Search NASASearch

SEARCH · Search NASA

Results for “Egress”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Improved Emergency Egress Lighting System for the ISS

Emergency lights provide illumination in corridors, stairwells, ramps, escalators, aisles, and exit passageways during power failures. Safety and visibility are critical during a power outage. If emergency lights fail to operate properly, the building occupants can become disoriented. Four documents in a collection discuss different topics relating to a proposed improved emergency egress lighting system (EELS) for the International Space Station (ISS). While the present EELS is designed around rows of green-light-emitting diodes, the proposed system contains strips of electroluminescent tape using different colors for each egress path. The proposed EELS can be powered by the same battery currently used by the present EELS, but would require an inverter because electroluminescent devices require AC. Electroluminescent devices also require significantly less current and, depending on the color, would emit 3 to 8 times the light of the present EELS. In addition, they could operate for up to 75 hours (versus .20 minutes for the present system). The first document contains a one-page summary of the proposal and an evaluation of technical merit. The second document summarizes the motivation for, and the design of, the proposed EELS. The third document addresses relevant aspects of the measurement of spectral sensitivity and the psychophysics of perception of light. The fourth document presents additional background information and technical specifications for the electroluminescent tapes.

Eaton, Leslie L.

Emergency in-flight egress opening for general aviation aircraft

In support of a stall/spin research program, an emergency in-flight egress system is being installed in a light general aviation airplane. To avoid a major structural redesign for a mechanical door, an add-on 11.2 kg pyrotechnic-actuated system was developed to create an opening in the existing structure. The airplane skin will be explosively severed around the side window, across a central stringer, and down to the floor, creating an opening of approximately 76 by 76 cm. The severed panel will be jettisoned at an initial velocity of approximately 13.7 m/sec. System development included a total of 68 explosive severance tests on aluminum material using small samples, small and full scale flat panel aircraft structural mock-ups, and an actual aircraft fuselage. These tests proved explosive sizing/severance margins, explosive initiation, explosive product containment, and system dynamics.

Bement, L. J.

Explosively Actuated Opening for Rapid Egress

Flexible linear-shaped charge provides explosive energy to create opening and to jettison panel. Container around explosive charge protects pilot from effects of explosion. Exterior steel strip receives most of force of explosion to jettison severed panel. System allows pilot to bail out from left side of airplane by creating opening where no door exists. Egress system is simple and highly responsive, requiring minimal modifications to airplane.

Bement, L. J.

Project EGRESS: Earthbound Guaranteed Reentry from Space Station. the Design of an Assured Crew Recovery Vehicle for the Space Station

Unlike previously designed space-based working environments, the shuttle orbiter servicing the space station will not remain docked the entire time the station is occupied. While an Apollo capsule was permanently available on Skylab, plans for Space Station Freedom call for a shuttle orbiter to be docked at the space station for no more than two weeks four times each year. Consideration of crew safety inspired the design of an Assured Crew Recovery Vehicle (ACRV). A conceptual design of an ACRV was developed. The system allows the escape of one or more crew members from Space Station Freedom in case of emergency. The design of the vehicle addresses propulsion, orbital operations, reentry, landing and recovery, power and communication, and life support. In light of recent modifications in space station design, Project EGRESS (Earthbound Guaranteed ReEntry from Space Station) pays particular attention to its impact on space station operations, interfaces and docking facilities, and maintenance needs. A water-landing medium-lift vehicle was found to best satisfy project goals of simplicity and cost efficiency without sacrificing safety and reliability requirements. One or more seriously injured crew members could be returned to an earth-based health facility with minimal pilot involvement. Since the craft is capable of returning up to five crew members, two such permanently docked vehicles would allow a full evacuation of the space station. The craft could be constructed entirely with available 1990 technology, and launched aboard a shuttle orbiter.

Source record

Project EGRESS: The design of an assured crew return vehicle for the space station

Keeping preliminary studies by NASA in mind, an Assured Crew Return Vehicle (ACRV) was developed. The system allows the escape of one or more crew members from Space Station Freedom in case of emergency. The design of the vehicle addresses propulsion, orbital operations, reentry, landing and recovery, power and communication, and life support. In light of recent modifications in Space Station design, Project EGRESS (Earthbound Guaranteed ReEntry from Space Station) pays particular attention to its impact on Space Station operations, interfaces and docking facilities, and maintenance needs. A water landing, medium lift vehicle was found to best satisfy project goals of simplicity and cost efficiency without sacrificing the safety and reliability requirements. With a single vehicle, one injured crew member could be returned to Earth with minimal pilot involvement. Since the craft is capable of returning up to five crew members, two such permanently docked vehicles would allow full evacuation of the Space Station. The craft could be constructed entirely with available 1990 technology and launched aboard a shuttle orbiter.

Source record

Emergency egress requirements for caution and warning, logistics, maintenance, and assembly stage MB-6 of Space Station Freedom

The safety and survival of the crewmembers has been the prime concern of NASA. Previous studies have been conducted mainly for emergencies occurring during the operating mode of the fully assembled Station. The present study was conducted to evaluate the emergency requirements for the caution and warning, logistics, maintenance, and assembly stage MB-6 of the Station in space. Effective caution and warning is essential to achieve safe egress in emergencies. In order to survive a long period in space, the safety and emergency requirements for maintenance, logistics, and extravehicular assembly operation in space must be met.

Ray, Paul S.

Mars pathfinder Rover egress deployable ramp assembly

The Mars Pathfinder Program is a NASA Discovery Mission, led by the Jet Propulsion Laboratory, to launch and place a small planetary Rover for exploration on the Martian surface. To enable safe and successful egress of the Rover vehicle from the spacecraft, a pair of flight-qualified, deployable ramp assemblies have been developed. This paper focuses on the unique, lightweight deployable ramp assemblies. A brief mission overview and key design requirements are discussed. Design and development activities leading to qualification and flight systems are presented.

Spence, Brian R.

Loads Produced During the Ingression and Egression of the Portable Foot Restraint on the Hubble Space Telescope

The Hubble Space Telescope (HST) was deployed from the Space Shuttle Discovery on April 25, 1990. It is capable of performing observations in the visible, near-ultraviolet, and near-infrared (1150 A to 1 mm). The HST weighs 12 tons, and collects light with an 8-ft-diameter mirror. The attitude control and maneuvering is performed by four of six gyroscopes, or reaction wheels. The HST contains fine guidance sensors that lock onto guide stars to reduce the spacecraft drift and increase the pointing accuracy. The HST was designed to last 15 years, with crewed service missions approximately every three years. The first service mission, STS-61, took place in 1993. The second service mission took place in 1997. In 1999, the STS-103 crew performed the third service mission to the HST. This mission's purpose was to replace the right sensor units and make improvements on the fine guidance sensors. To perform these tasks on the HST, the STS-103 crewmembers used a portable foot restraint to anchor themselves to the HST in the zero-gravity environment. The solar arrays currently used on the telescope are second-generation, and therefore susceptible to loads placed on the telescope. The crew and Mission Operations Directorate worried about the damage that the crew could possibly cause during ingress and egress of the PFR and by transferring loads to the solar arrays. The purpose of this study is to inform the crewmembers of the loads they are imparting on the HST, and train them to decrease these loads to a safer level. Minimizing these loads will significantly decrease the chance of crewmembers causing damage to the solar arrays while repairing the HST.

Ramsey, Susan

Explosive Fracturing of an F-16 Canopy for Through-Canopy Crew Egress

Through-canopy crew egress, such as in the Harrier (AV-8B) aircraft, expands escape envelopes by reducing seat ejection delays in waiting for canopy jettison. Adverse aircraft attitude and reduced forward flight speed can further increase the times for canopy jettison. However, the advent of heavy, high-strength polycarbonate canopies for bird-strike resistance has not only increased jettison times, but has made seat penetration impossible. The goal of the effort described in this paper was to demonstrate a method of explosively fracturing the F-16 polycarbonate canopy to allow through-canopy crew ejection. The objectives of this effort were to: 1. Mount the explosive materials on the exterior of the canopy within the mold line, 2. Minimize visual obstructions, 3. Minimize internal debris on explosive activation, 4. Operate within less than 10 ms, 5. Maintain the shape of the canopy after functioning to prevent major pieces from entering the cockpit, and 6. Minimize the resistance of the canopy to seat penetration. All goals and objectives were met in a full-scale test demonstration. In addition to expanding crew escape envelopes, this canopy fracture approach offers the potential for reducing system complexity, weight and cost, while increasing overall reliability, compared to current canopy jettison approaches. To comply with International Traffic in Arms Regulations (ITAR) and permit public disclosure, this document addresses only the principles of explosive fracturing of the F-16 canopy materials and the end result. ITAR regulations restrict information on improving the performance of weapon systems. Therefore, details on the explosive loads and final assembly of this canopy fracture approach, necessary to assure functional performance, are not included.

Bement, Laurence J.

STS-47 Astronaut Crew at Pad B for TCDT, Emergency Egress Training, and Photo Opportunity

The crew of STS-47, Commander Robert L. Gibson, Pilot Curtis L. Brown, Payload Commander Mark C. Lee, Mission Specialists N. Jan Davis, Jay Apt, and Mae C. Jemison, and Payload Specialist Mamoru Mohri are seen during emergency egress training. Then Commander Gibson introduces the members of the crew and they each give a brief statement about the mission and answer questions from the press.

Source record

STS-55 Emergency Egress Training/Photo Opportunity at Pad A

The crew of STS-55, Commander Steven R. Nagel, Pilot Terence T. Henricks, Mission Specialists Jerry L. Ross, Charles J. Precourt, and Dr. Bernard A. Harris Jr., and Payload Specialists Dr. Ulrich Walter and Hans Schlegel are seen during emergency egress training. Then Commander Nagel introduces the members of the crew and they each give a brief statement about the mission and answer questions from the press.

Source record

STS-54 Astronaut Crew Emergency Egress Training, Press Q&A, TCDT

The crew of STS-54, Commander John H. Casper, Pilot Donald R. McMonagle, and Mission Specialists Mario Runco, Jr., Gregory J. Harbaugh, and Susan J. Helms, is seen during a question and answer session with the press and during the Terminal Countdown and Demonstration Test (TCDT), including Emergency Egress Training.

Source record