The proactive, collaborative approach used by TEERM helps reduce the cost burden on any one team partner, reduces duplication of effort, and enhances the technical quality and overall applicability of the testing and analysis.

environmentall-driven obsolescence

Mission X: Train Like an Astronaut Challenge

The Mission X: Train Like an Astronaut Challenge was developed in 2011 to encourage proper exercise and nutrition at an early age by teaching young people to live and eat like space explorers. The strong correlation between an unhealthy childhood diet and adolescent fitness, and the onset of chronic diseases as an adult is the catalyst for Mission X. Mission X is dedicated to assisting people on a global scale to live healthier lifestyles and learn about human space exploration. The Mission X: Train Like an Astronaut 2015 (MX15) International Challenge hosted almost 40,000 children on 800 teams, 28 countries affiliated with 12 space agencies. The MX15 website included 17 languages. MX15, the fifth annual international fitness challenges sponsored by the NASA Human Research Program worked with the European Space Agency and other space agencies from around the world. In comparison to MX14, MX15 expanded to include four additional new countries, increased the number of students by approximately 68% and the number of teams by 29%. Chile' and South Korea participated in the new fall Astro Charlie Walk Around the Earth Challenge. Pre-challenge training materials were made more readily available from the website. South Korea completed a prospective assessment of the usability of the MX content for improving health and fitness in 212 preschool children and their families. Mission X is fortunate to have the support of the NASA, ESA and JAXA astronaut corps. In MX15, they participated in the opening and closing events as well as while on-board the International Space Station. Italian Astronaut Samantha Cristoretti participated as the MX15 Astronaut Ambassador for health and fitness providing the opening video and other videos from ISS. United Kingdom Astronaut Tim Peake and US Astronaut Kate Rubins have agreed to be the MX Ambassadors for 2016 and 2017 respectively. The MX15 International Working Group Face-to-Face meeting and Closing Event were held at the Agenzia Spaziale Italiana (ASI) in Rome, Italy. A record number of twenty-eight countries participated. Austria and Norway have offered to host the 2016 and 2017 working group meetings. MX16 planning began with the working group meetings and areas of improvement will include another second early challenge to accommodate countries in the Southern Hemisphere, recommended changes to the MX website, development of a more defined approach to metrics, a change to the format of future MX International Working Group meetings, and proposed new activities to be developed by the MX International Educator Working Group. We look forward to welcoming many new participants in 2016!

Lloyd, Charles W.

Astronaut Medical Selection and Flight Medicine Care During the Shuttle ERA 1981 to 2011

The NASA Shuttle Program began with congressional budget approval in January 5, 1972 and the launch of STS-1 on April 12, 1981 and recently concluded with the landing of STS-135 on July 21, 2011. The evolution of the medical standards and care of the Shuttle Era Astronauts began in 1959 with the first Astronaut selection. The first set of NASA minimal medical standards were documented in 1977 and based on Air Force, Navy, Department of Defense, and the Federal Aviation Administration standards. Many milestones were achieved over the 30 years from 1977 to 2007 and the subsequent 13 Astronaut selections and 4 major expert panel reviews performed by the NASA Flight Medicine Clinic, Aerospace Medicine Board, and Medical Policy Board. These milestones of aerospace medicine standards, evaluations, and clinical care encompassed the disciplines of preventive, occupational, and primary care medicine and will be presented. The screening and retention standards, testing, and specialist evaluations evolved through periodic expert reviews, evidence based medicine, and Astronaut medical care experience. The last decade of the Shuttle Program saw the development of the International Space Station (ISS) with further Space medicine collaboration and knowledge gained from our International Partners (IP) from Russia, Canada, Japan, and the European Space Agencies. The Shuttle Program contribution to the development and implementation of NASA and IP standards and waiver guide documents, longitudinal data collection, and occupational surveillance models will be presented along with lessons learned and recommendations for future vehicles and missions.

Johnston, S.

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine(OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging f rom STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-f light performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

liquid propulsion systems

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine (OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty-four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging from STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-f light performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

liquid propulsion systems

The Space Shuttle as an educational tool

The paper discusses the impact of the Space Transportation System (STS) and the Space Shuttle on the science educational community and gives an overview of past space education programs. Construction of four flight 'Orbiters' (Columbia, Challenger, Discovery, and Atlantis) is being planned, with each Orbiter containing an External Tank (ET) to power the Orbiter's main engines, and two solid rocket boosters (SRB). Each Orbiter can carry a crew of seven, has a cargo bay for 65,000 lb of satellites and scientific equipment, and has an average flight duration of up to 7 days. NASA educational programs reviewed are the Skylab Student Program, the 'Getaway Special' Program, and the Shuttle Student Involvement Project for Secondary Schools (SSIP-S), as well as ESA programs including the Educational Physics Experiments in Spacelab and the Access to Spacelab for Young Europeans Program. A 'Classroom in Space' and 'Space University' have been proposed for the future.

David, L. W.

International aspects of commercial space activities

Attention is given to problems in international cooperation that will arise if NASA proceeds with a Space Station. The rise in space budgets in many countries is cited as an indication of the growing importance being placed on space activities. It is also pointed out that these nations are emphasizing areas which hold promise for eventual commercial payoff. Developing countries are also paying greater attention to space. As part of the European Space Agency's development program, it is underwriting the development of up to six multiuser facilities dedicated to microgravity research; these include furnaces and thermostats for processing metallurgical samples and for crystal growth and botanical investigations. Competition from Europe is seen as a spur to efficiency. Attention is also given to the question whether international cooperation will interfere with research carried out by the US for military purposes.

Pedersen, K. S.

First satellite mobile communication trials using BLQS-CDMA

In this paper, technical results obtained in the first MSBN Land mobile technical trial are reported. MSBN (Mobile Satellite Business Network) is a new program undertaken by the European Space Agency (ESA) to promote mobile satellite communication in Europe, in particular voice capability. The first phase of the MSBN system implementation plan is an experimental phase. Its purpose is to evaluate through field experiments the performance of the MSBN system prior to finalization of its specifications. Particularly, the objective is to verify in the field and possibly improve the performance of the novel satellite access technique BLQS-CDMA (Band Limited Quasi-Synchronous-Code Division Multiple Access), which is proposed as baseline for the MSBN.

Luzdemateo, Maria

Implementation of the Orbital Maneuvering Systems Engine and Thrust Vector Control for the European Service Module

The European Space Agency (ESA) has entered into a partnership with the National Aeronautics and Space Administration (NASA) to develop and provide the Service Module (SM) for the Orion Multipurpose Crew Vehicle (MPCV) Program. The European Service Module (ESM) will provide main engine thrust by utilizing the Space Shuttle Program Orbital Maneuvering System Engine (OMS-E). Thrust Vector Control (TVC) of the OMS-E will be provided by the Orbital Maneuvering System (OMS) TVC, also used during the Space Shuttle Program. NASA will be providing the OMS-E and OMS TVC to ESA as Government Furnished Equipment (GFE) to integrate into the ESM. This presentation will describe the OMS-E and OMS TVC and discuss the implementation of the hardware for the ESM.

Orbital Maneuvering System

Attitude sensor package

This paper describes the design, construction, testing, and successful flight of the Attitude Sensor Package. The payload was assembled on a standard HITCHHIKER experiment mounting plate, and made extensive use of the carrier's power and data handling capabilities. The side mounted HITCHHIKER version was chosen, since this configuration provided the best viewing conditions for the instruments. The combustion was successfully flown on board Space Shuttle Columbia (STS-52), in October 1992. The payload was one of the 14 experiments of the In-Orbit Technology Demonstration Program (Phase 1) of the European Space Agency.

Aceti, R.

Technology Evaluation for Environmental Risk Mitigation Compendium

The Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center and its predecessor organization the Acquisition Pollution Prevention Program (AP2) supported the National Aeronautics and Space Administration (NASA) in identifying technology solutions to risks and costs to NASA programs driven by environmental regulations and requirements. TEERM researched the commercial and government marketplace to locate viable and available technologies that met NASAs needs. TEERM focused on addressing environmentally-driven risks of direct concern to NASA programs and facilities, including hazardous materials in NASA operations and materials that became obsolescent because of environmental regulations. TEERM projects aimed to reduce cost; ensure the health and safety of people, assets, and the environment; promote efficiency; and minimize duplication. Major TEERM and AP2 projects focused on waste minimization and hazardous waste treatment, recycling, corrosion prevention and control, solvent and ozone depleting substances substitution, and aqueous based cleaners. In 2017, NASA made the decision to terminate the TEERM Principal Center. This Compendium Report documents TEERM and AP2 project successes. The Compendium Report traces the evolution of TEERM based on evolving risks and requirements for NASA and its relationship to the Space Shuttle Program, the United States Department of Defense, the European Space Agency, and other public and private stakeholders. This Compendium Report also documents project details from Project Summaries and Joint Test Plans and describes project stakeholders and collaborative effort results.

material obsolescent