Search NASA⌕ Search

SEARCH · Search NASA

Results for “Echogenicity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

26 records · Page 2

sCO2 Primary Power Large-Scale Pilot Plant FEED Summary

Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.

01 COAL, LIGNITE, AND PEAT↗

Testing- and Model- Based Optimization of Coal-fired Primary Heater Design for Indirect Supercritical CO 2 Power Cycles (Final Scientific and Technical Report)

The overall objective of this project was to perform the R&D necessary to mitigate the risk associated with the design of a primary heat exchanger for a solid-fired combustion system coupled with an indirect-fired closed-loop Brayton Cycle utilizing supercritical CO 2 . The key technological hurdle was the coupling of a solid-fuel firing system with the primary heater, which poses a singular challenge, which is the management of burner performance and operational conditions in a way to manage heat exchanger tube metal temperatures and temperature ramp rates in the absence of fluid phase change on the inside of the tubes. We designed and built the first ever pseudo power system employing a simple recuperated supercritical CO 2 closed-loop Brayton Cycle coupled to a solid-fuel fired system. Advanced coupled CFD and process modeling were used to design the primary heat exchanger (PHX), which consisted of both radiative and convective sections, to limit tube metal temperatures resulting from the heat release profile of the solid fuel flame near the radiative tubes. The heat exchanger was designed to produce finished CO 2 temperatures of 600 °C a pressure of 20.7 MPa and CO 2 flow of 5.5 kg/s. The constructed PHX was capable of 1.2 MWth heat uptake. During design of the PHX, the modeling showed that most variables influencing flame shape (burner stoichiometric ratio and register velocities and swirl) were not suitable to manage heat flux to the metal surfaces. This is because they substantially increased adiabatic flame temperature through the influence of localized stoichiometric ratio. Excess air and firing rate were the two most powerful variables that could be used to control tube surface temperatures. The coupled system was operated for a total of 407 hours, with the longest continuous run of 248 hours. For 62% of the operational time, the unit was unmanned and in automatic control. The fuels used for the testing included natural gas, two Utah Bituminous coals, woody biomass, and bagasse. During the testing we were able to verify the 1.2 MWth heat uptake and we operated at a finished CO 2 temperature of 607 °C and a pressure of 20.3 MPa simultaneously. The real-time corrosion rate of the Super 304H tube CO 2 surface in the region of the radiative section of the PHX were measured, at an approximate temperature of 550 °C. The two key variables related to corrosion rate are the pressure and flow rate of the CO 2 . A technoeconomic analysis was performed at a scale of 120 MWE. The updated analysis showed that the efficiency of an sCO 2 power producing plant will be related to the pressure drop of the PHX.

01 COAL, LIGNITE, AND PEAT↗