Search NASA⌕ Search

SEARCH · Search NASA

Results for “Energy Recovery Linacs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Energy-Recovery Linacs for Commercial Radioisotope Production

Most radioisotopes are produced by nuclear reactors or positive ion accelerators, which are expensive to construct and to operate. Photonuclear reactions using bremsstrahlung photon beams from less-expensive electron linacs can generate isotopes of critical interest, but much of the beam energy in a conventional electron linac is dumped at high energy, making unwanted radioactivation. The largest part of this radioactivation may be completely eliminated by applying energy recovery linac technology to the problem with an additional benefit that the energy cost to produce a given amount of isotope is reduced. Consequently, a Superconducting Radio Frequency (SRF) Energy Recovery Linac (ERL) is a path to a more diverse and reliable domestic supply of short-lived, high-value, high-demand isotopes at a cost lower than that of isotopes produced by reactors or positive-ion accelerators. A Jefferson Lab approach to this problem involves a thin photon production radiator, which allows the electron beam to recirculate through rf cavities so the beam energy can be recovered while the spent electrons are extracted and absorbed at a low enough energy to minimize unwanted radioactivation. The thicker isotope photoproduction target is not in the beam. MuPlus, with Jefferson Lab and Niowave, proposed to extend this ERL technology to the commercial world of radioisotope production. In Phase I we demonstrated that 1) the ERL advantage for producing radioisotopes is at high energies (~100 MeV), 2) the range of acceptable radiator thickness is narrow (too thin and there is no advantage relative to other methods and too thick means energy recovery is too difficult), 3) using optics techniques developed under an earlier STTR for collider low beta designs greatly improves the fraction of beam energy that can be recovered (patent pending), 4) many potentially useful radioisotopes can be made with this ERL technique that have never before been available in significant commercial quantities. We developed a plan for the Phase II project that started with a Conceptual Design Report (CDR) based on the results of the Phase I studies and concluded with a Technical Design Report (TDR) for a facility to make isotopes that are most attractive based on market analyses.

43 PARTICLE ACCELERATORS↗

Experimental exploration of compressed beam dynamics in an energy recovery linac with comparison to simulations

The compact energy recovery linac (cERL) has been developed for industrial applications since 2017. Applications such as free electron laser require a compressed beam with a small energy spread and transverse emittance. The typical operation energy of cERL is an intermediate energy region close to 17.5 MeV; therefore, the electron bunch is easily affected by the longitudinal space-charge effects and the coherent synchrotron radiation wakefield effects. Bunch compression is demonstrated by optimizing a combination of a longitudinally chirped electron bunch and the arcs with nonzero R 56 parameters. When the bunch compression procedure is applied for a bunch charge of 60 pC, an increase in energy spread is observed at the short bunch length. We systematically explored the chirp phase to determine the best condition. The measurement results of the energy spread, bunch length, and transverse emittance were compared with the tracking simulation results to understand the compressed beam dynamics.

47 OTHER INSTRUMENTATION↗

Operation of an Energy Recovery Linac with an Internal Target

Because an Energy Recovery Linac (ERL) decelerates and dumps the beam after at most a few passes, beam degradation in the interaction region that is orders of magnitude larger than in a storage ring is tolerable in such a device. As a consequence, some new types of Nuclear Physics experiments can be carried out. In 2016, an experiment (the DarkLight experiment) was installed in the Jefferson Lab FEL Driver ERL to test out this idea. The ERL had previously been used for FEL applications where high peak current and a large growth in energy spread was present. For the internal target, the machine setup required very small energy spread, and had to deal with large transverse emittance growth in the target. Additionally, the addition of a strong solenoid in the transport complicated the details of energy recovery. This presentation will describe how these new machine physics challenges were addressed.

Benson, S. V.↗

Design Construction and Test Results of a HTS Solenoid For Energy Recovery Linac

An innovative feature of the proposed Energy Recovery Linac (ERL) is the use of a solenoid made with High Temperature Superconductor (HTS) with the Superconducting RF cavity. The use of HTS allows solenoid to be placed in close proximity to the cavity and thus provides early focusing of the electron beam. In addition, cryogenic testing at {approx}77 K is simpler and cheaper than 4 K testing. This paper will present the design, construction and test results of this HTS solenoid. The HTS solenoid in the proposed ERL will be situated in the transition region between the superconducting cavity at {approx}4 K and the cryostat at the room temperature. Solenoid inside the cryogenic structure provides an early focusing and hence low emittance beam. The temperature in the transition region will be too high for a conventional low temperature superconductor and resistive heat load from copper coils will be too high on cryogenic system. HTS coils also allow much higher current density and significant reduction in size as compared to copper coils. Hence HTS solenoid provide a unique and technically superior solution. The use of a HTS solenoid with superconducting cavity offers a unique option as it can be placed in a cold to warm transition region to provide early focussing without using additional space. Construction and test results so far are very encouraging for its use in the ERL project.

43 PARTICLE ACCELERATORS↗

Initial performance of the magnet system in the splitter/combiner section of the Cornell-Brookhaven Energy-Recovery Linac Test Accelerator

The Cornell-Brookhaven Energy-recovery Linac Test Ac- celerator is a four-pass, 150-MeV electron accelerator with a six-cell 1.3 GHz superconducting-RF linear accelerator and a fixed-field alternating-gradient (FFAG) return loop made up of Halbach-style quadrupole magnets. The optics matching between the linear accelerator and the return loop is achieved with a conventional magnet system comprised of 50 dipole magnets and 64 quadrupole magnets in four beamlines at each end of the linac. The 42-, 78-, 114- and 150-MeV electron beams are separated into independent vacuum chambers in order to allow for the path-length ad- justment required by energy recovery. We report on the first beam tests of the initial installation of the splitter/combiner section at the exit of the linac. The vacuum system of the 42-MeV S1 line was installed during the first week of April. Nine dipole and four quadrupole magnets were installed and surveyed into position the following week, and the water cooling system was commissioned. A 6-MeV beam passed through the line on April 11 with no need for adjusting pre-set magnet excitation currents. One week later, time- of-flight measurements were used to calibrate and phase the individual superconducting RF cavities. The S1 magnet settings were then scaled up to achieve 5-cavity, 42-MeV operation through the first nine FFAG permanent-magnet quadrupoles. This initial Fractional Arc Test will conclude on May 18, when the installation of the remaining seven split- ter/combiner lines and the return loop will begin. CBETA operations are scheduled to begin in early 2019.

43 PARTICLE ACCELERATORS↗

Magnet design for the splitter/combiner regions of CBETA, the Cornell-Brookhaven Energy-Recovery-Linac Test Accelerator

The Cornell-Brookhaven Energy-Recovery-Linac Test Accelerator (CBETA) will provide a 150-MeV electron beam using four acceleration and four deceleration passes through the Cornell Main Linac Cryomodule housing six 1.3-GHz superconducting RF cavities. The return path of this 76-m-circumference accelerator will be provided by 106 fixed-field alternating-gradient (FFAG) cells which carry the four beams of 42, 78, 114 and 150 MeV. Here we describe magnet designs for the splitter and combiner regions which serve to match the on-axis linac beam to the off-axis beams in the FFAG cells, providing the path-length adjustment necessary to energy recovery for each of the four beams. The path lengths of the four beamlines in each of the splitter and combiner regions are designed to be adapted to 1-, 2-, 3-, and 4-pass staged operations. Design specifi- cations and modeling for the 24 dipole and 32 quadrupole electromagnets in each region are presented. The CBETA project will serve as the first demonstration of multi-pass energy recovery using superconducting RF cavities with FFAG cell optics for the return loop.

43 PARTICLE ACCELERATORS↗

Comprehensive tracking study for the H-dipoles and common magnets in the splitter sections of the Cornell/Brookhaven Energy-Recovery-Linac Test Accelerator

The Cornell-Brookhaven Energy-Recovery-Linac Test Accelerator will have two splitter sections responsible for and guiding beams of 42, 78, 114, and 150 MeV energies between the Fixed-Field Alternating Gradient return loop and the Main Linac Cryomodule [6], correcting optics, and providing path length adjustments. Modeling of all 36 H-dipole magnets under contract with Elytt Energy has been completed. Four common dipoles, two of which are needed for next year’s Fractional Arc Test, will be added to the order with Elytt. The design of these magnets is underway. This report describes the findings of the tracking studies of the 36 H-dipoles and gives the status of the common dipoles.

43 PARTICLE ACCELERATORS↗

Design, construction, system integration, and test results of the 1 MW CW RF system for the e-gun cavity in the energy recovery LINAC at Brookhaven National Laboratory

Brookhaven's ERL (Energy Recovery LINAC) requires a 1 MW CW RF system for the superconducting electron gun cavity. The system consists primarily of a klystron tube, transmitter, and High-Voltage Power Supply (HVPS). The 703.75 MHz klystron made by CPl, Inc. provides RF power of 1MW CW with efficiency of 65%. It has a single output window, diode-type electron gun, and collector capable of dissipating the entire beam power. It was fully factory tested including 24-hour heat run at 1.1 MW CWo The solid state HVPS designed by Continental Electronics provides up to 100 kV at low ripple and 2.1 MW CW with over 95% efficiency. With minimal stored energy and a fast shut-down mode no crowbar circuit is needed. Continental 's transmitter includes PLC based user interface and monitoring, RF pre-amplifier, magnet and Vac-Ion pump supplies, cooling water instrumentation, and integral safety interlock system. BNL installed the klystron, HVPS, and transmitter along with other items, such as circulator, water load, and waveguide components. The collaboration of BNL, CPI, and Continental in the design, installation, and testing was essential to the successful operation of the 1MW system.

43 PARTICLE ACCELERATORS↗

Energy Recovery Linac: Low Level RF

A superconducting RF (SRF) Energy Recovery Linac (ERL) is currently under development at the Collider‐Accelerator Department (C‐AD) at Brookhaven National Laboratory (BNL). The major components from an RF perspective are a) a 5‐cell SRF ERL cavity, b) an SRF photocathode electron gun, and c) a drive laser for the photocathode gun. Each of these RF subsystems has its own set of RF performance requirements, as well as common requirements for ensuring correct synchronism between them. A low level RF (LLRF) control system is currently under development, which seeks to leverage both technology and experience gained from the recently commissioned RHIC LLRF system upgrade. This note will review the LLRF system requirements and describe the system to be installed at the ERL.

43 PARTICLE ACCELERATORS↗

Modeling Challenges for Energy Recovery Linacs with Long, High Charge Bunches

Historically, nearly all energy recovery linacs (ERLs) built and operated were used to drive a free-electron laser (FEL). The requirement for high peak current bunches necessitates bunch compression and handling the attendant beam dynamical challenges. In recent years, ERLs have turned from being drivers of light sources toward applications for nuclear physics experiments, Compton backscattering sources and strong electron cooling. Unlike an FEL, these latter uses require long, high charge bunches with small energy spread. The electron bunch must maintain a small projected energy spread and therefore must avoid gross distortion due to CSR and longitudinal space charge over a single (or multiple) recirculations. Accurately modeling the relevant collective effects in the system 'space charge, microbunching instability, CSR and the effect of shielding' in addition to beam dynamical processes such as halo, presents a formidable challenge. Absent a code that models all of these effects, we outline an approach towards the design, analysis and optimization of the high-energy electron cooler for the Jefferson Lab Electron-Ion Collider and survey widely used codes and their capabilities.

Tennant, Christopher D.↗

Beam Line Design and Beam Physics Study of Energy Recovery Linac Free Electron Laser at Peking University

Energy recovering linac (ERL) offers an attractive alternative for generating intense beams of charged particles by approaching the operational efficiency of a storage ring while maintaining the superior beam quality typical of a linear accelerator. In ERLs, the decelerated beam cancels the beam loading effects of the accelerated beam with high repetition rate. Therefore, ERLs can, in principle, accelerate very high average currents with only modest amounts of RF power. So the efficiency of RF power to beam is much higher. Furthermore, the energy of beam to dump is lower, so it will reduce dump radiation. With the successful experiments in large maximum-to-injection energy ratio up to 51:1 and high power FEL up to 14kW, the use of ERL, especially combining with superconducting RF technology, provides a potentially powerful new paradigm for generation of the charged particle beams used in MW FEL, synchrotron radiation sources, high-energy electron cooling devices and so on. The 3+1/2 DC-SC photo injector and two 9cell TESLA superconducting cavity for IR SASE FEL in PKU provides a good platform to achieve high average FEL with Energy Recovery. The work of this thesis is on Beam line design and Beam dynamics study of Energy Recovery Linac Free Electron Laser for Peking University. It is the upgrade of PKU facility, which is under construction. With ERL, this facility can work in CW mode, so it can operate high average beam current without RF power constraint in main linac and generate high average FEL power. Moreover, it provides a test facility to study the key technology in ERL. System parameters are optimized for PKU ERL-FEL. The oscillation FEL output power is studied with different bunch charge, transverse emittance, bunch length and energy spread. The theory of optimal RF power and Q{sub ext} with ERL and without ERL is analyzed and applied to PKU injector and linac including microphonic effect. pace charge effect in the injector and merger is studied for beam energy at ~5MeV. Simulation shows that in the 3+1/2 DC- C injector, there is a region the beam could be over focused by RF electromagnetic field and the transverse emittance in the transport line up to linac will increase instantly due to over focusing. In order to eliminate this effect on beam emittance, several solutions are investigated to avoid over focusing. This result is very important for beam loading experiment for low bunch charge operation. Meanwhile, different merger structures are compared in terms of error sensitivity and emittance increase with space charge effect. In recirculation beam line, a new symmetric 180{degree} arc structure is designed. It fulfills the achromatic condition and adjustable bunch compression. These two parameters are controlled by different Quads knob. With this novel structure, the recirculation lattice can achieve path length adjustment, bunch compression and decompression in a large range. With beamline error, the beam central orbit will deviate from the designed trajectory. An orbit correction system is optimized, which balances between cost and performance of orbit after correction at design level. Different methods are used to estimate its robustness. The BBU instability, especially multi-pass BBU imposed a potentially severe limitation to the average current that can be accelerated in an ERL. Simulation gives the harmful HOMs and predicts that the threshold average current in this machine is much higher than the possible operation current. This work is based on the existing facility in PKU, so it provides guidelines for the facility operation and upgrade in the future. The theoretical analysis of ERL requirement and FEL requirement on beam transport line and beam property paves the way for future ERL research.

43 PARTICLE ACCELERATORS↗

Energy-Recovery Linacs for Commercial Radioisotope Production - Phase I

Most radioisotopes are produced by nuclear reactors or positive ion accelerators, which are expensive to construct and to operate. Photonuclear reactions using bremsstrahlung photon beams from less-expensive electron linacs can generate isotopes of critical interest, but much of the beam energy in a conventional electron linac is dumped at high energy, making unwanted radioactivation. The largest part of this radioactivation may be completely eliminated by applying energy recovery linac technology to the problem with an additional benefit that the energy cost to produce a given amount of isotope is reduced. Consequently a Superconducting Radio Frequency (SRF) Energy Recovery Linac (ERL) is a path to a more diverse and reliable domestic supply of short-lived, high-value, high-demand isotopes at a cost lower than that of isotopes produced by reactors or positive-ion accelerators. A Jefferson Lab approach to this problem involves a thin photon production radiator, which allows the electron beam to recirculate through rf cavities so the beam energy can be recovered while the spent electrons are extracted and absorbed at a low enough energy to minimize unwanted radioactivation. The thicker isotope photoproduction target is not in the beam. MuPlus, with Jefferson Lab and Niowave, proposed to extend this ERL technology to the commercial world of radioisotope production. In Phase I we demonstrated that 1) the ERL advantage for producing radioisotopes is at high energies (~100 MeV), 2) the range of acceptable radiator thickness is narrow (too thin and there is no advantage relative to other methods and too thick means energy recovery is too difficult), 3) using optics techniques developed under an earlier STTR for collider low beta designs greatly improves the fraction of beam energy that can be recovered (patent pending), 4) many potentially useful radioisotopes can be made with this ERL technique that have never before been available in significant commercial quantities. We developed a plan for the Phase II project that started with a Conceptual Design Report (CDR) based on the results of the Phase I studies and concluded with a Technical Design Report (TDR) for a facility to make isotopes that are most attractive based on market analyses.

07 ISOTOPE AND RADIATION SOURCES↗

Novel "Straight" Merger for Energy Recovery Linacs

One of the most critical design considerations for an energy recovery linac (ERL) is how to merge the injected bunch onto the linac axis with minimal beam degradation. All merger designs in established and upcoming machines involve significant bending of the injected beam ’ even using a so-called straight merger bends the injected beam several degrees. We propose a merger which reduces the bending of the injected beam by an order of magnitude. By passing both beams through a septum magnet followed by an rf separator cavity with a superimposed dipole magnetic field, the injected beam bends minimally within the cavity, while the recirculated beam bends to align with the linac axis. Here we describe the concept in detail and present simulation results to demonstrate the advantages of such a design, particularly for magnetized beams or minimal energy separation between the injected and recirculated beams. Measurements from an experiment at CBETA evaluating the beam dynamics of the rf separator are presented and compared with simulation results.

Deitrick, K. E.↗

Beam breakup instability studies of powerful energy recovery linac for experiments

The maximum achievable beam current in an energy recovery linac (ERL) is often constrained by beam breakup (BBU) instability. Our previous research highlighted that filling patterns have a substantial impact on BBU instabilities in multipass ERLs. In this study, we extend our investigation to the eight-cavity model of the Powerful ERL for Experiment (PERLE). We evaluate its requirements for damping cavity higher order modes (HOMs) and propose optimal filling patterns and bunch timing strategies. Our findings reveal a significant new insight: while filling patterns are crucial, the timing of bunches also plays a critical role in mitigating HOM beam loading and BBU instability. This previously underestimated factor is essential for effective BBU control. We estimated the PERLE threshold current using both analytical and numerical models, incorporating the designed PERLE HOM dampers. During manufacturing, HOM frequencies are expected to vary slightly. Our study found no significant difference in BBU suppression for relative rms frequency jitters of 0.001, 0.002, and 0.005 for the same HOM. Introducing a jitter of 0.001 into our models, we found that the dampers effectively suppressed BBU instability, achieving a threshold current an order of magnitude higher than the design requirement. Our results offer new insights into ERL BBU beam dynamics and have important implications for the design of future ERLs. Published by the American Physical Society 2025

43 PARTICLE ACCELERATORS↗

Status of high current R&D Energy Recovery LINAC at Brookhaven National Laboratory

An ampere class 20 MeV superconducting Energy Recovery Linac (ERL) is under construction at Brookhaven National Laboratory (BNL) for testing of concepts relevant for high-energy coherent electron cooling and electron-ion colliders. One of the goals is to demonstrate an electron beam with high charge per bunch ({approx} 5 nC) and low normalized emittance ({approx} 5 mm-mrad) at an energy of 20 MeV. Flexible lattice of ERL loop provides a test-bed for investigating issues of transverse and longitudinal instabilities, and diagnostics for intense CW e-beam. The superconducting 703 MHz RF photoinjector is considered as an electron source for such a facility. We will start with a straight pass (gun - 5 cell cavity - beam stop) test for the SRF Gun performance studies. Later, we will install and test a novel injection line concept for emittance preservation in a lower energy merger. In this paper we present the status and our plans for construction and commissioning of this facility.

43 PARTICLE ACCELERATORS↗

R&D Energy Recovery Linac at Brookhaven National Laboratory

Collider Accelerator Department at BNL is in the final stages of developing the 20-MeV R&D energy recovery linac with super-conducting 2.5 MeV RF gun and single-mode super-conducting 5-cell RF linac. This unique facility aims to address many outstanding questions relevant for high current (up to 0.5 A of average current), high brightness energy-recovery linacs with novel Zigzag-type merger. We present the performance of the R&D ERL elements and detailed commissioning plan.

43 PARTICLE ACCELERATORS↗

R and D energy recovery LINAC at Brookhaven National Laboratory

Collider Accelerator Department at BNL is in the final stages of developing the 20-MeV R and D energy recovery linac with super-conducting 2.5 MeV RF gun and single-mode super-conducting 5-cell RF linac. This unique facility aims to address many outstanding questions relevant for high current (up to 0.5 A of average current), high brightness energy-recovery linacs with novel ZigZag-type merger. Recent development in the R and D ERL plans include gun and 5-cell cavity (G5) test and possibility of using R and D ERL for proof-of-principle test of Coherent Electron Cooling at RHIC.

43 PARTICLE ACCELERATORS↗

Beam dynamics driven design of powerful energy recovery linac for experiments

Powerful ERL for experiments (PERLE) is a novel energy recovery linac (ERL) test facility [1], designed to validate choices for a 50 GeV ERL foreseen in the design of the Large Hadron Electron Collider and the Future Circular Collider and to host dedicated nuclear and particle physics experiments. Its main goal is to demonstrate the high current, continuous wave, multipass operation with superconducting cavities at 802 MHz. With very high beam power (10 MW), PERLE offers an opportunity for controllable study of every beam dynamic effect of interest in the next generation of ERLs and becomes a “stepping stone” between the present state-of-the-art 1 MW ERLs and the future 100 MW scale applications. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗