Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electric Power Research Institute”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Five Year Wildfire Risk Reduction Action Plan for the Electric Power Industry

The U.S. DOE and the Electric Power Research Institute convened a wildfire advisory group to bring together knowledge of ignition risks, electric utility needs, the applicability of available technology, and existing technology gaps. The outcome is a five-year action plan, containing recommendations on RD&D projects, that if completed by the year 2030, may accelerate the power industry’s ability to substantially reduce wildfire ignition risks. When reviewing this document please consider it is a snapshot in time for the years 2023 and 2024, could be obsolete by the end of the decade. The following list comprises the titles and topics for the proposed follow-on demonstrations: 1. Hybrid Undergrounding RD&D, 2. Live Downed Conductor Detection RD&D, 3. Fault Energy Reduction RD&D, 4. Advanced Inspection and Response Drone, 5. Fault and PQ Event Signature Repository, 6. Advanced and Intelligent Sensor Nodes, 7. Fire Friendly Asset Coatings and Coverings, and 8. Environmental Monitoring Action Plan.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Planning and Operations in Electricity Markets Under System Tansformation: Key Findings

This report summarizes a set of key findings that have been developed through a set of interconnected research activities performed by five institutions between January 2020 and December 2023. The project team, comprising Argonne National Laboratory, the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, the Electric Power Research Institute, and Johns Hopkins University, collective engaged with the North American Independent System Operators and Regional Transmission Operators (ISO/RTOs) to identify the key challenges they are facing and opportunities for the project team to provide technical assistance in several prioritized challenge areas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Report on High Energy Arcing Fault Experiments: Experimental Results from Low-Voltage Switchgear Enclosures

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena for low-voltage metal enclosed switchgear containing aluminum conductors. This report covers full-scale laboratory experiments using representative nuclear power plant (NPP) three-phase electrical equipment. Electrical, thermal, and pressure data were recorded for each experiment and documented in this report. This report covers experiments performed on two low-voltage switchgear units with each unit consisting of two vertical sections. The data collected supports characterization of the low-voltage HEAF hazard and these results will be used to support potential improvements in fire probabilistic risk assessment (PRA) methods. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the NRC, the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setup and execution. The HEAF experiments were performed between August 26 and Augsut 29, 2019 on nearidentical Westinghouse Type DS low-voltage metal-enclosed indoor switchgear. The threephase arcing fault was initiated on the aluminum main bus or in select cases on the copper bus stabs near the breaker. These experiments used either nominal 480 volts AC or 600 volts AC. Durations of the experiments ranged from approximately 0.4 s to 8.3 s with fault currents ranging from approximately 9.2 kA to 19.3 kA. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers, radiometers, and slug calorimeters at various locations around the electrical enclosures. Environmental measurements of breakdown, conductivity and electromagnetics were also taken. The experiments were documented with normal and high-speed videography, infrared imaging and photography. The results, while limited, indicated the difficulty in maintaining and sustaining low-voltage arcs on aluminum components of sufficient duration and at a single point as observed operating experience.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond

If power systems transition to integrate higher amounts of variable renewable energy sources, storage technologies, and distributed energy resources (DERs), new risk management frameworks are necessary to ensure cost-effective and reliable power system operations. Projects funded by the Advanced Research Projects Agency-Energy (ARPA-E) Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program aim to contribute new risk management frameworks by developing methods to quantify and manage risk at grid asset and system levels. The National Renewable Energy Laboratory (NREL) led a PERFORM project in collaboration with the Johns Hopkins University, the Electric Power Research Institute (EPRI), kWh Analytics, Packetized Energy, and Imperial Consultants (ICON). The project addressed two challenges related to risk management in electricity markets: managing net load imbalances and flexibility from DERs. This final technical report presents a list of project accomplishments, activities, and outputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report on High Energy Arcing Fault Experiments: Experimental Results from Open Box Enclosures

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena. The experiments focus on providing data to better characterize the arc to improve the prediction of arc energy emitted during a HEAF event. An open box experiment allow for direct observation of the arc, which allows diagnostic instrumentation to record the phenomenological data needed for better characterization of the arc energy source term. The data collected supports characterization of the arc and arc jet, enclosure breach, material loss, and electrical properties. These results will be used to better characterizing the hazard for improvements in fire probabilistic risk assessment (PRA) realism. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the NRC, the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA Labs. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setup and execution. The HEAF experiments were performed between August 22, 2020 and September 18, 2020 on near-identical 51 cm (20 in) cube metal boxes suspended from a Unistrut support structure. The three-phase arcing fault was initiated at the ends of the conductors oriented vertically and located at the center of the box. Either aluminum or copper conductors were used for the conductors. The low-voltage experiments used 1 000 volts AC, while the medium-voltage experiments used 6 900 volts AC consistent with other recently completed experiments. Durations of the experiment ranged from 1 s to 5 s with fault currents ranging from 1 kA to 30 kA. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers, radiometers, and slug calorimeters at various locations around the electrical enclosures. The experiments were documented with normal and high-speed videography, infrared imaging and photography.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Space Technology for the Iron Foundry

Electric Power Research Institute (EPRI) initiated development of a plasma melter intended to solve a major problem in the U.S. foundry industry. EPRI is a non-profit organization that manages research and development for some 600 electric utility member companies. For the plasma melter program, EPRI enlisted as co-sponsors Westinghouse Electric's Environmental Systems and Services Division, General Motors Corporation, and Modern Equipment Company, supplier of equipment and services to the foundry industry. General Motor's plasma melter, first in the U.S., is an advanced technology system designed to improve the efficiency of coke-burning cupolas that melt iron to produce automotive castings. The key elements are six Westinghouse plasma torches. Electrically-powered plasma torch creates an ionized gas that superheats air entering the cupola to 10,000 degrees Fahrenheit. That great heat, three times higher than that attainable by oil or natural gas systems, is the key to making iron cheaper, cleaner, and faster. System offers an environmental bonus in reduced cupola emissions. Plasma torches increase GM's electric bill at Defiance, but that cost is more than compensated by the savings in charge material. The EPRI-sponsored Center for Materials Production (CMP) is evaluating the potential of plasma cupola technology.

Source record↗

Grid-Ready Energy Analytics Training with Data (“GREAT with Data”)

GridEd is a collaborative educational initiative consisting of the Electric Power Research Institute (EPRI), 5 Partner Universities (Stony Brook University, The University of Texas at Austin, University of California – Riverside, Virginia Tech, Washington State University), and participating industry sponsors. This educational initiative focuses on developing and training the next generation of power engineers so they can help shape the electric grid of the future by anticipating and fulfilling the needs of changing electric industry requirements. GridEd is leveraging electric industry research to educate a future electric grid workforce by empowering new and continuing education students, not only to become competent and well-informed engineers, but also to participate and influence major technological, social, and policy decisions that address critical global challenges. GridEd’s activities are centered around four core pillars: Enhancement of university power systems engineering curricula; Professional development and training for a diverse electric industry workforce; Stimulating students to join the movement for the next generation of power engineers, and; Improve workforce development efforts in the electric utility industry. Major accomplishments over the course of the project were: Over 50 unique professional short courses were delivered by more than 30 instructors across the GridEd network; Over 3,600 unique learners, many who took multiple courses, received more than 27,000 professional development hours (PDH) and over 1,000 certificates of completion; Approximately 2,900 unique learners undertook a course that was offered LIVE online or in-person; Approximately 700 unique learners undertook a course that was offered as computer-based training (CBT); Over 35 unique university courses were delivered by more than 30 instructors to 1,500 university students across the GridEd network; One-hundred-and-fifty-seven (157) students were funded to completed 43 student projects in topics of power systems and data science, and; Six (6) Historically Black Colleges and Universities (HBCUs) recruited as Affiliate Universities via Utility Partners. The professional training initiative and workforce development activities launched by this project will be sustained through EPRI’s collaborative business model with industry. Stimulating students to join the power engineering workforce of the future and the enhancement of tertiary training may continue to need government support.

14 SOLAR ENERGY↗

Assessment of EPRI’s Tan Delta Approach to Manage Cables in Submerged Environments: Statistical Review of EPRI Data

Research conducted by the Electric Power Research Institute (EPRI) and other research institutions have concluded that water-trees are one of the leading degradation mechanisms that contribute to the loss of dielectric insulation strength in medium-voltage cable insulating materials in wet or submerged environments. The electrochemical reactions are caused by the combined effect of water presence and relatively high electrical stress. Records of cable failures provided by the licensees in response to Generic Letter (GL) 2007-01 (NRC 2007) have called into question the reliability of medium voltage cables in wetted or submerged environments. EPRI’s dissipation factor or Tan Delta testing guidelines and acceptance criteria have been adopted by most nuclear power plant operators as the primary tool for condition monitoring of medium voltage cables in wet or submerged environments. EPRI has been collecting member data since late 2009 to analyze and provide feedback to members, validate the EPRI-developed acceptance criteria guidelines, support analysis of test results, recommend appropriate actions for the "action required" category, and gather candidate cables for EPRI-sponsored forensic research on causes for insulation degradation. EPRI has collected data from 37 nuclear sites, which represent 44 operating units. The test results have been organized by insulation type, such as cross-linked polyethylene (XLPE); butyl rubber; black, pink, and brown ethylene-propylene rubber (EPR); and compact insulation (black and pink EPR)1. The data have been analyzed, and follow-up information was obtained from members for “action required” test results. EPRI has also performed correlations between Tan Delta tests and the information gathered under the EPRI forensic research on medium-voltage cables. In addition, EPRI has developed guidance by cable insulation type on how to systematically analyze Tan Delta test results. The analysis described here reviewed the two primary EPRI reports (EPRI 3002000557 and EPRI 3002005321) as well as two precedent EPRI reports (EPRI 1028262 and EPRI 1021070) that were cited in the primary reports. The principal results and conclusions from the project analyses are provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of historic fires to determine most frequent challenging events

The fire probabilistic risk assessment framework for nuclear power plants relies on experimental data to determine expected fire behavior or to validate models to predict fire conditions in the plant. To support reducing the uncertainty in this experimental data, a research effort was conducted to identify the most frequent and challenging fire scenarios using historic fire data from nuclear power plants in the United States. To support this effort, an electronic version of the publicly available Updated Fire Event Database developed by Electric Power Research Institute was produced resulting in data on 2111 fire events, 540 events were labelled as being challenging fires with 74.2% of these challenging fire events being due to eleven selected fire types. In conclusion, of these fire types, electrical and electronic equipment, transient combustibles, and liquid fires were the most frequent of the challenging fires. The fire scenario specifics were characterized for each of the eleven selected types and then related to existing fire experiments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Improved Models of Long-Term Creep Behavior of High Performance Structural Alloys

In this program, QuesTek Innovations LLC, a leader in the field of computational materials design, proposes to develop a robust creep-modeling toolkit that expands its computational Materials by Design® technology, in order to predict the long-term creep performance of materials for base alloys and weldments in fossil energy systems under wide thermal and mechanical conditions. The Material Database Group of NIMS (National Institute for Material Science, JAPAN) provides reliable public data for long-term creep behavior over 300,000 hours (> 34 years) for a variety of materials including high Cr steels along with seminal work performed by EPRI (Electric Power Research Institute) on creep failure of these steels. QuesTek would rely on these premier institutions for experimental data needed to calibrate models. The developed tool has wider applications than the state-of-the-art modeling tools. It includes the effects of chemistry variations, microstructure variation (weldments) etc .which is lacking in many available models requiring the model to be calibrated to large number of datasets for accurate predictions. A model based on fundamental mechanism has promises in application to different materials, other than the demonstrated material (Grade 91 steels) in the current program. As a result of such an effort, we envision greatly advancing the state-of-the-art modeling tools for creep life assessments of different materials.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced CO 2 Capture Solvent Systems for Dynamic Power Generation

RTI International, in collaboration with Pacific Northwest National Laboratory (PNNL), Carbon Capture Simulation for Industry Impact (CCSI 2 ), Electricity Power Research Institute (EPRI), and West Virginia University (WVU), successfully completed a joint research effort in developing a cost-effective, resilient, load-following advanced CO 2 capture technology for natural gas power plants. The project’s objective was to develop a CO 2 capture process that maximizes the net present value (NPV) of the electricity sale by minimizing the levelized cost of electricity (LCOE) under dynamic plant loads and high renewable penetration environments. The two key innovations developed in this project were the use of (i) advanced water-lean solvents (WLSs) and (ii) process intensification equipment, such as a rotating packed bed (RPB) absorber and dual-stage flash regeneration. The process’s low CO 2 capture cost is realized through WLSs’ low energy required for solvent regeneration, which lowers the operating cost while RPBs intensify the absorption process and reduces the power plant capital cost. A suite of advanced computational and simulation packages was implemented to guide the process design, validate the dynamic response of the capture plant, evaluate system-wide performance, and maximize the power plant’s profit. The project also engaged with power producers and other stakeholders to ensure its technical relevance and techno-economic viability. The development of this highly disruptive CO 2 capture technology could accelerate the industry adoption and thereby lower the greenhouse gas emissions of the U.S. power sector. Deployment of this technology can increase the reliability and decrease the cost of electricity generation in the U.S. by enabling the use of low-carbon fossil fuels to balance fluctuations of renewable energy availability.

03 NATURAL GAS↗

Front-End Engineering Design Study for Retrofit Post-Combustion Carbon Capture on a Natural Gas Combined Cycle Power Plant

The objective of the project is to conduct a Front-End Engineering Design (FEED) study to determine the technical and economic feasibility of installing a retrofit, post-combustion, carbon capture facility on a commercially operating, natural gas-fired, combined cycle (NGCC) power plant. The Electric Power Research Institute (EPRI), California Resources Corporation (CRC), and Fluor Corporation used Fluor's Econamine FG Plus SM (EFG+) conducted the FEED study for capturing CO 2 produced by CRC's 550 MWe Elk Hills Power Plant (EHPP), located in the Elk Hills Oil Field near Tupman, Kern County, California. The EHPP was commissioned in 2003 and is powered by two General Electric 7FA gas turbines, with two heat recovery steam generators (HRSGs) providing steam to a General Electric D11 steam turbine. The target capture amount is 4,000 tonnes CO 2 /day for use in either enhanced oil recovery or dedicated geological saline storage located on CRC property at or nearby EHPP. This CO 2 is captured from a combination of the CO 2 emitted from the flue gas from EHPP and the flue gas generated from a natural gas-fired auxiliary boiler that supplies steam to the EFG+ process.

03 NATURAL GAS↗

First Phase Consensus Roadmap for Development of Condition-Based Cable Reliability Assurance

The objective of this work was to develop a first phase consensus roadmap for condition-based qualification (CBQ) of electrical cables. With CBQ, qualification of Class 1E electrical cables moves from a time-based approach to a condition-based approach, which is anticipated to be safer in terms of reliability and conservatism, and more cost effective in the long run. However, due to barriers, the CBQ approach has not yet been adopted by U.S. nuclear power plants (NPPs). Based upon a review of current work evaluating CBQ, the limitation of available condition monitoring technology seems to be the largest barrier. The importance of condition monitoring, or more specifically selecting appropriate condition indicators, during CBQ cannot be understated. However, selecting appropriate condition indicators is challenged by techniques that are destructive and only evaluate cable degradation locally. Further, arguably, no one identified condition indicator fully establishes cable condition. Thus, additional work is necessary to evaluate potential condition indicators towards CBQ. In addition to the requirements of IEC/IEEE Std. 60780-323, ideal condition indicators should include a) both destructive and non-destructive approaches, b) both local and global measurements, c) real-time (i.e., online) monitoring that trends with degradation, d) enable correlation with qualified levels of degradation, and e) be established within a repository of condition indicators with applicable materials and/or components and their acceptance criteria. Additional work is needed in development of technology and methodology prior to adoption of CBQ, especially for extending qualified life of installed components. Education and early experience by the industry and regulators will be required for this change in approach as an alternative to re-analysis. A series of workshops that bring together stakeholders to identify and address gaps will be needed. The longstanding cooperative working group of cable researchers from the U.S. Department of Energy, the Electric Power Research Institute, and the Nuclear Regulatory Commission forms a valuable starting point for development of a consensus roadmap to condition-based qualification approach as a viable options for qualification of cable systems in U.S. light water reactors.

42 ENGINEERING↗

PACT Center: Perovskite PV Accelerator for Commercializing Technologies (Final Technical Report)

The Perovskite PV Accelerator for Commercializing Technologies (PACT) center was established in July 2021 as a national resource to accelerate the commercialization of perovskite photovoltaic (PV) technology in the United States. Since its inception, PACT has been led by Sandia National Laboratories (Sandia) in partnership with the National Laboratory of the Rockies (NLR), formerly known as NREL. From FY20-FY23, Los Alamos National Laboratory (LANL), CFV Labs, Black & Veatch (B&V), and the Electric Power Research Institute (EPRI) were part of the project team. LANL brought expertise in perovskite PV device designs and processing, CFV Labs (now GroundWork Renewables) provided initial indoor and outdoor measurement hardware technology, B&V led the initial effort on perovskite PV bankability, and EPRI worked on reviewing testing standards, identifying commercialization gaps, and helping to run PACT’s Industry Advisory Board, a group including representatives from commercial testing labs, independent engineering firms, insurance companies, state regulators, and electric utilities. To source perovskite PV module samples, PACT contracted with the University of North Carolina (UNC), the University of Toledo, the University of Washington, and SLAC/Stanford University to provide a steady stream of research-grade perovskite mini modules, enabling protocol development in advance of commercial module availability. The project period ran from July 1, 2021, through December 31, 2025, including a No Cost Extension. Starting in FY25, the project was continued as a Core Capability in the Lab Call portfolio and continues at a reduced budget with only Sandia and NLR as funded recipients. Notably, starting in FY25 PACT expanded its scope beyond MHP modules to accept all emerging PV mini module technologies for testing, including organic PV (OPV) and all-thin-film tandems, with the aim of supporting commercialization across the broader emerging PV ecosystem. With this change in scope the program was renamed the PV Accelerator for Commercializing Technologies, dropping perovskite from the name.

14 SOLAR ENERGY↗

Valuation of Hydrogen Technology on the Electric Grid Using Production Cost Modeling: Cooperative Research and Development Final Report, CRADA Number CRD-18-00736

This research project will estimate the value to the United States electric grid of deploying hydrogen technology (such as electrolyzers and hydrogen-fueled generation) under projected conditions of high renewable penetration. The analysis will advance the state of the art in systems-level cost-benefit analysis of hydrogen technology for the electric grid by incorporating production cost modeling results in the analysis. Large-scale grid simulation tools will be used to evaluate total system production cost and grid operation when hydrogen technology is deployed for applications such as energy storage and demand response. Scenarios will include one or more future grid mixes in the Western Interconnect (WI) with a high proportion of intermittent renewables. Electric Power Research Institute (EPRI) will work with four utility companies to refine scenarios. Results of the analysis will include comparing the net cost of hydrogen to other technologies for long duration storage, and of power-to-gas (P2G) scenarios including merchant hydrogen sale and hydrogen-fueled generation.

08 HYDROGEN↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase II Pre-Front End Engineering Design Study)

GTI Energy (GTI) and team members Southern Company Services (SCS), Pacific Gas & Electric (PG&E) and the Electric Power Research Institute (EPRI) performed a Phase II Pre-Feed Study under contract DE-FE0032008 for Hydrogen Storage for Load-Following and Clean Power. The configuration of the proposed system consists of subsystems for on-site H 2 production, on-site H 2 storage (up to 54 MWth in commercial vessels) and H 2 combustion in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with an existing fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load and H 2 production is relatively constant by storing H 2 . The proposed system is an improvement over alternate low carbon dispatchable power options. Technoeconomic analyses show H 2 produced with GTI’s patented Compact Hydrogen Generator (CHG) with inherent carbon capture will be lower cost (Levelized Cost of Hydrogen, LCOH) relative to hydrogen produced with a Steam Methane Reformer (SMR) with an amine system for carbon capture. This lower cost hydrogen enables our integrated system to deliver electricity (Levelized Cost of Electricity, LCOE) at 17.4% lower cost relative to a SMR sourced H 2 -fired HRSG (with an amine system for carbon capture) – Steam Turbine Generator (STG). Our analysis using EPRI’s US REGEN macroeconomic model shows our system will have significant demand in the power market and therefore require significant capacity expansion (CHG plants built to deliver hydrogen) to deliver low cost, low carbon power. In Phase II, our Team has completed a detailed system definition including the development of process models, definition of battery limits, Process Flow Diagrams (PFDs), Piping and Instrumentation Drawings (P&IDs), and a plant layout. A preliminary design for the key components of the CHG was developed including component lists & specifications. An evaluation of environmental and permitting considerations was completed and included the development of an Environmental Information Volume (EIV). The duct burners, which are flexible and can burn hydrogen and/or natural gas, were defined and initial CFD analyses were completed.

03 NATURAL GAS↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study (Final Report)

The Following Document is the Final Technical Scientific Report for the project tittle “10 MWE CDCL Large Pilot Plant – pre-FEED Study” performed by The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and the Dover Light & Power Municipal Power Plant. The project Team performed a pre-Front End Engineering Design study of a 10 MWe Coal-Direct Chemical Looping power plant to be hosted at the Dover Light & Power Municipal Plant. As part of the pre-FEED study, the project Team performed multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Techno-Economic analysis was updated based on the FEED study and the pilot tests results. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with a high efficiency with a cost of electricity of $83.3 / MWh, which corresponded to less than 30% increase in cost of electricity compared to the cost of electricity of a base case study of a supercritical PC boiler.

01 COAL, LIGNITE, AND PEAT↗